Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Apr 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

Yess I have intrested for the job

Round 2 - One-on-one 

(2 Questions)

  • Q1. All areas survey HT line lt line identify access road water identify
  • Q2. P1 point locationnearby 50/100MTRtower locationpoint identify

Interview Preparation Tips

Interview preparation tips for other job seekers - I have intrested for the job

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (64)
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Mar 2024.

Round 1 - One-on-one 

(1 Question)

  • Q1. I have intrested for the job
Round 2 - One-on-one 

(1 Question)

  • Q1. Yess sure I am interested for the job
Round 3 - One-on-one 

(1 Question)

  • Q1. Yes I have intrested

Civil Site Engineer & Site Incharge Interview Questions asked at other Companies

Q1. steel lenght which will be not considered as wastage?
View answer (1)
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

All site staff as per requirement to be material schedule approval pm & Making indent

Interview Preparation Tips

Interview preparation tips for other job seekers - All civil construction Materials to be 18 years years, & Purchase module ERP, Sap, Build Smart system, monthly physical stock receipt & consumption qty & Balance qty Reconciliation statment submitted by planning &. Billing Engineer to for stores monthly stock closure Report Target date to be submitted.

Store Officer Interview Questions asked at other Companies

Q1. Maintaining stock Upload, Issue, Receipt of material in The System Define maximum & minimum stock level for all type materials. Generate nonmoving item list & highlight to concern H.O.D. Monitoring of all incoming material. Maintain... read more
View answer (1)

I applied via Company Website and was interviewed before Aug 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. About structure drawing

Interview Preparation Tips

Interview preparation tips for other job seekers - With open interview not by noukri.com

Civil Engineer Interview Questions asked at other Companies

Q1. What is the curing formalities for our precast segment???
View answer (20)

Pragati Construction Company interview questions for popular designations

 Civil Engineer

 (1)

 Civil Site Engineer

 (1)

 Civil Site Engineer & Site Incharge

 (1)

 Store Officer

 (1)

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected
Round 1 - Aptitude Test 

Quantitative reasoning

Round 2 - One-on-one 

(5 Questions)

  • Q1. About yourself and past experiences.
  • Q2. Managerial round
  • Q3. About company information
  • Q4. About yourself and extracurricular activities
  • Q5. See yourself in the next 5 yrs

Interview Preparation Tips

Interview preparation tips for other job seekers - be prepared for questions.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Not Selected
Round 1 - Technical 

(2 Questions)

  • Q1. What is the output voltage of an AAAC Rabbit conductor?
  • Ans. 

    The output voltage of an AAAC Rabbit conductor is typically around 600 volts.

    • The output voltage of an AAAC Rabbit conductor is usually around 600 volts.

    • The exact output voltage may vary depending on the specific application and conditions.

    • It is important to consult the manufacturer's specifications for accurate information.

  • Answered by AI
  • Q2. What is your execution work plan?
  • Ans. 

    My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.

    • Set clear goals and objectives for the project

    • Create a detailed timeline with milestones and deadlines

    • Assign tasks to team members based on their strengths and expertise

    • Regularly monitor progress and make adjustments as needed

    • Communicate effectively with team members and stakeholders

    • Ut...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Normal interview the materials and workmanship
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. What is job safety analysis
  • Ans. 

    Job safety analysis is a process of identifying potential hazards in a job task and implementing controls to mitigate risks.

    • Involves breaking down a job task into steps

    • Identifying potential hazards for each step

    • Determining preventive measures to reduce risks

    • Ensures workers are aware of safety procedures

    • Examples: construction site JSA, manufacturing plant JSA

  • Answered by AI
  • Q2. What is hazard identification and risk assessment
  • Ans. 

    Hazard identification is the process of identifying potential sources of harm in the workplace, while risk assessment involves evaluating the likelihood and severity of those hazards.

    • Hazard identification involves identifying potential sources of harm such as chemicals, machinery, or ergonomic factors.

    • Risk assessment involves evaluating the likelihood and severity of harm from these hazards.

    • The goal is to implement con...

  • Answered by AI
  • Q3. What is fire safety
  • Ans. 

    Fire safety refers to measures taken to prevent and protect against the risks of fire.

    • Fire safety includes having working smoke detectors in place.

    • It also involves creating and practicing a fire escape plan.

    • Proper storage and handling of flammable materials is crucial for fire safety.

    • Regular maintenance of fire extinguishers and other fire safety equipment is important.

    • Training employees on fire safety protocols is ess

  • Answered by AI
  • Q4. Accident investigation
  • Q5. What is hazard site
  • Ans. 

