I appeared for an interview before Feb 2024.
To understand if you're a possible fit by checking your experience/proficiencies with what's required for the role
Assignment based on role and function similar and related to daily scope of work
Psychometric Evaluation
I appeared for an interview before Feb 2024.
Logical and reasonable questions necessitate thorough study.
I applied via Company Website and was interviewed before May 2023. There were 5 interview rounds.
Project given to test capability
Psychometric Evaluation
I applied via Referral and was interviewed before Aug 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Oct 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Jun 2023. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Apr 2021. There were 3 interview rounds.
Different projects require different management methods. Here are some pointers.
Identify the project's goals and objectives
Create a project plan and timeline
Assign tasks and responsibilities to team members
Monitor progress and adjust plans as needed
Communicate regularly with stakeholders
Use project management software to track tasks and deadlines
Tools used in program management include Gantt charts, project management software, and risk management tools.
Gantt charts help visualize project timelines and dependencies
Project management software like Asana or Trello can help with task assignment and tracking
Risk management tools like SWOT analysis or FMEA can help identify and mitigate potential issues
Communication tools like Slack or Microsoft Teams can help keep
Bottleneck management involves identifying and resolving issues that slow down project progress.
Identify the bottleneck by analyzing the project flow
Prioritize the bottleneck based on its impact on the project timeline
Develop a plan to resolve the bottleneck
Implement the plan and monitor progress
Communicate with stakeholders about the bottleneck and its resolution
Programs management involves planning, executing, monitoring, and controlling the processes of a project.
Identify project goals and objectives
Develop a project plan
Assign tasks and responsibilities
Monitor progress and make adjustments
Evaluate project success and identify areas for improvement
I applied via Referral and was interviewed in Mar 2022. There was 1 interview round.
Fire extinguishers should be kept in easily accessible locations throughout a building.
Fire extinguishers should be placed on every floor of a building.
They should be easily visible and accessible, preferably mounted on walls or placed on stands.
Fire extinguishers should be located near potential fire hazards, such as kitchens or electrical equipment.
They should be placed in well-lit areas and not obstructed by furnitu...
I applied via Recruitment Consultant and was interviewed in Apr 2021. There was 1 interview round.
BET validation aims to ensure the accuracy and reliability of analytical results obtained from BET surface area measurements.
BET validation is necessary to ensure the quality of analytical results.
It involves verifying the accuracy and precision of the instrument used for BET surface area measurements.
BET validation also includes checking the validity of the assumptions made during the analysis.
Examples of BET validati...
I applied via Approached by Company and was interviewed in Nov 2021. There was 1 interview round.
Flow of change control refers to the process of managing changes to a project or system.
Change requests are submitted and reviewed by a change control board
The board evaluates the impact of the change and decides whether to approve or reject it
If approved, the change is implemented and tested
Documentation is updated to reflect the change
The change control process ensures that changes are made in a controlled and system
Inprocess check failure of metal detector can be handled by following proper procedures and protocols.
Immediately stop the production line and isolate the affected product.
Investigate the cause of the failure and take corrective actions.
Notify the quality control department and involve them in the investigation.
Conduct a thorough inspection of the metal detector and ensure it is functioning properly before resuming pro...
Factors affecting weight variation during compression include formulation, equipment, and process parameters.
Formulation: particle size, shape, and density, excipient type and concentration
Equipment: type of tablet press, tooling, and compression force
Process parameters: compression speed, dwell time, and pre-compression force
Example: changing the excipient concentration can affect the weight variation of tablets
Exampl...
based on 8 interviews
1 Interview rounds
based on 17 reviews
Rating in categories
Senior Research Associate
431
salaries
| ₹2.4 L/yr - ₹10.7 L/yr |
Executive
402
salaries
| ₹2.2 L/yr - ₹8 L/yr |
Senior Executive
226
salaries
| ₹3 L/yr - ₹9.8 L/yr |
Team Member
203
salaries
| ₹1.9 L/yr - ₹5.8 L/yr |
Chemist
157
salaries
| ₹1.5 L/yr - ₹4.2 L/yr |
Hetero
Viatris
Abbott
Micro Labs