Slab shuttering is checked by ensuring proper alignment, levelness, and stability of formwork before concrete pouring.
Check alignment of formwork with respect to the structural drawings
Ensure formwork is level using a spirit level
Inspect the stability of formwork to prevent any collapse during concrete pouring
Check for any gaps or misalignments in the formwork that may affect the quality of the slab
Verify that all nece...
Concrete quantity can be calculated by multiplying the volume of the area to be filled by the density of the concrete.
Calculate the volume of the area to be filled (length x width x height)
Determine the density of the concrete (usually around 2400 kg/m^3)
Multiply the volume by the density to get the total concrete quantity needed
Consider adding a percentage for wastage or spillage
Lapping is provided in columns to ensure proper bonding between the column reinforcement and the beam reinforcement.
Lapping is typically provided at the junction of vertical and horizontal reinforcement bars in columns.
It helps in transferring the load from the column to the beam effectively.
The length of lapping required is specified in the structural drawings or as per design requirements.
Proper lapping ensures struc...
I applied via Company Website and was interviewed in Jan 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Mar 2023. There were 5 interview rounds.
Stock checking salary record maintain
Salary checking from payment labour
Work group discussion and company work discuss
I applied via Referral and was interviewed before Aug 2020. There were 3 interview rounds.
BBS preparation is essential for ensuring the strength and stability of footings and slabs.
BBS stands for Bar Bending Schedule and involves preparing a detailed list of reinforcement bars required for the footing or slab.
The BBS takes into account the design drawings and specifications to ensure the correct size, spacing, and placement of reinforcement bars.
The BBS also helps to estimate the quantity of steel required ...
The quantity of cement and sand in 1sqm plastering depends on the thickness of the plaster.
The thickness of the plaster is a crucial factor in determining the quantity of cement and sand.
The ratio of cement to sand also affects the quantity.
For a 15mm thick plaster, the approximate quantity of cement is 16 kg and sand is 75 kg per square meter.
For a 20mm thick plaster, the approximate quantity of cement is 21 kg and sa
I manage projects by setting clear goals, creating a detailed plan, delegating tasks effectively, monitoring progress, and adjusting as needed.
Set clear goals and objectives for the project
Create a detailed project plan outlining tasks, timelines, and resources
Delegate tasks to team members based on their strengths and expertise
Monitor progress regularly and address any issues or delays promptly
Adjust the project plan
I applied via Recruitment Consulltant and was interviewed in Oct 2022. There were 3 interview rounds.
Warehouse IT setup involves hardware, software, and network infrastructure to manage inventory and logistics.
Hardware includes barcode scanners, RFID readers, and mobile devices for data collection.
Software includes warehouse management systems (WMS) and enterprise resource planning (ERP) software.
Network infrastructure includes Wi-Fi, LAN, WAN, and VPN for connectivity and data transfer.
IT setup also involves security...
Datacenter management involves overseeing the operations and maintenance of a datacenter.
Datacenter management includes tasks such as monitoring server performance, managing network connectivity, and ensuring data security.
It also involves managing power and cooling systems to maintain optimal conditions for the equipment.
Datacenter managers must have knowledge of virtualization technologies, storage systems, and backu...
The setup of new offices requires careful planning and consideration of various factors.
Determine the location based on accessibility and convenience for employees and clients
Consider the layout and design of the office space to ensure maximum productivity and comfort
Plan the technology infrastructure and equipment needed for efficient operations
Establish policies and procedures for office management and maintenance
Ens
I applied via Approached by Company and was interviewed in Aug 2022. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
Assistant Manager
72
salaries
| ₹4.6 L/yr - ₹11.3 L/yr |
Senior Executive
27
salaries
| ₹4.3 L/yr - ₹7.3 L/yr |
Sales Manager
24
salaries
| ₹5 L/yr - ₹12 L/yr |
Senior Manager
21
salaries
| ₹9.2 L/yr - ₹21 L/yr |
Executive Engineer
20
salaries
| ₹3.6 L/yr - ₹6.5 L/yr |
Sobha
Godrej Properties
DLF
Surya Roshni