Upload Button Icon Add office photos

Filter interviews by

Pragati Construction Company Interview Questions and Answers

Updated 1 Jul 2024

Pragati Construction Company Interview Experiences

Popular Designations

4 interviews found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Mar 2024.

Round 1 - One-on-one 

(1 Question)

  • Q1. I have intrested for the job
Round 2 - One-on-one 

(1 Question)

  • Q1. Yess sure I am interested for the job
Round 3 - One-on-one 

(1 Question)

  • Q1. Yes I have intrested

Civil Site Engineer & Site Incharge Interview Questions asked at other Companies

Q1. steel lenght which will be not considered as wastage?
View answer (1)
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Apr 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

Yess I have intrested for the job

Round 2 - One-on-one 

(2 Questions)

  • Q1. All areas survey HT line lt line identify access road water identify
  • Q2. P1 point locationnearby 50/100MTRtower locationpoint identify

Interview Preparation Tips

Interview preparation tips for other job seekers - I have intrested for the job

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (66)
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

All site staff as per requirement to be material schedule approval pm & Making indent

Interview Preparation Tips

Interview preparation tips for other job seekers - All civil construction Materials to be 18 years years, & Purchase module ERP, Sap, Build Smart system, monthly physical stock receipt & consumption qty & Balance qty Reconciliation statment submitted by planning &. Billing Engineer to for stores monthly stock closure Report Target date to be submitted.

Store Officer Interview Questions asked at other Companies

Q1. Which Advance excel used for inventory..?
View answer (5)

I applied via Company Website and was interviewed before Aug 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. About structure drawing

Interview Preparation Tips

Interview preparation tips for other job seekers - With open interview not by noukri.com

Civil Engineer Interview Questions asked at other Companies

Q1. What is the curing formalities for our precast segment???
View answer (22)

Pragati Construction Company interview questions for popular designations

 Civil Site Engineer & Site Incharge

 (1)

 Civil Engineer

 (1)

 Civil Site Engineer

 (1)

 Store Officer

 (1)

Jobs at Pragati Construction Company

View all

Interview questions from similar companies

I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. As attendance for “Mid Management level designation “ Just asks about my Experience. Not much Technical points highlighted except few Manager level Questions (general points not much technically projected)...

Interview Preparation Tips

Topics to prepare for VIKRAN Engineering & Exim Assistant Manager interview:
  • Nothing required.
Interview preparation tips for other job seekers - Just expecting less salary and having Good experience in the relevant field you can have JOB CONFIRMED easily.

Interview Questionnaire 

2 Questions

  • Q1. All the questions are related to the specific role they are opting for
  • Q2. All depends on client

Interview Preparation Tips

Interview preparation tips for other job seekers - Just keep the CTC in mind as they are more the salary conscious

Interview Questionnaire 

1 Question

  • Q1. Case study regarding water base plant

Interview Preparation Tips

Interview preparation tips for other job seekers - Go thoroughly in the case study part. They will check how your brain work
Round 1 - One-on-one 

(2 Questions)

  • Q1. What is your name and designation
  • Q2. Where are you from and
Round 2 - One-on-one 

(1 Question)

  • Q1. Who is the ceo of abc

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and rock the interview with good communication skills.do not stumble on ypur answers
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before May 2022. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Technical about railway experience in OHE
  • Q2. Commerical experience related to client billing
  • Ans. 

    I have extensive commercial experience related to client billing.

    • Managed client billing for a software company, ensuring timely and accurate invoicing

    • Developed and implemented billing processes for a consulting firm, resulting in a 20% increase in revenue

    • Collaborated with sales team to resolve billing discrepancies and improve client satisfaction

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Small organisation but growing in a steady path
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Approached by Company and was interviewed in Sep 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Salary expectation
  • Q2. My previous roles

Interview Preparation Tips

Topics to prepare for ABCI Infrastructures Analyst interview:
  • Analytics
Interview preparation tips for other job seekers - Read reviews of the company and then only join

Pragati Construction Company Interview FAQs

How many rounds are there in Pragati Construction Company interview?
Pragati Construction Company interview process usually has 2 rounds. The most common rounds in the Pragati Construction Company interview process are One-on-one Round, Group Discussion and Aptitude Test.
How to prepare for Pragati Construction Company interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Pragati Construction Company. The most common topics and skills that interviewers at Pragati Construction Company expect are ERP Systems, MS Office, Site Planning, Civil Engineering and Project Management.
What are the top questions asked in Pragati Construction Company interview?

Some of the top questions asked at the Pragati Construction Company interview -

  1. All areas survey HT line lt line identify access road water ident...read more
  2. P1 point locationnearby 50/100MTRtower locationpoint ident...read more
  3. I have intrested for the ...read more

Tell us how to improve this page.

Pragati Construction Company Interview Process

based on 4 interviews

Interview experience

4.8
  
Excellent
View more

Pragati Construction Company Reviews and Ratings

based on 35 reviews

3.4/5

Rating in categories

3.1

Skill development

3.4

Work-life balance

3.1

Salary

3.0

Job security

2.9

Company culture

3.2

Promotions

3.4

Work satisfaction

Explore 35 Reviews and Ratings
Tender Officer ( Roads, Highways & Bridges)

Navi Mumbai,

Mumbai

2-3 Yrs

Not Disclosed

Purchase Assistant/ Executive

Pune

2-4 Yrs

₹ 2-3 LPA

Safety Engineer

Pune

3-6 Yrs

₹ 3.5-5.5 LPA

Explore more jobs
Site Engineer
10 salaries
unlock blur

₹2 L/yr - ₹4.2 L/yr

Civil Site Engineer
9 salaries
unlock blur

₹3 L/yr - ₹4.9 L/yr

Project Manager
7 salaries
unlock blur

₹3 L/yr - ₹6 L/yr

Accountant
7 salaries
unlock blur

₹2.6 L/yr - ₹4.2 L/yr

Civil Engineer
7 salaries
unlock blur

₹3.2 L/yr - ₹9.2 L/yr

Explore more salaries
Compare Pragati Construction Company with

Lea Associates South Asia

4.3
Compare

McNally Bharat Engineering

4.0
Compare

R.V.R. PROJECTS

4.0
Compare

ABCI Infrastructures

3.4
Compare
Did you find this page helpful?
Yes No
write
Share an Interview