I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 2 interview rounds.
Human resources is responsible for managing the workforce of an organization.
Recruiting and hiring employees
Training and development of employees
Compensation and benefits management
Employee relations and conflict resolution
Performance management and evaluation
Compliance with labor laws and regulations
Flexible pavement is a type of road surface that is designed to be flexible and move with changes in temperature and traffic loads.
Made of asphalt or concrete with added bitumen or polymer
Can withstand heavy traffic and temperature changes
Commonly used in areas with high traffic volume and freeze-thaw cycles
Examples include highways, airports, and parking lots
Rigid pavement is a type of concrete pavement that is reinforced with steel bars or mesh.
It is a durable and long-lasting pavement option
It is commonly used for heavy traffic areas such as airports and industrial parks
It requires a strong foundation and careful construction to prevent cracking
Examples include jointed plain concrete pavement and continuously reinforced concrete pavement
High strength in concrete is achieved after 28 days of curing.
Concrete gains strength over time due to the chemical reaction between cement and water.
The strength of concrete is measured in terms of compressive strength.
After 28 days of curing, concrete reaches its maximum strength.
Factors like water-cement ratio, curing conditions, and type of cement used can affect the strength of concrete.
Top trending discussions
I applied via Walk-in and was interviewed in Oct 2024. There was 1 interview round.
OHT stands for Overhead Tank. It is a water storage tank placed at a height to provide water pressure for distribution.
OHT is typically placed on the roof of a building or on a tower to ensure gravity-fed water supply.
The water is pumped into the OHT from a water source like a borewell or municipal supply.
The height of the OHT determines the water pressure available for distribution.
Pipes are connected from the OHT to ...
FHTC stands for First Horizontal Tangent Point, a key element in highway design.
FHTC marks the beginning of a horizontal curve on a highway.
It is typically located at the point where the road transitions from a straight section to a curved section.
Proper placement of FHTC is crucial for ensuring safe and efficient traffic flow.
Design considerations at FHTC include curve radius, superelevation, and sight distance.
FHTC i...
I applied via Recruitment Consulltant and was interviewed before Oct 2022. There were 2 interview rounds.
Construction and maintenance of GIS buildings involves planning, design, construction, and ongoing upkeep of the facility.
GIS building construction requires detailed planning and design to ensure the facility meets the specific needs of the project.
Regular maintenance is essential to keep the GIS building in optimal condition and prevent costly repairs in the future.
Maintenance tasks may include HVAC system checks, roo...
I applied via Naukri.com and was interviewed before Dec 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed in May 2022. There were 2 interview rounds.
M20 grade of concrete has a compressive strength of 20 N/mm² after 28 days.
M20 grade of concrete is a mix of 1:1.5:3 cement, sand, and aggregate respectively.
It is commonly used for residential and commercial construction.
The compressive strength of M20 grade concrete after 28 days is 20 N/mm².
This strength can be achieved by proper curing and water-cement ratio.
I applied via Recruitment Consulltant and was interviewed before Dec 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Oct 2021. There were 3 interview rounds.
I applied via Company Website and was interviewed in Feb 2021. There were 3 interview rounds.
I applied via Indeed and was interviewed before Aug 2020. There was 1 interview round.
Piling is a construction procedure used to strengthen the foundation of a building. It involves various methods and the time taken depends on several factors.
Piling is done using methods like driven piles, bored piles, and auger cast piles.
Driven piles involve hammering precast concrete or steel piles into the ground.
Bored piles are created by drilling a hole into the ground and filling it with concrete.
Auger cast pile...
based on 2 reviews
Rating in categories
Quantity Surveyor
9
salaries
| ₹3 L/yr - ₹6 L/yr |
Civil Site Engineer
8
salaries
| ₹2 L/yr - ₹4.2 L/yr |
Accountant
6
salaries
| ₹2.8 L/yr - ₹5.2 L/yr |
Highway Engineer
5
salaries
| ₹2.1 L/yr - ₹4.8 L/yr |
Executive Accountant
5
salaries
| ₹2 L/yr - ₹3 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Punj Lloyd