    A hazard site is a location where there is a potential risk of harm to people, property, or the environment.

    • Hazard sites can include industrial facilities, chemical plants, nuclear power plants, and construction sites.

    • These sites may contain hazardous materials, dangerous equipment, or unsafe conditions.

    • Proper safety measures and protocols must be followed at hazard sites to prevent accidents and injuries.

    • Examples of h...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Whats is stop work application
  • Ans. 

    Stop work application is a procedure used to halt work activities due to safety concerns or violations.

    • Stop work applications are typically used when there is an imminent danger to workers or the environment.

    • Workers are trained to recognize when a stop work application is necessary and how to properly implement it.

    • Examples of reasons for a stop work application include unsafe working conditions, equipment malfunctions,

  • Answered by AI
  • Q2. What is scaffolding
  • Ans. 

    Scaffolding is a temporary structure used to support workers and materials during construction or maintenance work.

    • Scaffolding provides a safe working platform at height

    • It is typically made of metal or wood

    • Different types include tube and coupler, frame, and system scaffolding

    • Scaffolding must be inspected regularly for safety

  • Answered by AI
  • Q3. Types of scaffolding
  • Ans. 

    Types of scaffolding include supported scaffolding, suspended scaffolding, and aerial lifts.

    • Supported scaffolding is the most common type and is supported by the ground or a building structure.

    • Suspended scaffolding hangs from the roof or top of a building and is commonly used for window washing or painting.

    • Aerial lifts are platforms lifted by cranes or other equipment and are commonly used for tasks at height.

    • Other typ...

  • Answered by AI
  • Q4. Types of accident/incident
  • Ans. 

    Types of accidents/incidents include slips, trips, falls, machinery accidents, chemical exposures, and fires.

    • Slips, trips, and falls are common in workplaces due to wet floors, cluttered walkways, or uneven surfaces.

    • Machinery accidents can occur when proper safety procedures are not followed or equipment malfunctions.

    • Chemical exposures may result from spills, leaks, or improper handling of hazardous substances.

    • Fires ca...

  • Answered by AI
  • Q5. 0% accident incident work

Interview Preparation Tips

Interview preparation tips for other job seekers - Please prepare the conduction all work in safety
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed in Jan 2025.

Round 1 - HR 

(1 Question)

  • Q1. Introduction and Salary discussion
Round 2 - Technical 

(1 Question)

  • Q1. Technical skills, relevant code and standard practice

Interview Preparation Tips

Interview preparation tips for other job seekers - If you have don't job then only go for this company. Job security is zero.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
No response

I applied via LinkedIn and was interviewed in Dec 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Accounting journal entries

Pragati Construction Company Interview FAQs

How many rounds are there in Pragati Construction Company interview?
Pragati Construction Company interview process usually has 2 rounds. The most common rounds in the Pragati Construction Company interview process are One-on-one Round, Aptitude Test and Group Discussion.
How to prepare for Pragati Construction Company interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Pragati Construction Company. The most common topics and skills that interviewers at Pragati Construction Company expect are ERP Systems, MS Office, Site Planning, Civil Engineering and Project Management.
What are the top questions asked in Pragati Construction Company interview?

Some of the top questions asked at the Pragati Construction Company interview -

  1. All areas survey HT line lt line identify access road water ident...read more
  2. P1 point locationnearby 50/100MTRtower locationpoint ident...read more
  3. I have intrested for the ...read more

Tell us how to improve this page.

Pragati Construction Company Interview Process

based on 4 interviews

Interview experience

4.8
  
Excellent
View more

Pragati Construction Company Reviews and Ratings

based on 33 reviews

3.5/5

Rating in categories

3.0

Skill development

3.4

Work-life balance

3.0

Salary

3.0

Job security

2.8

Company culture

3.1

Promotions

3.4

Work satisfaction

Explore 33 Reviews and Ratings
Site Engineer
10 salaries
unlock blur

₹2 L/yr - ₹4.2 L/yr

Civil Site Engineer
9 salaries
unlock blur

₹3 L/yr - ₹4.9 L/yr

Project Manager
7 salaries
unlock blur

₹3 L/yr - ₹6 L/yr

Civil Engineer
7 salaries
unlock blur

₹3.2 L/yr - ₹9.2 L/yr

Senior Engineer
6 salaries
unlock blur

₹3.6 L/yr - ₹6 L/yr

Explore more salaries
Compare Pragati Construction Company with

Lea Associates South Asia

4.3
Compare

McNally Bharat Engineering

4.1
Compare

ABCI Infrastructures

3.5
Compare

R.V.R. PROJECTS

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview