Upload Button Icon Add office photos

Filter interviews by

R.S Construction Builders & Engineers Site Engineer Interview Questions and Answers

Updated 20 Jun 2022

R.S Construction Builders & Engineers Site Engineer Interview Experiences

1 interview found

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 16 Jun 2022

I applied via Recruitment Consulltant and was interviewed in May 2022. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Why you join team a d what is your goal
  • Q2. What is civil engineer and why they useful
  • Ans. 

    Civil engineers design, build, and maintain infrastructure such as roads, bridges, buildings, and water systems.

    • Civil engineers are responsible for ensuring the safety and functionality of infrastructure projects.

    • They use their knowledge of mathematics, physics, and engineering to design and plan projects.

    • They work closely with architects, contractors, and other professionals to ensure projects are completed on time an...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for R.S Construction Builders & Engineers Site Engineer interview:
  • Presentation Skills
  • Technical Skills
Interview preparation tips for other job seekers - Make confidence and do the work on your way

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - HR 

(3 Questions)

  • Q1. What is penitration test
  • Ans. 

    Penetration test is a method of evaluating the security of a computer system or network by simulating an attack from a malicious source.

    • Penetration test involves identifying vulnerabilities in a system or network.

    • It includes attempting to exploit these vulnerabilities to determine the potential impact of a real attack.

    • The goal of a penetration test is to strengthen the security defenses of the system or network.

    • Common ...

  • Answered by AI
  • Q2. What is water proofing
  • Ans. 

    Waterproofing is a process of making a structure or material resistant to the penetration of water.

    • Waterproofing involves applying materials or coatings to prevent water from seeping through surfaces.

    • It is commonly used in construction to protect buildings from water damage.

    • Examples of waterproofing materials include bituminous coatings, cementitious waterproofing, and liquid membrane systems.

  • Answered by AI
  • Q3. Types of foundation
  • Ans. 

    Types of foundation include shallow, deep, and pile foundations.

    • Shallow foundations are used when the soil is strong enough to support the structure's weight, such as spread footings and mat foundations.

    • Deep foundations are used when the soil is weak and unable to support the structure's weight, such as pile foundations and drilled piers.

    • Pile foundations are deep foundations that consist of long, slender columns driven...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What is the Density of cement?
  • Ans. 

    The density of cement is around 1440 kg/m³.

    • The density of cement varies depending on the type of cement.

    • The density of Portland cement is around 1440 kg/m³.

    • The density of lightweight cement is around 1000 kg/m³.

    • The density of high-density cement is around 3000 kg/m³.

  • Answered by AI
  • Q2. What is clear cover in column?
  • Ans. 

    Clear cover in column refers to the distance between the surface of the reinforcement and the outer surface of the concrete.

    • Clear cover is important to protect the reinforcement from corrosion and to ensure proper bonding between the reinforcement and concrete.

    • The required clear cover for columns depends on factors such as the type of structure, exposure conditions, and size of the reinforcement.

    • For example, in a coast...

  • Answered by AI
  • Q3. What is bending moment formula?
  • Ans. 

    Bending moment formula calculates the internal bending moment in a beam or structure.

    • Bending moment formula is M = F * d

    • M is the bending moment, F is the force applied, and d is the distance from the force to the point of interest

    • Bending moment can be positive or negative depending on the direction of the force and the orientation of the beam

    • Bending moment is an important factor in designing and analyzing structures

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Construction Group Site Engineer interview:
  • Bis 456
Interview preparation tips for other job seekers - Conduct interview on phone by using video call so that u can find good engineer easily.

I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Some basic questions about Ofc work and personal information
  • Q2. Ofc cable blowing how to start
  • Ans. 

    To start OFC cable blowing, follow these steps

    • Ensure that the ducts are clean and free of any obstruction

    • Attach the cable blowing machine to the duct

    • Connect the cable to the machine and start the blowing process

    • Monitor the cable's progress and adjust the machine's speed as needed

    • Once the cable has been blown through the entire length of the duct, detach the machine and cable

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Bondada Engineering Site Engineer interview:
  • Nld
  • Lm
Interview preparation tips for other job seekers - No fear in answering questions be strong
Just one interview it's enough to get job in bepl
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Hello what is your name
  • Q2. How much salary you want
Round 2 - HR 

(2 Questions)

  • Q1. Lets discuss about money
  • Q2. Where do you want to go
Round 3 - HR 

(2 Questions)

  • Q1. Where do you from
  • Q2. Are you interested to work

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Not Selected

I applied via Newspaper Ad and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. About Carriageways, Service Roads and patchwork i.e pot Holes, slippage cracks i.e alligator crack, horizontal or vertical crack, Undulating surface,rain cut, Metals beam crash barrier,Gaurd Rail or Mild s...
Round 2 - Technical 

(3 Questions)

  • Q1. Checking level of the layer
  • Q2. Testing the field dry density of the bed like Sub Grade ,GSB,WMM, DBM or BC
  • Q3. Checking the road width

Interview Preparation Tips

Interview preparation tips for other job seekers - Sir I m very hardworker employee .
I m very panchtual for my job duty and going to site daily and prepare daily progress report and also prepare monthly progress report.

I applied via Naukri.com and was interviewed in Oct 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Asked My previous projects details
  • Q2. I'm telling all answers

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical it lasted for about 30 minute's. Most of questions asked to me were related to my previous projects
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - HR 

(3 Questions)

  • Q1. What is penitration test
  • Ans. 

    Penetration test is a method of evaluating the security of a computer system or network by simulating an attack from a malicious source.

    • Penetration test involves identifying vulnerabilities in a system or network.

