Upload Button Icon Add office photos

Psp Projects

Compare button icon Compare button icon Compare

Filter interviews by

Psp Projects Welder Interview Questions and Answers for Freshers

Updated 10 Sep 2024

Psp Projects Welder Interview Experiences for Freshers

1 interview found

Welder Interview Questions & Answers

user image Anonymous

posted on 10 Sep 2024

Interview experience
1
Bad
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. Good hr but superviser bad
  • Q2. Good hr but superviser bad ji

Interview Preparation Tips

Interview preparation tips for other job seekers - It would be better if no one comes here because here welders are harassed a lot and here the full craftsman also gets the same salary and the helper also gets the same salary and on Sunday the salary is deducted; the salary that the contractor pays to the welder is Rs. 650 for 12 hours and the idiot supervisor named Suresh uses very foul language, this idiot is such that if any person runs away from here then it is because of this, so if anyone comes then they should not work with Suresh.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I appeared for an interview in Sep 2024.

Round 1 - Aptitude Test 

Amazing aptitute test with knowledge of all aspects of the industry

Round 2 - Assignment 

Great assessment of all the interview natures of the assignment for risk, protocol, and valuation.

Interview Preparation Tips

Interview preparation tips for other job seekers - study the technicals and know the industry cold
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Achievements, Experience, Projects Handled
  • Q2. Project work executed in last few years
  • Ans. 

    I have executed multiple projects in the last few years.

    • Developed a new website for a client using HTML, CSS, and JavaScript.

    • Created a mobile application for a startup using React Native.

    • Managed a team of developers to build a custom CRM system for a large corporation.

    • Implemented a data analytics solution for a healthcare organization using Python and SQL.

    • Designed and executed a social media marketing campaign for a no

  • Answered by AI
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview before Apr 2024, where I was asked the following questions.

  • Q1. Questions related to bitumen testing.
  • Q2. Questions related to material testing

Interview Questionnaire 

2 Questions

  • Q1. Engineering drwaiing
  • Q2. HR questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

Interview Questionnaire 

6 Questions

  • Q1. Percentage of steel in pile
  • Ans. 

    The percentage of steel in a pile varies depending on the type and design of the pile.

    • The percentage of steel in a pile can range from 0% to over 90%.

    • The type of pile (e.g. steel, concrete, timber) and its design (e.g. diameter, length, wall thickness) determine the percentage of steel.

    • Steel piles typically have a higher percentage of steel than other types of piles.

    • The percentage of steel in a pile can also affect its

  • Answered by AI
  • Q2. Pile built-up above cut off level as per IS code
  • Ans. 

    Pile built-up above cut off level as per IS code

    • IS code specifies the maximum allowable pile length above cut off level

    • Pile length above cut off level should not exceed 3 times the pile diameter

    • Built-up pile above cut off level can cause structural instability and failure

  • Answered by AI
  • Q3. Pile vertical tolerance as per IS code
  • Ans. 

    Vertical tolerance for piles as per IS code

    • As per IS 2911-1:2010, the vertical tolerance for piles is +/- 25mm

    • This tolerance is applicable for both driven and cast-in-situ piles

    • The tolerance is measured at the top of the pile and at intervals of 3m along the length

    • If the deviation exceeds the tolerance limit, the pile may need to be rejected or remedial measures taken

  • Answered by AI
  • Q4. Pile concrete consumption +- tolerance
  • Ans. 

    Pile concrete consumption tolerance depends on various factors.

    • Pile diameter and length

    • Concrete mix design

    • Placement method

    • Quality control measures

    • Environmental conditions

    • Tolerance typically ranges from 5-10% of estimated consumption

    • Regular monitoring and adjustment of concrete consumption is necessary

  • Answered by AI
  • Q5. Unit weight of steel
  • Ans. 

    Unit weight of steel is 7850 kg/m³

    • The unit weight of steel is the weight of a specific volume of steel

    • It is measured in kilograms per cubic meter (kg/m³)

    • The unit weight of steel is 7850 kg/m³

    • This value may vary slightly depending on the composition and manufacturing process of the steel

  • Answered by AI
  • Q6. Contractor MB related

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical

Interview Questionnaire 

2 Questions

  • Q1. About my company work
  • Q2. About me

Interview Preparation Tips

Round: Resume Shortlist
Experience: technical education
Tips: skill knowdlege

Round: Test
Experience: digital electronics, microprosser, mathmatics,
Tips: objective questions
Duration: 30 minutes
Total Questions: 15

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions

I applied via Recruitment Consulltant and was interviewed before Mar 2021. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Mostly questions were based on resume. They ask you about your day to day task and how you'd apply those skills to the current role.
Round 2 - Technical 

(1 Question)

  • Q1. 2nd interview was with the divisional head who basically asked what was previously asked in round 1

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company for Mumbai locals, especially if you stay in the vicinity of Kanjurmarg. Usually involves staying overtime as everyone works under pressure owing to very limited resources and too much beurucracy.

Psp Projects Interview FAQs

How many rounds are there in Psp Projects Welder interview for freshers?
Psp Projects interview process for freshers usually has 1 rounds. The most common rounds in the Psp Projects interview process for freshers are HR.
What are the top questions asked in Psp Projects Welder interview for freshers?

Some of the top questions asked at the Psp Projects Welder interview for freshers -

  1. Good hr but superviser bad...read more
  2. Good hr but superviser ...read more

Tell us how to improve this page.

Psp Projects Welder Interview Process for Freshers

based on 1 interview

Interview experience

1
  
Bad
View more

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 119 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
Bechtel Interview Questions
4.0
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 61 Interviews
Wood Group Interview Questions
3.8
 • 61 Interviews
View all
Senior Engineer
159 salaries
unlock blur

₹2.7 L/yr - ₹10 L/yr

Assistant Engineer
152 salaries
unlock blur

₹3 L/yr - ₹6 L/yr

Junior Engineer
82 salaries
unlock blur

₹1 L/yr - ₹4.5 L/yr

Senior Civil Engineer
51 salaries
unlock blur

₹4 L/yr - ₹8.5 L/yr

Assistant Engineer - Civil
50 salaries
unlock blur

₹2.6 L/yr - ₹5.4 L/yr

Explore more salaries
Compare Psp Projects with

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.8
Compare

Apco Infratech

3.7
Compare

Saipem

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview