I applied via Indeed
Developing a 33kV sub-station involves detailed planning, design, procurement, construction, and commissioning.
Conduct a feasibility study to determine the location and size of the sub-station.
Design the sub-station layout, including equipment placement, cable routing, and safety measures.
Procure necessary equipment such as transformers, switchgear, and protection systems.
Construct the sub-station following all safety ...
Designing a fire pump room involves considering factors like location, size, ventilation, and fire protection systems.
Identify the location of the fire pump room based on accessibility and proximity to water source
Ensure the room is adequately sized to accommodate the fire pump equipment and allow for maintenance
Provide proper ventilation to prevent overheating of equipment
Include fire protection systems such as sprink...
Top trending discussions
posted on 22 Jul 2024
The weight of 12 mm ply as per IS code varies depending on the type of wood used.
The weight of 12 mm ply can range from 22 to 30 kg per sheet.
The weight can also vary based on the density of the wood used.
IS code may specify a range of acceptable weights for 12 mm ply.
The weight of steel varies depending on the type and dimensions of the steel.
The weight of steel is typically measured in pounds or kilograms.
The weight of steel can range from 7.85 g/cm³ for mild steel to 8.05 g/cm³ for high-strength steel.
The weight of a specific piece of steel can be calculated by multiplying its volume by its density.
posted on 14 Mar 2024
I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.
Discuss about experience
I applied via Approached by Company and was interviewed in Aug 2023. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Dec 2022. There were 3 interview rounds.
About high rise buildings and construction
I applied via Naukri.com and was interviewed in Oct 2022. There were 2 interview rounds.
posted on 25 Mar 2023
I applied via Naukri.com and was interviewed before Mar 2022. There were 2 interview rounds.
The area of projects and types of projects I have worked on vary greatly.
I have worked on projects in various industries including construction, healthcare, and technology.
Types of projects I have worked on include software development, building construction, and medical equipment installation.
I am adaptable and able to quickly learn about new industries and project types.
I have experience working on both small and lar
posted on 3 Jun 2021
I applied via Naukri.com and was interviewed in Dec 2020. There were 4 interview rounds.
posted on 20 Dec 2024
FDD field dry density test is a method to determine the density of soil in the field.
FDD stands for Field Dry Density.
It is a test conducted on soil to measure its density.
The test involves extracting a soil sample from the field and determining its dry weight and volume.
The dry density is calculated by dividing the dry weight of the soil sample by its volume.
This test helps in assessing the compaction and quality of s
The slump in column concreting should be between 150-175 mm.
The slump should be measured before pouring the concrete.
The slump should be consistent throughout the column.
The slump should not exceed 175 mm to avoid segregation.
The slump should not be less than 150 mm to ensure proper compaction.
The slump can be adjusted by adding water or admixtures.
The slump test should be performed according to ASTM standards.
Slump in column concreting 90 to 100 mm
Slump refers to the consistency of the concrete mix
A slump of 90 to 100 mm indicates a very wet and unstable mix
This can lead to issues with the structural integrity of the column
Possible causes include incorrect water-cement ratio or improper mixing
Solutions may include adjusting the mix proportions or using additives to improve stability
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Manager
25
salaries
| ₹3 L/yr - ₹5 L/yr |
Assistant Project Engineer
12
salaries
| ₹2 L/yr - ₹4.8 L/yr |
Sales Manager
12
salaries
| ₹4.2 L/yr - ₹7.8 L/yr |
Senior Executive
11
salaries
| ₹2.2 L/yr - ₹5 L/yr |
Front Office Executive
8
salaries
| ₹2.5 L/yr - ₹3 L/yr |
DLF
Godrej Properties
Sobha
Prestige Group