Filter interviews by
I applied via Referral and was interviewed in Dec 2022. There were 2 interview rounds.
posted on 3 Feb 2022
I applied via Walk-in and was interviewed before Feb 2021. There was 1 interview round.
I applied via Company Website and was interviewed before May 2021. There was 1 interview round.
I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.
posted on 19 Oct 2023
posted on 20 Nov 2021
I applied via Naukri.com and was interviewed in May 2021. There was 1 interview round.
posted on 11 Oct 2020
I applied via Recruitment Consulltant and was interviewed in Oct 2020. There were 5 interview rounds.
posted on 19 Feb 2024
I applied via Referral and was interviewed in Aug 2023. There were 2 interview rounds.
posted on 28 Mar 2024
I applied via Company Website and was interviewed before Mar 2023. There was 1 interview round.
The process of erection of duct involves planning, fabrication, transportation, installation, and testing.
Planning involves determining the layout, size, and material of the ducts.
Fabrication includes cutting, bending, and assembling the ducts according to the design.
Transportation is the movement of fabricated ducts to the installation site.
Installation involves positioning and connecting the ducts to the HVAC system.
...
The code followed for the fabrication of steel structure materials is typically based on industry standards and regulations.
The fabrication of steel structures is typically governed by codes such as the American Institute of Steel Construction (AISC) Code of Standard Practice.
Other codes that may be followed include the American Welding Society (AWS) D1.1 Structural Welding Code - Steel.
Fabrication processes must also ...
The erection sequence of a steel structure involves planning and executing the assembly of components in a specific order to ensure safety and stability.
Start by assembling the foundation and anchor bolts.
Next, erect the columns and connect them to the foundation.
Then, install the beams and trusses to form the framework.
After that, add the bracing and diagonal members for stability.
Finally, complete the structure by ad...
based on 1 interview
Interview experience
Production Engineer
49
salaries
| ₹1.8 L/yr - ₹5 L/yr |
Design Engineer
39
salaries
| ₹1.8 L/yr - ₹6 L/yr |
Assistant Engineer
23
salaries
| ₹2.2 L/yr - ₹3.6 L/yr |
Engineer
16
salaries
| ₹2.6 L/yr - ₹5.2 L/yr |
Graduate Engineer Trainee (Get)
15
salaries
| ₹1.5 L/yr - ₹3.3 L/yr |
ABB
Thermax Limited
Tractors and Farm Equipment
Isgec Heavy Engineering