    • It includes attempting to exploit these vulnerabilities to determine the potential impact of a real attack.

    • The goal of a penetration test is to strengthen the security defenses of the system or network.

    • Common ...

  • Answered by AI
  • Q2. What is water proofing
  • Ans. 

    Waterproofing is a process of making a structure or material resistant to the penetration of water.

    • Waterproofing involves applying materials or coatings to prevent water from seeping through surfaces.

    • It is commonly used in construction to protect buildings from water damage.

    • Examples of waterproofing materials include bituminous coatings, cementitious waterproofing, and liquid membrane systems.

  • Answered by AI
  • Q3. Types of foundation
  • Ans. 

    Types of foundation include shallow, deep, and pile foundations.

    • Shallow foundations are used when the soil is strong enough to support the structure's weight, such as spread footings and mat foundations.

    • Deep foundations are used when the soil is weak and unable to support the structure's weight, such as pile foundations and drilled piers.

    • Pile foundations are deep foundations that consist of long, slender columns driven...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

Interview Questionnaire 

5 Questions

  • Q1. What the thickness of compreg ply and it's size
  • Ans. 

    The thickness of compreg ply varies depending on its intended use and application. Its size can also vary depending on the manufacturer and customer requirements.

    • The thickness of compreg ply can range from 3mm to 25mm or more

    • The size of compreg ply can vary from 4ft x 8ft to 5ft x 10ft or more

    • The thickness and size of compreg ply can be customized based on the specific requirements of the project

    • Compreg ply is commonly...

  • Answered by AI
  • Q2. Maximum reapetation of ply shuttering
  • Ans. 

    The maximum repetition of ply shuttering depends on various factors such as quality of ply, weather conditions, and type of concrete.

    • The maximum repetition of ply shuttering can range from 5 to 20 times depending on the above factors.

    • If the quality of ply is good and weather conditions are favorable, the ply shuttering can be reused more number of times.

    • However, if the concrete mix is harsh or the weather conditions ar...

  • Answered by AI
  • Q3. Consumption of shuttering oil per ltr how much area covered
  • Ans. 

    The consumption of shuttering oil per liter depends on the area covered.

    • The consumption of shuttering oil per liter can vary depending on factors such as the type of shuttering material, surface texture, and weather conditions.

    • On average, 1 liter of shuttering oil can cover approximately 10-15 square meters of surface area.

    • However, this can vary significantly based on the absorbency of the surface and the thickness of ...

  • Answered by AI
  • Q4. How much elongation % of fe550 steel
  • Ans. 

    The elongation % of fe550 steel varies depending on the specific grade and manufacturing process.

    • The elongation % of fe550 steel can range from 14% to 20%.

    • It is important to refer to the specifications provided by the manufacturer for accurate information.

    • The elongation % indicates the ability of the steel to deform before breaking under tension.

    • Fe550 steel is commonly used in construction and reinforcement application

  • Answered by AI
  • Q5. What the mean of rolling margin of the steel
  • Ans. 

    Rolling margin of steel is the difference between the target thickness and the actual thickness after rolling.

    • Rolling margin is a measure of the accuracy of the rolling process.

    • It is calculated by subtracting the actual thickness of the steel after rolling from the target thickness.

    • A positive rolling margin means the steel is thicker than intended, while a negative rolling margin means it is thinner.

    • Rolling margin is i...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and deeply knowledge of each material and it's properties

I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Some basic questions about Ofc work and personal information
  • Q2. Ofc cable blowing how to start
  • Ans. 

    To start OFC cable blowing, follow these steps

    • Ensure that the ducts are clean and free of any obstruction

    • Attach the cable blowing machine to the duct

    • Connect the cable to the machine and start the blowing process

    • Monitor the cable's progress and adjust the machine's speed as needed

    • Once the cable has been blown through the entire length of the duct, detach the machine and cable

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Bondada Engineering Site Engineer interview:
  • Nld
  • Lm
Interview preparation tips for other job seekers - No fear in answering questions be strong
Just one interview it's enough to get job in bepl

R.S Construction Builders & Engineers Interview FAQs

How many rounds are there in R.S Construction Builders & Engineers Site Engineer interview?
R.S Construction Builders & Engineers interview process usually has 1 rounds. The most common rounds in the R.S Construction Builders & Engineers interview process are One-on-one Round.

Tell us how to improve this page.

R.S Construction Builders & Engineers Site Engineer Salary
based on 10 salaries
₹2 L/yr - ₹3.6 L/yr
20% less than the average Site Engineer Salary in India
View more details

R.S Construction Builders & Engineers Site Engineer Reviews and Ratings

based on 3 reviews

3.8/5

Rating in categories

3.8

Skill development

3.3

Work-life balance

3.5

Salary

3.5

Job security

4.0

Company culture

2.9

Promotions

3.8

Work satisfaction

Explore 3 Reviews and Ratings
Civil Site Engineer
22 salaries
unlock blur

₹1.8 L/yr - ₹3.8 L/yr

Site Engineer
10 salaries
unlock blur

₹2 L/yr - ₹3.6 L/yr

Civil Engineer
10 salaries
unlock blur

₹2 L/yr - ₹3.5 L/yr

Mechanical Engineer
6 salaries
unlock blur

₹2.6 L/yr - ₹3 L/yr

Senior Engineer
5 salaries
unlock blur

₹3.6 L/yr - ₹7.5 L/yr

Explore more salaries
Compare R.S Construction Builders & Engineers with

Lea Associates South Asia

4.3
Compare

McNally Bharat Engineering

4.1
Compare

ABCI Infrastructures

3.5
Compare

R.V.R. PROJECTS

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview