Upload Button Icon Add office photos

Filter interviews by

Plastene PPC Engineer Interview Questions, Process, and Tips

Updated 8 Feb 2024

Plastene PPC Engineer Interview Experiences

1 interview found

PPC Engineer Interview Questions & Answers

user image Anonymous

posted on 8 Feb 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company

Round 1 - One-on-one 

(7 Questions)

  • Q1. Can you explain your understanding of PPC and its importance in manufacturing operations?
  • Ans. 

    PPC (Production Planning and Control) is a crucial aspect of manufacturing operations, ensuring efficient utilization of resources and timely delivery of products.

    • PPC involves creating a detailed plan for production activities, including scheduling, resource allocation, and inventory management.

    • It helps in optimizing production processes, reducing costs, and improving overall productivity.

    • PPC ensures that manufacturing...

  • Answered by AI
  • Q2. How do you approach capacity planning and scheduling to optimize production efficiency?
  • Ans. 

    Capacity planning and scheduling involves optimizing production efficiency through strategic planning and resource allocation.

    • Analyze historical data and trends to forecast future demand

    • Identify production bottlenecks and areas for improvement

    • Allocate resources effectively to meet demand

    • Implement scheduling techniques like just-in-time production or lean manufacturing

    • Regularly monitor and adjust production schedules ba...

  • Answered by AI
  • Q3. Can you discuss your experience with Material Requirement Planning?
  • Ans. 

    I have extensive experience with Material Requirement Planning (MRP).

    • I have worked with MRP systems to plan and manage inventory levels.

    • I have used MRP to forecast demand and create production schedules.

    • I have collaborated with cross-functional teams to ensure accurate data inputs for MRP calculations.

    • I have monitored MRP outputs to identify potential supply chain issues and take proactive measures.

    • I have optimized MRP...

  • Answered by AI
  • Q4. How do you ensure smooth flow of materials and resources through production process to meet the production targets?
  • Ans. 

    To ensure smooth flow of materials and resources through the production process, it is important to implement effective planning, communication, and monitoring strategies.

    • Develop a comprehensive production plan that outlines the required materials, resources, and timelines for each stage of the process.

    • Establish clear communication channels between different departments involved in the production process to ensure time...

  • Answered by AI
  • Q5. How do you handle production deviation or disruptions and adjust the production plan accordingly?
  • Ans. 

    I handle production deviation or disruptions by closely monitoring the production process and making necessary adjustments.

    • Regularly monitor the production process to identify any deviations or disruptions

    • Analyze the root cause of the deviation or disruption

    • Adjust the production plan based on the analysis

    • Communicate with relevant stakeholders to ensure smooth adjustment

    • Implement corrective actions to prevent future dev

  • Answered by AI
  • Q6. How do you monitor and analyze KPIs to evaluate production performance and identify key area of improvements?
  • Ans. 

    To monitor and analyze KPIs for production performance and identify areas of improvement, I use a combination of data tracking tools, performance metrics, and regular reporting.

    • I utilize data tracking tools like Google Analytics and Google Ads to collect relevant data on key performance indicators (KPIs) such as click-through rates, conversion rates, and cost per click.

    • I set up custom dashboards and reports to track an...

  • Answered by AI
  • Q7. How effectively and efficiently do you collaborate with other departments?

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be confident with the work experience you've got. It's a great company to work for. Ace the interview with cool and calm mind.

Interview questions from similar companies

Interview Questionnaire 

2 Questions

  • Q1. Formules in Microsoft Excel, like vlookup,hlookup, pivot, Planning sop,
  • Ans. 

    Microsoft Excel formulas like vlookup, hlookup, pivot, and Planning sop.

    • vlookup and hlookup are used to search for specific data in a table

    • pivot tables are used to summarize and analyze data

    • Planning sop is a formula used for planning and scheduling

    • Excel has many other useful formulas for data analysis and manipulation

  • Answered by AI
  • Q2. Units conversions,sap transaction, MRP run procedure,
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Recruitment Consulltant and was interviewed in Jun 2024. There was 1 interview round.

Round 1 - Technical 

(11 Questions)

  • Q1. What is VFD what is the basic control for operate a vfd
  • Ans. 

    VFD stands for Variable Frequency Drive, it is used to control the speed of an electric motor.

    • VFD is used to vary the speed of an electric motor by adjusting the frequency of the electrical supply to the motor.

    • Basic control for operating a VFD includes setting the desired speed or frequency, start/stop commands, and monitoring parameters like current and voltage.

    • Examples of basic controls for operating a VFD include ke...

  • Answered by AI
  • Q2. How to check a motor ,how to identified if motor is ok or not ,
  • Ans. 

    To check a motor, perform visual inspection, check for unusual noises or vibrations, test electrical connections, measure voltage and current, and perform insulation resistance test.

    • Perform visual inspection for any signs of damage or wear

    • Check for unusual noises or vibrations during operation

    • Test electrical connections for tightness and proper wiring

    • Measure voltage and current to ensure they are within specifications

    • P...

  • Answered by AI
  • Q3. What is the monthly electricity bill
  • Ans. 

    The monthly electricity bill varies depending on usage and location.

    • The monthly electricity bill can be influenced by factors such as the size of the property, number of occupants, energy efficiency of appliances, and local electricity rates.

    • Usage of high-energy consuming appliances like air conditioners, heaters, and refrigerators can significantly impact the electricity bill.

    • Location plays a role as electricity rates...

  • Answered by AI
  • Q4. What is the plant load
  • Ans. 

    Plant load refers to the amount of power being consumed by a plant or facility at a given time.

    • Plant load is measured in kilowatts (kW) or megawatts (MW).

    • It represents the total electrical demand of the plant's equipment and machinery.

    • Plant load can fluctuate throughout the day based on production needs and equipment usage.

