I applied via LinkedIn and was interviewed in Apr 2024. There were 3 interview rounds.
Improving OEE involves optimizing equipment, reducing downtime, and improving quality.
Implement preventive maintenance schedules to reduce breakdowns
Train operators on proper equipment usage and maintenance
Utilize real-time monitoring systems to identify and address issues quickly
Optimize production schedules to minimize changeovers and downtime
Implement quality control measures to reduce defects and rework
Seeking new challenges and growth opportunities in a dynamic work environment.
Looking for new challenges to expand my skills and knowledge
Seeking opportunities for career advancement and growth
Interested in working in a more dynamic and innovative work environment
Yes, I am willing to relocate for the right opportunity.
I am open to relocating for a position that aligns with my career goals and offers growth opportunities.
I have relocated in the past for career advancement and have found it to be a positive experience.
I understand the importance of being flexible and adaptable in the workplace, including being open to relocation.
I am excited about the possibility of exploring new
Top trending discussions
I applied via Recruitment Consultant and was interviewed in Nov 2017. There were 8 interview rounds.
I applied via Company Website and was interviewed in Oct 2021. There was 1 interview round.
Motor and panel switchgear erection in oil and gas field
Experience in installation and maintenance of motor and panel switchgear in oil and gas field
Knowledge of safety regulations and procedures in hazardous environments
Ability to read and interpret technical drawings and schematics
Familiarity with testing and commissioning procedures
Experience in troubleshooting and resolving electrical issues
Examples: installation o...
Date of completion refers to the deadline or expected date of finishing a project or task.
It is important to set a realistic date of completion to ensure timely delivery of projects.
Factors such as available resources, team capacity, and project complexity should be considered when setting the date of completion.
Regular monitoring and tracking of progress can help ensure that the project is on track to meet the date of...
posted on 22 May 2024
I was interviewed in Apr 2024.
IATF focuses on automotive industry requirements while ISO 9001 is a generic quality management standard.
IATF 16949 is specifically designed for automotive industry suppliers
ISO 9001 is a generic quality management standard applicable to any industry
IATF 16949 includes additional automotive-specific requirements such as production part approval process (PPAP)
Both standards emphasize continual improvement and customer s
I applied via Recruitment Consulltant and was interviewed in Feb 2022. There were 2 interview rounds.
The steps of contract creation involve offer, acceptance, consideration, and mutual agreement.
Offer: One party proposes terms to another party.
Acceptance: The other party agrees to the terms proposed.
Consideration: Both parties exchange something of value.
Mutual agreement: Both parties come to a meeting of the minds.
Drafting: The contract is written and reviewed by both parties.
Execution: Both parties sign the contract...
I applied via Naukri.com
Prepare for topics on current events, government regulations, corporate trends
Prepare for Management case study on complex problems, strategic issues
I applied via Referral and was interviewed before Mar 2022. There were 2 interview rounds.
I have handled three types of chillers: Screw, Centrifugal, and Scroll.
I have experience working with Screw, Centrifugal, and Scroll chillers.
I am familiar with the maintenance and operation of these types of chillers.
For example, I have worked with a 200-ton Centrifugal chiller at my previous job.
Surge in centrifugal chiller is a condition where the flow of refrigerant is disrupted, causing a drop in pressure and flow rate.
Surge can occur when the chiller is operating at low load or when there is a sudden change in load.
It can cause damage to the compressor and other components of the chiller.
Surge can be prevented by using surge control devices such as inlet guide vanes, variable speed drives, and surge tanks.
...
based on 1 interview
Interview experience
Design Engineer
139
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
56
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Design Engineer
48
salaries
| ₹0 L/yr - ₹0 L/yr |
Technical Lead
41
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Software Engineer
35
salaries
| ₹0 L/yr - ₹0 L/yr |
Siemens
Schneider Electric
Emerson Electric Co.
ABB