Upload Button Icon Add office photos

Filter interviews by

Action Construction Equipment Senior Production Engineer Interview Questions and Answers

Updated 9 Sep 2024

Action Construction Equipment Senior Production Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Normal aptitude test of 30 questions in 30 minutes online

Interview Preparation Tips

Interview preparation tips for other job seekers - Read hydraulics and valves

Interview questions from similar companies

I applied via Naukri.com and was interviewed in May 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. They just asked basics que. related to job profile.. seeking confidence..

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident.... should have basic knowledge of process. and knowledege of work and items.. and their costing and commercial terms.

I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Maintenance phylosophy
  • Ans. Depends on equipment running hour, criticality, availability and standby.
  • Answered Anonymously

Interview Preparation Tips

Topics to prepare for Thermax Limited Senior Engineer interview:
  • Boe
  • Energy manager
Interview preparation tips for other job seekers - Be confidential and technically strong.

I applied via Naukri.com and was interviewed in Jul 2021. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 
Round 3 - One-on-one 
Round 4 - HR 

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident, most of the Questions based on past experience
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before May 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About your past experience
Round 3 - HR 

(1 Question)

  • Q1. About your past salary

I applied via Recruitment Consulltant and was interviewed in Oct 2020. There were 5 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Basic of fabrication, materials welding processes, distortion control methods, lifting techniques
  • Q2. Telephonic conversation regarding basics of welding and material properties
  • Q3. Interview with a panel of 4 judges
  • Q4. Salary negotiation notice period etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared. Be honest. Say no if you don't know the answer instead of guessing or pretending
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Salary expectations, notice period.
Round 2 - Technical 

(1 Question)

  • Q1. Calibration, process , Dcs, logic
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. What is the process of erection of duct
  • Ans. 

    The process of erection of duct involves planning, fabrication, transportation, installation, and testing.

    • Planning involves determining the layout, size, and material of the ducts.

    • Fabrication includes cutting, bending, and assembling the ducts according to the design.

    • Transportation is the movement of fabricated ducts to the installation site.

    • Installation involves positioning and connecting the ducts to the HVAC system.

    • ...

  • Answered by AI
  • Q2. What is the code followed for the fabrication of steel structure materials
  • Ans. 

    The code followed for the fabrication of steel structure materials is typically based on industry standards and regulations.

    • The fabrication of steel structures is typically governed by codes such as the American Institute of Steel Construction (AISC) Code of Standard Practice.

    • Other codes that may be followed include the American Welding Society (AWS) D1.1 Structural Welding Code - Steel.

    • Fabrication processes must also ...

  • Answered by AI
  • Q3. Erection sequence of steel structure
  • Ans. 

    The erection sequence of a steel structure involves planning and executing the assembly of components in a specific order to ensure safety and stability.

    • Start by assembling the foundation and anchor bolts.

    • Next, erect the columns and connect them to the foundation.

    • Then, install the beams and trusses to form the framework.

    • After that, add the bracing and diagonal members for stability.

    • Finally, complete the structure by ad...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. What is the Erection sequence of ESP ?
  • Ans. 

    The erection sequence of ESP involves several steps to ensure proper installation and functioning.

    • 1. Prepare the foundation for the ESP unit.

    • 2. Install the support structure for the ESP.

    • 3. Assemble the ESP components such as the casing, electrodes, and rapping system.

    • 4. Connect the necessary electrical and mechanical components.

    • 5. Test the ESP system for proper functioning before commissioning.

    • 6. Commission the ESP sys...

  • Answered by AI
  • Q2. Name of manufactures of various ESP materials supplier
  • Ans. 

    Various ESP materials suppliers include Schlumberger, Baker Hughes, Halliburton, Weatherford, and National Oilwell Varco.

    • Schlumberger

    • Baker Hughes

    • Halliburton

    • Weatherford

    • National Oilwell Varco

  • Answered by AI
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jun 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. What are some of the clients that i deal with.
  • Q2. Are you aware of the portals on which tenders are submitted.

Interview Preparation Tips

Interview preparation tips for other job seekers - To be honest, there were not much questioned asked by the employer. Just some basic questions about what i do and thats it. It did not feel like a interview but more of a friendly conversation.
one of the reason i feel that happened, because they were in need of a employee and they just selected me.

Action Construction Equipment Interview FAQs

How many rounds are there in Action Construction Equipment Senior Production Engineer interview?
Action Construction Equipment interview process usually has 1 rounds. The most common rounds in the Action Construction Equipment interview process are Aptitude Test.

Tell us how to improve this page.

Action Construction Equipment Senior Production Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Thermax Limited Interview Questions
4.1
 • 260 Interviews
ABB Interview Questions
4.1
 • 241 Interviews
Atlas Copco Interview Questions
4.2
 • 79 Interviews
Timken Interview Questions
4.0
 • 48 Interviews
View all
Action Construction Equipment Senior Production Engineer Salary
based on 32 salaries
₹3.1 L/yr - ₹7.3 L/yr
18% less than the average Senior Production Engineer Salary in India
View more details

Action Construction Equipment Senior Production Engineer Reviews and Ratings

based on 4 reviews

3.8/5

Rating in categories

4.2

Skill development

3.4

Work-life balance

3.0

Salary

4.2

Job security

3.0

Company culture

3.0

Promotions

3.8

Work satisfaction

Explore 4 Reviews and Ratings
Assistant Manager
186 salaries
unlock blur

₹3.2 L/yr - ₹10.4 L/yr

Senior Engineer
124 salaries
unlock blur

₹3 L/yr - ₹7.2 L/yr

Engineer
111 salaries
unlock blur

₹2 L/yr - ₹6 L/yr

Deputy Manager
87 salaries
unlock blur

₹6.4 L/yr - ₹13 L/yr

Production Engineer
82 salaries
unlock blur

₹2 L/yr - ₹5.4 L/yr

Explore more salaries
Compare Action Construction Equipment with

Thermax Limited

4.1
Compare

ABB

4.1
Compare

Isgec Heavy Engineering

3.8
Compare

Kirloskar Oil Engines

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview