PNC Infratech Water Treatment Plant Engineer Interview Questions and Answers

Updated 11 Feb 2025

PNC Infratech Water Treatment Plant Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected

I appeared for an interview in Jan 2025.

Round 1 - Site engineer 

(2 Questions)

  • Q1. Water Project work jjm
  • Q2. Water supply Project
Round 2 - Engineer site 

(2 Questions)

  • Q1. Site engineer at pipeline pump house
  • Q2. Pnc infra ltd up
Round 3 - Site engineer 

(2 Questions)

  • Q1. Pratibha interface ltd
  • Q2. Di pipe and hdpe pipe fhtc

Interview Preparation Tips

Interview preparation tips for other job seekers - Water Project work in up

Interview questions from similar companies

I applied via Campus Placement and was interviewed before Mar 2021. There were 2 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Give special attention towards technical aspects and on structural analysis.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. As per specification?
  • Q2. According to morth?
Round 2 - HR 

(2 Questions)

  • Q1. Physically test?
  • Q2. Back ground Condition?
  • Ans. 

    Background condition refers to the existing circumstances or situation that has led to the current state of affairs.

    • Background condition can include factors such as previous experiences, events, or decisions that have influenced the current situation.

    • It is important to consider the background condition when analyzing a problem or making decisions.

    • For example, in engineering, understanding the background condition of a ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Thanks IRB
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
Selected Selected

Interview Preparation Tips

Interview preparation tips for other job seekers - Job interview was not very hard.Actually they want candidates... Because everyone knows about their salary delay of 5-6 months.

Interview Questionnaire 

1 Question

  • Q1. Work experience questions first preference

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical Interview depends upon work experience,IS codes and software skills etc.

I applied via Walk-in and was interviewed in Mar 2021. There was 1 interview round.

Interview Questionnaire 

5 Questions

  • Q1. Why do we take only 1 set of cube sample at a casting of concrete of 5 or less than 5 Meter cube.
  • Ans. 

    Only 1 set of cube sample is taken at a casting of concrete of 5 or less than 5 Meter cube to save cost and time.

    • Taking multiple samples would increase the cost of testing.

    • The strength of concrete is usually consistent within a small volume.

    • ASTM C31 allows for only 1 set of samples for small volume concrete.

    • If the first set of samples fails, additional samples can be taken for verification.

  • Answered by AI
  • Q2. How do we take slump for casting of concrete and what if when we go rise about 50 meter height ...is their any difference in slump value as we go rise or in high rise buildings
  • Ans. 

    Slump for casting of concrete is measured using a cone. Slump value may decrease as height increases in high rise buildings.

    • Slump is measured using a cone and the difference between the height of the cone and the height of the concrete after it settles is the slump value.

    • As height increases in high rise buildings, the pressure on the concrete increases, which may cause the slump value to decrease.

    • To maintain the desire...

  • Answered by AI
  • Q3. What if we r doing a casting of concrete and in the meantime rain comes and continue for 2 days what would be the right bonding agent for recasting of concrete
  • Ans. 

    The right bonding agent for recasting of concrete after rain would be a polymer-modified cementitious bonding agent.

    • The surface should be cleaned and dried before applying the bonding agent.

    • The bonding agent should be applied in a thin layer using a brush or roller.

    • The recasting of concrete should be done within the specified time frame mentioned by the bonding agent manufacturer.

    • Examples of polymer-modified cementitio...

  • Answered by AI
  • Q4. Shear force and bending moment description and calculation..
  • Ans. 

    Shear force is the force perpendicular to the beam and bending moment is the torque that causes bending of the beam.

    • Shear force is calculated by finding the algebraic sum of all the forces acting on one side of the beam.

    • Bending moment is calculated by finding the algebraic sum of all the moments acting on one side of the beam.

    • Shear force and bending moment diagrams are used to visualize the distribution of these forces...

  • Answered by AI
  • Q5. CMDI AND HDPE DIFFERENCE
  • Ans. 

    CMDI and HDPE are two different types of plastic materials used in various applications.

    • CMDI stands for Chlorinated Polyethylene Modified Polyethylene and is a thermoplastic elastomer used in wire and cable insulation, automotive parts, and roofing membranes.

    • HDPE stands for High-Density Polyethylene and is a thermoplastic polymer used in packaging, pipes, and construction materials.

    • CMDI has better resistance to chemica...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Go for it u will succeed and have confidence ...confidence makes ur interview better......

I applied via Company Website and was interviewed in Jun 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. BBS regarding pile cap, pier, and quality related questions I.e about steel and concrete.

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be in Confidence and hv command on your previous years experience.

Interview Questionnaire 

1 Question

  • Q1. What is your current salary

I applied via Company Website and was interviewed before Nov 2021. There were 3 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - study IS 456 thouroughly and you can answer for many questions
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2023. There were 2 interview rounds.

Contribute & help others!
anonymous
You can choose to be anonymous

PNC Infratech Interview FAQs

What are the top questions asked in PNC Infratech Water Treatment Plant Engineer interview?

Some of the top questions asked at the PNC Infratech Water Treatment Plant Engineer interview -

  1. Site engineer at pipeline pump ho...read more
  2. Di pipe and hdpe pipe f...read more
  3. Water Project work ...read more

Recently Viewed

INTERVIEWS

Netcon Technologies

No Interviews

INTERVIEWS

India Nippon Electricals

No Interviews

INTERVIEWS

Leaap International

No Interviews

INTERVIEWS

Hexaware Technologies

No Interviews

INTERVIEWS

Netcon Technologies

No Interviews

INTERVIEWS

Hexaware Technologies

No Interviews

SALARIES

H.G. Infra Engineering

SALARIES

H.G. Infra Engineering

No Salaries

INTERVIEWS

India Nippon Electricals

No Interviews

SALARIES

H.G. Infra Engineering

Tell us how to improve this page.

PNC Infratech Water Treatment Plant Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 746 Interviews
Tata Projects Interview Questions
4.2
 • 432 Interviews
KEC International Interview Questions
4.0
 • 300 Interviews
Dilip Buildcon Interview Questions
4.0
 • 141 Interviews
G R Infraprojects Interview Questions
4.1
 • 134 Interviews
AtkinsRealis Interview Questions
4.0
 • 87 Interviews
View all
Assistant Engineer
172 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Junior Engineer
111 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
78 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Accountant
50 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Accounts Officer
49 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare PNC Infratech with

Ashoka Buildcon

4.1
Compare

IRB Infrastructure

4.0
Compare

Nagarjuna Construction Company

4.1
Compare

Simplex Infrastructures

3.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview