The manufacturing process of the printing line involves various steps to produce printed materials efficiently.
Designing the layout of the printing line
Selecting the appropriate printing technology (e.g. offset, digital, flexography)
Calibrating and setting up the printing equipment
Testing the printing quality and making adjustments as needed
Implementing quality control measures throughout the process
Top trending discussions
I applied via Referral and was interviewed in Mar 2024. There was 1 interview round.
The parts of an inverter include DC input, power transistors, transformer, output filter, and control circuit.
DC input: where the direct current is supplied to the inverter
Power transistors: responsible for converting DC to AC
Transformer: used to step up or step down the voltage
Output filter: smoothens the output waveform
Control circuit: manages the operation of the inverter
The formula for radiation of the day is based on the Stefan-Boltzmann law, which states that the total energy radiated per unit surface area of a black body is directly proportional to the fourth power of the body's absolute temperature.
Radiation of the day is calculated using the Stefan-Boltzmann law: P = σAT^4
P represents the power radiated per unit area, σ is the Stefan-Boltzmann constant, A is the surface area, and...
Challenges faced in previous plant and how they were overcome
One challenge was outdated equipment causing frequent breakdowns
Implemented a preventive maintenance schedule to address the issue
Another challenge was lack of skilled manpower
Conducted training programs and hired experienced technicians
Difficulty in meeting production targets due to inefficiencies
Implemented lean manufacturing principles to streamline proces
I applied via Approached by Company and was interviewed before Nov 2019. There were 4 interview rounds.
posted on 24 Dec 2024
I am a dedicated Mechanical Engineer with a strong background in designing and implementing mechanical systems.
Graduated with a degree in Mechanical Engineering from XYZ University
Experienced in CAD software such as AutoCAD and SolidWorks
Worked on projects involving HVAC systems and industrial machinery
Skilled in analyzing and solving complex engineering problems
Strong communication and teamwork skills
I have 5 years of experience in Boiler Turbine, ESP, and BAG FILTER EPCI projects.
5 years of experience in Boiler Turbine projects
Familiar with ESP (Electrostatic Precipitator) systems
Proficient in BAG FILTER EPCI (Engineering, Procurement, Construction, and Installation)
Managed various projects involving Boiler Turbine, ESP, and BAG FILTER systems
Implemented cost-effective solutions for improving efficiency
The erection process of a boiler involves assembling and installing all the components to create a functional boiler system.
Prepare the foundation for the boiler
Assemble the boiler components such as tubes, drums, and headers
Install the boiler on the foundation
Connect the necessary piping and valves
Test the boiler for proper functioning
Boiler pressure parts are typically made of carbon steel, alloy steel, or stainless steel to withstand high pressure and temperature.
Carbon steel is commonly used for lower pressure boilers
Alloy steel is used for higher pressure boilers
Stainless steel is used for corrosion resistance in boilers
Materials must meet specific standards like ASTM A516 for carbon steel
The welding process used in water wall panels is typically TIG welding.
TIG welding is commonly used for water wall panels due to its precision and clean welds
TIG welding helps prevent contamination in the weld area, which is crucial for water wall panels
Other welding processes like MIG welding or submerged arc welding may also be used depending on the specific requirements
posted on 25 Oct 2024
I applied via Approached by Company and was interviewed in Mar 2024. There was 1 interview round.
I applied via Campus Placement and was interviewed in May 2024. There was 1 interview round.
posted on 11 Jun 2024
posted on 4 May 2023
I applied via Naukri.com and was interviewed in Apr 2023. There were 2 interview rounds.
I applied via Job Portal
Domain is a group of computers and devices on a network that are administered as a unit with common rules and procedures.
A domain is a logical grouping of network resources, such as computers, printers, and servers, that share a common security database.
Domain ID is a unique identifier assigned to a user or group in a domain.
Domain ID is used to grant or deny access to resources within the domain.
Domain ID can also be ...
based on 12 reviews
Rating in categories
Junior Engineer
78
salaries
| ₹2.4 L/yr - ₹4.2 L/yr |
Senior Engineer
75
salaries
| ₹3.1 L/yr - ₹7.9 L/yr |
Assistant Manager
73
salaries
| ₹4.3 L/yr - ₹12.6 L/yr |
Production Engineer
51
salaries
| ₹2.4 L/yr - ₹4.1 L/yr |
Engineer
45
salaries
| ₹1.8 L/yr - ₹4.5 L/yr |
Adani Green Energy
Vikram Solar
Waaree Energies
Azure Power