I applied via Company Website and was interviewed in Dec 2023. There was 1 interview round.
Handpick your favourite subject and most likely interviewers are going to ask question from it
Read and understand company profile from its website for interview preparation
Rankine cycle is a thermodynamic cycle used in power plants to convert heat into mechanical work.
Rankine cycle is a theoretical cycle that represents the operation of a steam power plant.
It consists of four processes: heating, expansion, condensation, and compression.
In the heating process, water is heated to high pressure and temperature using a boiler.
The high-pressure steam then expands through a turbine, converting...
I applied via Campus Placement and was interviewed before Jan 2021. There were 3 interview rounds.
MOI of I beam and UDL on beam BM
MOI of I beam depends on its dimensions and cross-sectional shape
UDL on beam BM creates a bending moment that varies linearly along the length of the beam
The maximum bending moment occurs at the center of the beam
Top trending discussions
I applied via Approached by Company and was interviewed in Nov 2024. There were 2 interview rounds.
posted on 20 Jan 2025
I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed before Dec 2020. There were 4 interview rounds.
Pipeline engineering involves designing, constructing, and maintaining pipelines for various industries such as oil and gas, water, and transportation.
Designing pipelines to transport fluids or gases efficiently
Constructing pipelines using materials like steel, plastic, or composite materials
Maintaining pipelines to prevent leaks and ensure safety
Types of pipelines include transmission pipelines, distribution pipelines
I applied via Recruitment Consulltant and was interviewed in Jul 2024. There were 2 interview rounds.
I applied via AmbitionBox and was interviewed in Sep 2024. There were 2 interview rounds.
Overviews pumps and trableshooting
posted on 2 Oct 2024
I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.
Costing for laying pipelines involves calculating material costs, labor costs, equipment costs, and overhead expenses.
Calculate the length of the pipeline needed
Determine the type and size of pipes required
Estimate the cost of materials including pipes, fittings, and valves
Factor in labor costs for installation
Consider equipment costs such as machinery and tools
Include overhead expenses like permits, insurance, and pro...
I applied via Recruitment Consulltant and was interviewed in Aug 2024. There was 1 interview round.
Interview experience
based on 105 reviews
Rating in categories
Deputy Chief Engineer
22
salaries
| ₹12 L/yr - ₹20 L/yr |
Mechanical Construction Engineer
16
salaries
| ₹6 L/yr - ₹8.5 L/yr |
Senior Engineer
16
salaries
| ₹6 L/yr - ₹10 L/yr |
Engineer Grade II
15
salaries
| ₹4 L/yr - ₹8.6 L/yr |
Civil Engineer
15
salaries
| ₹4.8 L/yr - ₹8.8 L/yr |
Engineering Projects
Mecon
BHEL
Larsen & Toubro Limited