Filter interviews by
I applied via Approached by Company and was interviewed in Apr 2024. There was 1 interview round.
Job responsibilities of previous company
posted on 31 Jan 2024
I applied via Company Website and was interviewed in Jul 2023. There was 1 interview round.
LRS stands for Line Reactor System. It is used to protect electrical equipment from voltage spikes and harmonics.
LRS is installed in series with the power supply to limit the flow of current and reduce voltage spikes.
It helps in reducing harmonics and improving power quality.
Maintenance of LRS involves regular inspection for any signs of damage or overheating.
Cleaning the LRS and ensuring proper ventilation is importan...
I applied via Referral and was interviewed in Dec 2021. There was 1 interview round.
Top trending discussions
Quantitative reasoning
posted on 26 Oct 2024
I applied via campus placement at SRM Institute of Science & Technology, Chennai and was interviewed in Sep 2024. There was 1 interview round.
Starters are devices used to start and control the speed of induction motors.
Direct On-Line (DOL) starter: provides full voltage to the motor at start
Star-Delta starter: reduces the starting current by initially connecting the motor in star configuration
Auto-transformer starter: uses an auto-transformer to reduce the voltage during starting
Soft starter: gradually increases the voltage to the motor to reduce starting cu...
Earthing is the process of connecting electrical systems to the ground to prevent electric shock and protect equipment.
Types of earthing include plate earthing, pipe earthing, rod earthing, and strip earthing.
Methods of earthing include neutral earthing, equipment earthing, and system earthing.
Earthing is essential for safety in electrical systems to prevent electric shock and damage to equipment.
Proper earthing ensure...
TF stands for Transformer. It is a static device used to transfer electrical energy between two or more circuits through electromagnetic induction.
Principle of TF involves Faraday's law of electromagnetic induction.
Types of TF include step-up, step-down, isolation, auto-transformer, etc.
TFs are used in power distribution, voltage regulation, impedance matching, etc.
The starting current of a DOL starter is typically 6-8 times the rated current of the motor.
The Direct-On-Line (DOL) starter is used to start induction motors.
The starting current of a DOL starter is usually 6-8 times the rated current of the motor.
This high starting current can cause voltage drops and stress on the electrical system.
Choose AC cables based on current rating, insulation material, and environmental conditions.
Consider the current rating of the cable to ensure it can handle the load
Choose the appropriate insulation material based on the application and environment
Take into account environmental conditions such as temperature, moisture, and exposure to chemicals
Select the right cable size to minimize voltage drop and power loss
Ensure c...
posted on 30 Dec 2024
I applied via Company Website and was interviewed in Nov 2024. There was 1 interview round.
OSHA standards applicable to building construction include fall protection, hazard communication, scaffolding safety, and electrical safety.
Fall protection requirements include guardrails, safety nets, and personal fall arrest systems.
Hazard communication standards require employers to provide information about hazardous chemicals used on site.
Scaffolding safety regulations cover proper construction, use, and maintenan...
AISC codes applicable to steel structures include AISC 360 for design of structural steel buildings and AISC 341 for seismic design.
AISC 360 - Specification for Structural Steel Buildings
AISC 341 - Seismic Provisions for Structural Steel Buildings
posted on 22 Dec 2024
The output voltage of an AAAC Rabbit conductor is typically around 600 volts.
The output voltage of an AAAC Rabbit conductor is usually around 600 volts.
The exact output voltage may vary depending on the specific application and conditions.
It is important to consult the manufacturer's specifications for accurate information.
My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.
Set clear goals and objectives for the project
Create a detailed timeline with milestones and deadlines
Assign tasks to team members based on their strengths and expertise
Regularly monitor progress and make adjustments as needed
Communicate effectively with team members and stakeholders
Ut...
I applied via LinkedIn and was interviewed in Dec 2024. There was 1 interview round.
posted on 12 Oct 2024
I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.
posted on 19 Sep 2024
There are mainly four grades of bitumen commonly used in construction: VG-10, VG-20, VG-30, and VG-40.
VG-10: Suitable for low-traffic roads
VG-20: Suitable for medium-traffic roads
VG-30: Suitable for high-traffic roads
VG-40: Suitable for heavy-duty traffic areas like airports and container terminals
The compressive strength of cement mortar cube at 3 days is typically around 20-25 MPa.
Compressive strength of cement mortar cube is an important parameter to assess its quality and durability
The strength of cement mortar increases with age, so 3 days is an early testing point
Typical compressive strength values for cement mortar cubes at 3 days range from 20-25 MPa
based on 53 reviews
Rating in categories
Senior Sales Executive
10
salaries
| ₹3.5 L/yr - ₹4.5 L/yr |
Area Sales Manager
10
salaries
| ₹3.2 L/yr - ₹6.4 L/yr |
Assistant Engineer
9
salaries
| ₹2.2 L/yr - ₹3.2 L/yr |
Sales Executive
7
salaries
| ₹3.2 L/yr - ₹3.7 L/yr |
Assistant Manager
7
salaries
| ₹5.5 L/yr - ₹6.7 L/yr |
UltraTech Cement
Ambuja Cements
ACC
Shree Cement