Filter interviews by
I applied via Approached by Company
PPC (Production Planning and Control) is a crucial aspect of manufacturing operations, ensuring efficient utilization of resources and timely delivery of products.
PPC involves creating a detailed plan for production activities, including scheduling, resource allocation, and inventory management.
It helps in optimizing production processes, reducing costs, and improving overall productivity.
PPC ensures that manufacturing...
Capacity planning and scheduling involves optimizing production efficiency through strategic planning and resource allocation.
Analyze historical data and trends to forecast future demand
Identify production bottlenecks and areas for improvement
Allocate resources effectively to meet demand
Implement scheduling techniques like just-in-time production or lean manufacturing
Regularly monitor and adjust production schedules ba...
I have extensive experience with Material Requirement Planning (MRP).
I have worked with MRP systems to plan and manage inventory levels.
I have used MRP to forecast demand and create production schedules.
I have collaborated with cross-functional teams to ensure accurate data inputs for MRP calculations.
I have monitored MRP outputs to identify potential supply chain issues and take proactive measures.
I have optimized MRP...
To ensure smooth flow of materials and resources through the production process, it is important to implement effective planning, communication, and monitoring strategies.
Develop a comprehensive production plan that outlines the required materials, resources, and timelines for each stage of the process.
Establish clear communication channels between different departments involved in the production process to ensure time...
I handle production deviation or disruptions by closely monitoring the production process and making necessary adjustments.
Regularly monitor the production process to identify any deviations or disruptions
Analyze the root cause of the deviation or disruption
Adjust the production plan based on the analysis
Communicate with relevant stakeholders to ensure smooth adjustment
Implement corrective actions to prevent future dev
To monitor and analyze KPIs for production performance and identify areas of improvement, I use a combination of data tracking tools, performance metrics, and regular reporting.
I utilize data tracking tools like Google Analytics and Google Ads to collect relevant data on key performance indicators (KPIs) such as click-through rates, conversion rates, and cost per click.
I set up custom dashboards and reports to track an...
I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Mar 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed before Aug 2021. There were 2 interview rounds.
Costing for different types of BOPP involves various factors such as raw material cost, production cost, and overhead expenses.
Raw material cost includes the cost of polypropylene resin, additives, and other materials used in the production process.
Production cost includes expenses related to labor, energy, and maintenance of machinery.
Overhead expenses include costs related to administration, marketing, and distributi...
I appeared for an interview in Mar 2023.
Polymers are large molecules made up of repeating units called monomers.
Polymers can be natural or synthetic.
Examples of natural polymers include proteins, DNA, and cellulose.
Examples of synthetic polymers include plastics, nylon, and rubber.
Polymers have a wide range of applications in industries such as packaging, textiles, and medicine.
Project explain refers to explaining the details and objectives of a particular project. Industrial visit explain refers to explaining the purpose and outcomes of visiting an industrial site.
Project explain involves discussing the scope, goals, timeline, and budget of a project.
Industrial visit explain involves highlighting the benefits of visiting an industrial site, such as gaining practical knowledge, networking, an...
posted on 22 Sep 2022
I applied via Approached by Company and was interviewed in Apr 2022. There were 2 interview rounds.
Preventive maintenance is a proactive approach to maintenance that aims to prevent equipment failure before it occurs.
Regularly scheduled inspections and maintenance
Replacing worn or damaged parts before they cause a breakdown
Cleaning and lubricating equipment to prevent wear and tear
Keeping accurate records of maintenance activities
Examples: changing the oil in a car, replacing air filters in HVAC systems, inspecting
SAP PM module is used for managing maintenance activities of an organization.
PM stands for Plant Maintenance
It helps in planning and scheduling maintenance tasks
Tracks equipment and maintenance history
Provides cost analysis and reporting
Integrates with other SAP modules like MM and FI
Example: A manufacturing company can use SAP PM to schedule maintenance of their production equipment
I have handled various utilities equipments including generators, chillers, HVAC systems, and water treatment plants.
Generators: responsible for maintenance and repair of diesel and gas generators
Chillers: handled installation and maintenance of air-cooled and water-cooled chillers
HVAC systems: managed repair and maintenance of heating, ventilation, and air conditioning systems
Water treatment plants: responsible for op...
Bearings are used to reduce friction between two moving parts. There are several types of bearings.
Plain bearings
Rolling element bearings
Jewel bearings
Fluid bearings
Magnetic bearings
posted on 18 Aug 2023
I applied via Approached by Company and was interviewed in Feb 2023. There were 4 interview rounds.
I applied via Walk-in and was interviewed before Sep 2022. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Nov 2024. There was 1 interview round.
Methods to prevent corrosion of railway tracks include regular inspection, painting, cathodic protection, and using corrosion-resistant materials.
Regular inspection of tracks to identify and address corrosion early
Painting the tracks with corrosion-resistant coatings
Applying cathodic protection to prevent corrosion
Using corrosion-resistant materials in track construction
Implementing proper drainage systems to prevent w
Seeking new challenges and opportunities for growth.
Desire for career advancement
Looking for new challenges
Seeking better work-life balance
Relocation to a new area
Company downsizing or restructuring
Conflict with management or colleagues
I can join within 2 weeks of receiving a formal offer.
I will need to provide a notice period to my current employer.
I may need time to relocate if the job is in a different city.
I will need to finalize any pending commitments before joining.
I can start the onboarding process as soon as possible to expedite the joining date.
Some of the top questions asked at the Plastene interview -
based on 2 interviews
Interview experience
based on 42 reviews
Rating in categories
Executive Accountant
9
salaries
| ₹1.9 L/yr - ₹3.4 L/yr |
Marketing Manager
7
salaries
| ₹9 L/yr - ₹12 L/yr |
Purchase Manager
6
salaries
| ₹6.2 L/yr - ₹7.2 L/yr |
Assistant Manager
6
salaries
| ₹4.2 L/yr - ₹5.3 L/yr |
Purchase Engineer
5
salaries
| ₹3.2 L/yr - ₹4.8 L/yr |
Uflex
EPL Limited
Jindal Poly Films
Hindusthan National Glass