Filter interviews by
I applied via LinkedIn and was interviewed in Sep 2023. There were 3 interview rounds.
Top trending discussions
I applied via LinkedIn and was interviewed in Apr 2024. There were 3 interview rounds.
Improving OEE involves optimizing equipment, reducing downtime, and improving quality.
Implement preventive maintenance schedules to reduce breakdowns
Train operators on proper equipment usage and maintenance
Utilize real-time monitoring systems to identify and address issues quickly
Optimize production schedules to minimize changeovers and downtime
Implement quality control measures to reduce defects and rework
Seeking new challenges and growth opportunities in a dynamic work environment.
Looking for new challenges to expand my skills and knowledge
Seeking opportunities for career advancement and growth
Interested in working in a more dynamic and innovative work environment
Yes, I am willing to relocate for the right opportunity.
I am open to relocating for a position that aligns with my career goals and offers growth opportunities.
I have relocated in the past for career advancement and have found it to be a positive experience.
I understand the importance of being flexible and adaptable in the workplace, including being open to relocation.
I am excited about the possibility of exploring new
I applied via Company Website and was interviewed in Mar 2024. There were 2 interview rounds.
The flow of complete PCB design involves schematic design, component placement, routing, design verification, and manufacturing.
Schematic design: Create a schematic diagram of the circuit layout.
Component placement: Position components on the PCB layout.
Routing: Connect the components using traces on the PCB.
Design verification: Check for errors and ensure functionality.
Manufacturing: Prepare the design for production.
PCB assembly in speedometer involves soldering electronic components onto a printed circuit board to ensure accurate readings.
Ensure proper placement of components on the PCB
Use soldering techniques to securely attach components
Test the functionality of the speedometer after assembly
Follow manufacturer's guidelines for assembly process
PCB work in speedometer involves designing and implementing the circuitry for accurate speed measurement and display in a full function tester.
Designing PCB layout for speedometer circuitry
Implementing accurate speed measurement sensors
Integrating display functionality in full function tester
Testing and calibrating speedometer functionality
Pcb knowledge in smt and psmt department
posted on 7 Dec 2024
I applied via Naukri.com and was interviewed before Dec 2023. There was 1 interview round.
posted on 31 May 2024
I was interviewed in May 2024.
The number of Engineering Documents processed in an EPC project varies depending on the size and complexity of the project.
The number of Engineering Documents processed in an EPC project can range from hundreds to thousands.
These documents include drawings, specifications, calculations, reports, and other technical documents.
The exact number of documents will depend on the scope of the project, the number of discipline...
posted on 9 Sep 2024
Normal aptitude test of 30 questions in 30 minutes online
I applied via Recruitment Consulltant and was interviewed before Dec 2023. There was 1 interview round.
The grinding process involves using a rotating abrasive wheel to remove material from a workpiece.
Grinding is a machining process that uses an abrasive wheel to remove material from a workpiece.
The workpiece is held in place while the grinding wheel rotates at high speed, making contact with the material and removing small chips.
Different types of grinding processes include surface grinding, cylindrical grinding, and c...
Establish open communication, respect union rules, negotiate fairly, address concerns promptly
Establish open communication channels with union representatives
Respect union rules and regulations to maintain a positive relationship
Negotiate fairly and transparently during contract discussions
Address any concerns or grievances from unionised manpower promptly and effectively
posted on 13 Apr 2023
I applied via Naukri.com and was interviewed in Oct 2022. There were 3 interview rounds.
IATF certification ensures that an organization's quality management system meets international standards for automotive industry.
IATF certification is required for any organization that wants to supply products or services to the automotive industry.
It ensures that the organization's quality management system meets international standards for the automotive industry.
It helps to improve the organization's processes and...
Kaizen is continuous improvement while Poka Yoke is mistake-proofing.
Kaizen focuses on making small, incremental improvements to processes and systems over time.
Poka Yoke aims to prevent mistakes from happening by designing processes and systems in a way that makes errors impossible or easily detectable.
Kaizen is a long-term strategy while Poka Yoke is a short-term tactic.
Examples of Kaizen include implementing a sugge...
Points to consider while designing fixtures or gauges.
Understand the purpose of the fixture or gauge
Consider the material and size of the workpiece
Ensure proper clamping and alignment
Design for ease of use and maintenance
Consider the manufacturing process and cost
Test and validate the fixture or gauge before use
Production Engineer
48
salaries
| ₹1.8 L/yr - ₹5 L/yr |
Design Engineer
39
salaries
| ₹1.8 L/yr - ₹6 L/yr |
Assistant Engineer
23
salaries
| ₹2.2 L/yr - ₹3.6 L/yr |
Graduate Engineer Trainee (Get)
18
salaries
| ₹1.4 L/yr - ₹3.2 L/yr |
Engineer
14
salaries
| ₹2.6 L/yr - ₹5.2 L/yr |
Thermax Limited
Tractors and Farm Equipment
Isgec Heavy Engineering
Kirloskar Oil Engines