i
P.J Valves Manufacturing
Filter interviews by
Be the first one to contribute and help others!
I applied via LinkedIn and was interviewed in Apr 2024. There were 5 interview rounds.
One for personality and another for Technical
I applied via Recruitment Consulltant and was interviewed in Aug 2024. There was 1 interview round.
posted on 29 May 2024
I applied via Approached by Company
posted on 28 Jun 2024
I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.
Risk assessment involves identifying hazards, evaluating risks, implementing control measures, and reviewing effectiveness.
Identify hazards present in the workplace
Evaluate the risks associated with each hazard
Implement control measures to reduce or eliminate risks
Review the effectiveness of the control measures
Document the risk assessment process and findings
Question asked form mechanical field
posted on 21 Nov 2023
I applied via Naukri.com and was interviewed in Oct 2023. There were 4 interview rounds.
posted on 14 May 2024
I applied via Naukri.com and was interviewed before May 2023. There were 3 interview rounds.
Basic electronics question
posted on 16 Feb 2023
I am a Senior Chemical Engineer with expertise in process optimization and project management.
Over 10 years of experience in the chemical engineering field
Proficient in designing and implementing process improvements
Strong knowledge of safety regulations and environmental standards
Managed multiple projects from conception to completion, resulting in cost savings and increased efficiency
Collaborated with cross-functiona...
Line size calculation depends on flow rate, fluid properties, and pressure drop.
Determine the required flow rate
Determine the fluid properties such as viscosity and density
Calculate the pressure drop based on the length of the line and the fittings used
Select a line size that can handle the required flow rate with an acceptable pressure drop
Consider factors such as cost and space limitations
Use industry standards and g...
The pump will observe both kerosene and water being pumped together.
The pump will not be able to differentiate between the two liquids
Both liquids will be pumped together in the same flow
The mixture of kerosene and water may cause issues in downstream processes
Separation techniques such as gravity settling or centrifugation may be required to separate the two liquids
H2 will have more pressure drop than N2 for 100 kg/hr
H2 has a smaller molecular size than N2
Higher flow rate leads to higher pressure drop
This phenomenon is commonly observed in gas pipelines
To enhance flow by twice, pipe diameter needs to be increased by factor of 1.19 and velocity needs to be reduced by half.
Increase pipe diameter by factor of 1.19
Reduce velocity by half
Consider the fluid properties and pressure drop
Ensure the pipe material can handle the increased flow
Check for any potential blockages or obstructions in the pipeline
Slight increase in distillation column pressure without flooding will not affect separation
Slight increase in pressure does not cause flooding which is the main factor affecting separation
Separation efficiency may decrease slightly but not significantly
Factors like temperature, feed rate, and composition also affect separation
I want to relocate from my home city to Gurgaon for better career opportunities and professional growth.
Gurgaon offers a thriving job market with numerous opportunities for chemical engineers.
The city is home to several multinational companies and industrial hubs, providing a conducive environment for career advancement.
Gurgaon has a well-developed infrastructure and is known for its modern amenities, making it an attr...
I want to change my job profile from Process operation engineer to Process design engineer because I am interested in the creative and analytical aspects of designing processes.
I have always been fascinated by the process of designing and optimizing chemical processes.
I enjoy problem-solving and finding innovative solutions to improve efficiency and productivity.
I believe that my experience as a Process operation engin...
posted on 20 Dec 2023
Faults in transmission lines can include short circuits, open circuits, and insulation breakdown.
Short circuits occur when two conductors come into contact, causing a sudden increase in current flow.
Open circuits happen when there is a break in the conductor, leading to a loss of continuity in the circuit.
Insulation breakdown occurs when the insulation material fails, resulting in leakage current or arcing.
Other faults...
based on 17 reviews
Rating in categories
Project Administrator
13
salaries
| ₹5.2 L/yr - ₹8.5 L/yr |
Design Engineer
9
salaries
| ₹3 L/yr - ₹7.8 L/yr |
Assistant Manager
7
salaries
| ₹6 L/yr - ₹8.8 L/yr |
Project Coordinator
6
salaries
| ₹2.7 L/yr - ₹5.5 L/yr |
Manager
4
salaries
| ₹15 L/yr - ₹22 L/yr |
L&T Valves
Forbes Marshall
Velan
C.R.I. Pumps