The project cycle from foundation to final handover involves several stages as per the contract and billing.
1. Project initiation and planning: This involves defining project objectives, creating a project plan, and identifying resources and timelines.
2. Foundation and construction: The actual construction work begins, including site preparation, foundation laying, and building construction.
3. Procurement and logistics...
Top trending discussions
posted on 17 Dec 2023
I applied via Approached by Company and was interviewed in Jun 2023. There were 4 interview rounds.
posted on 11 Sep 2022
I appeared for an interview in Aug 2022.
Bituminous laying temperature is 130-150°C and rolling temperature is 80-100°C.
Bituminous laying requires higher temperature than rolling.
Temperature range ensures proper compaction and adhesion.
Temperature can vary based on the type of bitumen and aggregate used.
Proper temperature control is crucial for quality bituminous pavement.
Material suitability criteria for aggregate in construction projects.
Aggregate size should be 26.5 mm or less.
Water absorption should not exceed 2%.
Soundness test should show Naso4 not more than 12% and Mgso4 not more than 18%.
Angle of abrasion should be less than 35% with max FI & EI less than 35%.
Equivalent weight of sand should not be less than 50%.
Aggregate should not be alkaline reactive.
MDD & MCC should be as per
The design procedure for DLC mix includes using M15 grade concrete, minimum cement content of 150 kg/cum, and achieving a compressive strength of at least 10 MPA after 7 days of curing.
Use M15 grade concrete with aggregate and cement ratio of 12:1
Minimum cement content of 150 kg/cum, or 120 kg/cum if fly ash content is over 20%
Achieve a compressive strength of at least 10 MPA after 7 days of curing
DLC mix should be hom...
The question is about the suitability of aggregate size and water absorption for PQC with a total thickness of 300mm and tolerance of +/-6mm.
Aggregate size of 31.5mm is suitable for PQC with a total thickness of 300mm and tolerance of +/-6mm.
Water absorption to GSB DLC being the same for PQC is also suitable.
The suitability of the material is important for the successful completion of the project.
The design procedure for cement concrete includes minimum cement content, strength requirements, dowel bar and tie bar specifications, and surface preparation and curing techniques.
Minimum cement content of 360 kg/cum if fly ash is more than 20%, and 310 kg/cum otherwise
Flexural strength of cement concrete after 28-day curing should be 4.5 MPa, and compressive strength should be 40 MPa
Dowel bar size of 32mm dia and 300...
posted on 24 Feb 2024
posted on 24 Mar 2021
posted on 13 Sep 2021
I applied via Recruitment Consultant and was interviewed in Mar 2021. There was 1 interview round.
posted on 14 Sep 2021
posted on 16 Nov 2021
I applied via Campus Placement and was interviewed before Nov 2020. There were 3 interview rounds.
posted on 6 Aug 2021
Write a query
Specify the database and table name
List the columns to be selected
Add any conditions or filters
Specify the order of results
Junior Project Engineer
24
salaries
| ₹2 L/yr - ₹5.2 L/yr |
Project Engineer
11
salaries
| ₹4 L/yr - ₹8.6 L/yr |
Assistant Project Engineer
9
salaries
| ₹4.7 L/yr - ₹8 L/yr |
Safety Officer
7
salaries
| ₹3.5 L/yr - ₹6.4 L/yr |
Project Supervisor
6
salaries
| ₹2.5 L/yr - ₹3.6 L/yr |
Patel Infrastructure
CTS Consulting & Technical Support
J K Fenner
Saudi Binladin Group