To calculate cement, sand and aggregate, use the mix design ratio and the volume of concrete required.
Determine the mix design ratio for the concrete
Calculate the volume of concrete required
Multiply the volume by the mix ratio to get the amount of cement, sand, and aggregate needed
Convert the volume of each material to its weight using its density
Add 5-10% extra to account for wastage and ensure there is enough materia
Density of materials refers to the mass per unit volume of a substance.
Density is measured in units of mass per unit volume, such as kg/m³ or g/cm³.
The density of a material can vary depending on temperature and pressure.
Some common materials and their densities include water (1 g/cm³), aluminum (2.7 g/cm³), and gold (19.3 g/cm³).
The thickness of a slab depends on the load it needs to bear and the type of material used.
The thickness of a slab is determined by the structural engineer during the design phase.
The load that the slab needs to bear is a crucial factor in determining its thickness.
The type of material used for the slab also affects its thickness.
For example, a concrete slab for a residential building may be 4 inches thick, while a sla...
We used 300 cement bags for the slab in our last site.
We used a total of 300 cement bags for the slab.
The amount of cement bags used may vary depending on the size of the slab.
We ensured that the cement was mixed properly to avoid any cracks in the slab.
Reinforcement BBS is calculated by determining the quantity of steel required for a particular structure.
Determine the dimensions of the structure
Calculate the total area of steel required
Determine the spacing and diameter of the bars
Calculate the total length of steel required
Prepare a detailed bar bending schedule (BBS)
posted on 6 Dec 2017
Time saving can be achieved by optimizing processes, using technology, delegating tasks, and setting priorities.
Optimize processes to eliminate inefficiencies and reduce wasted time
Utilize technology tools to automate repetitive tasks and streamline workflows
Delegate tasks to team members to distribute workload and free up time for higher priority tasks
Set clear priorities and focus on important tasks to avoid wasting
I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Feb 2021. There were 3 interview rounds.
Core is the central part of a structure or object that provides strength and stability.
Core is commonly used in construction and engineering.
It is the central part of a building or structure that provides support and stability.
In fitness, core refers to the muscles in the abdomen, back, and pelvis that support the spine.
Examples of core materials include concrete, steel, and wood.
A strong core is important for maintain
Production refers to the process of creating goods or services using resources and labor.
Production involves transforming raw materials into finished products or providing services to customers.
It includes activities such as manufacturing, assembly, packaging, and distribution.
Examples of production include car manufacturing, food processing, and software development.
Efficient production is essential for businesses to
posted on 20 Jul 2017
posted on 20 Dec 2020
posted on 29 Jan 2021
I applied via Naukri.com and was interviewed in Jan 2023. There were 3 interview rounds.
Exam will be conduct for aptitude test
posted on 16 Sep 2022
I applied via Company Website and was interviewed in Aug 2022. There was 1 interview round.
Slump test is a measure of the consistency of fresh concrete.
It is used to determine the workability of concrete.
The test involves filling a standard cone-shaped container with concrete and then removing the cone to see how much the concrete slumps or settles.
The amount of slump is measured in millimeters and indicates the wetness or dryness of the concrete.
Curing is the process of maintaining moisture in the concrete ...
based on 12 reviews
Rating in categories
Site Engineer
73
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
43
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
19
salaries
| ₹0 L/yr - ₹0 L/yr |
Accountant
9
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Engineer
9
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Punj Lloyd