    • Monitoring plant load is important for ensuring efficient operation and preventing overload.

    • Examp...

  • Answered by AI
  • Q5. What is the power factor and why it need to maintain ,on which power quantity or quality it impact and how this impact actually can be seen
  • Ans. 

    Power factor is the ratio of real power to apparent power in an electrical system. It needs to be maintained for efficient power transfer and to avoid penalties from utility companies.

    • Power factor impacts the efficiency of power transfer in electrical systems

    • Low power factor can result in higher energy costs and penalties from utility companies

    • It affects the quality of power supply and can lead to voltage drops and equ...

  • Answered by AI
  • Q6. Proximity sensor and realy uses
  • Ans. 

    Proximity sensors detect the presence of an object without physical contact, while relays are used to control electrical circuits.

    • Proximity sensors use electromagnetic fields, light, or sound to detect objects nearby.

    • Relays are switches that open or close circuits based on an electrical signal.

    • Proximity sensors can be used in automated doors, smartphones, and industrial machinery.

    • Relays are used in control panels, HVAC

  • Answered by AI
  • Q7. Daily job profile ,
  • Q8. Daily reports ,reporting to
  • Q9. Preventive maintenance schedule
  • Ans. 

    Preventive maintenance schedule involves regular inspections and maintenance tasks to prevent equipment breakdowns.

    • Create a detailed list of all equipment that needs maintenance

    • Establish a regular schedule for inspections and maintenance tasks

    • Document all maintenance activities and keep records for future reference

    • Prioritize maintenance tasks based on criticality and impact on operations

    • Train maintenance staff on prope

  • Answered by AI
  • Q10. Compressor a b check
  • Q11. Dg a b check

Interview Preparation Tips

Interview preparation tips for other job seekers - Just prepare atleast for a hand on working experiences
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Tell me about yourself
  • Q2. Where do you see yourself after 5 years

Interview Preparation Tips

Interview preparation tips for other job seekers - There were 2 rounds of technical interview. In first one it was core technical questions and in second one job related questions as well as aptitude questions. They were asking very basic questions regarding to your area of study. It take a whole day for us but the interviewer were very helpful and environment was comfortable.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via campus placement at National Institute of Technology, Surathkal and was interviewed in Oct 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Questions related to personal and some managerial questions and aptitude and also subject related questions

Round 3 - One-on-one 

(1 Question)

  • Q1. Asked to introduce about myself and questions related to motors like tell me different types of motors and related to switch gear like types of circuit breakers,tell about the starting of induction motor,a...
Round 4 - HR 

(1 Question)

  • Q1. After one to one round we were asked to come to Mumbai for final interview.Flight tickets and all given by the company itself.

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be confident and try to express yourself in a very polite manner.Try to improve your communication skills for us speaking Hindi is must
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Dec 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. All about Packaging
  • Q2. All about BOPP film line
Round 2 - HR 

(2 Questions)

  • Q1. Why u want to change job
  • Q2. Why u want to change job and other things
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - Aptitude Test 

General previous experience related

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Basic normal intro and previous company profile
  • Q2. Simple totally basic questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Overall good company to work and good environment work life balance is good
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Sep 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Aptitude Test 

Simple math and reasoning question

Round 3 - Technical 

(4 Questions)

  • Q1. Basis questions related to your work experience
  • Q2. Explained what is 5s and types
  • Ans. 

    5S is a methodology used to organize a workplace for efficiency and effectiveness.

    • 5S stands for Sort, Set in Order, Shine, Standardize, and Sustain.

    • Sort involves removing unnecessary items from the workplace.

    • Set in Order focuses on organizing items in a logical manner for easy access.

    • Shine involves keeping the workplace clean and free of clutter.

    • Standardize is about creating consistent processes and procedures for main...

  • Answered by AI
  • Q3. What is yourresponsibility in your previous company
  • Q4. Why you want to change your previous company
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. About your engineering project

Interview Preparation Tips

Interview preparation tips for other job seekers - Read basic laws of thermodynamics for technical round

Plastene Interview FAQs

How many rounds are there in Plastene PPC Engineer interview?
Plastene interview process usually has 1 rounds. The most common rounds in the Plastene interview process are One-on-one Round.
What are the top questions asked in Plastene PPC Engineer interview?

Some of the top questions asked at the Plastene PPC Engineer interview -

  1. How do you ensure smooth flow of materials and resources through production pro...read more
  2. How do you monitor and analyze KPIs to evaluate production performance and iden...read more
  3. Can you explain your understanding of PPC and its importance in manufacturing o...read more

Tell us how to improve this page.

Plastene PPC Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Uflex Interview Questions
3.8
 • 104 Interviews
Cosmo Films Interview Questions
3.7
 • 33 Interviews
Balmer Lawrie Interview Questions
3.8
 • 27 Interviews
Alpla Interview Questions
3.9
 • 24 Interviews
EPL Limited Interview Questions
4.0
 • 21 Interviews
Can-Pack Interview Questions
4.3
 • 16 Interviews
View all
Executive Accountant
9 salaries
unlock blur

₹1.9 L/yr - ₹3.4 L/yr

Marketing Manager
7 salaries
unlock blur

₹9 L/yr - ₹12 L/yr

Purchase Manager
6 salaries
unlock blur

₹6.2 L/yr - ₹7.2 L/yr

Assistant Manager
6 salaries
unlock blur

₹4.2 L/yr - ₹5.3 L/yr

Senior Manager Sales & Marketing
5 salaries
unlock blur

₹15 L/yr - ₹21 L/yr

Explore more salaries
Compare Plastene with

Uflex

3.8
Compare

EPL Limited

4.0
Compare

Jindal Poly Films

3.6
Compare

Hindusthan National Glass

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview