I applied via Recruitment Consulltant and was interviewed before Feb 2023. There were 2 interview rounds.
OEE stands for Overall Equipment Efficiency. It is a measure of how effectively a production line or machine is utilized.
OEE is calculated by multiplying Availability, Performance, and Quality factors.
Availability measures the actual production time compared to the planned production time.
Performance measures the actual production rate compared to the ideal production rate.
Quality measures the good units produced compa...
Air compressor load requirements can be calculated by considering factors such as air demand, duty cycle, and pressure requirements.
Determine the required air demand by assessing the total air consumption of all connected equipment.
Consider the duty cycle, which is the percentage of time the compressor will be running.
Calculate the pressure requirements based on the highest pressure needed for any equipment or process.
...
The pillars in TPM are the foundational elements that support the implementation and success of Total Productive Maintenance.
1. Jishu Hozen (Autonomous Maintenance): Operators are responsible for routine maintenance tasks and inspections to prevent breakdowns.
2. Kobetsu Kaizen (Focused Improvement): Continuous improvement activities focused on specific areas to eliminate waste and improve productivity.
3. Planned Mainte...
AM step in TPM refers to Autonomous Maintenance, which involves operators taking responsibility for routine maintenance tasks.
Autonomous Maintenance (AM) is a key step in Total Productive Maintenance (TPM) implementation.
AM involves operators taking responsibility for routine maintenance tasks.
Operators are trained to perform basic maintenance activities like cleaning, inspection, lubrication, and tightening.
AM aims to...
To do prod planned, you need to create a production plan that outlines the tasks, resources, and timeline for completing the production process.
Identify the production requirements and goals
Determine the necessary resources, such as materials, equipment, and manpower
Create a detailed production schedule, including start and end dates for each task
Allocate resources effectively to ensure smooth workflow
Monitor progress ...
Budgeting involves creating a financial plan for a specific period, estimating income and expenses, and allocating resources accordingly.
Identify financial goals and objectives
Estimate income and expenses
Allocate resources based on priorities
Monitor and review the budget regularly
Make adjustments as necessary
Top trending discussions
Breakdown maintenance is done after preventive maintenance to address unexpected failures and ensure continuous operation of equipment.
Preventive maintenance aims to reduce the likelihood of equipment failure through regular inspections and maintenance tasks.
Despite preventive maintenance efforts, unexpected failures can still occur due to various factors such as wear and tear, environmental conditions, and operational...
posted on 5 Sep 2024
I applied via Recruitment Consulltant and was interviewed before Sep 2023. There were 2 interview rounds.
Job related Q&A to know your ability.
Self introduction, define key area as a Production manager, HR policy, maintenance,SAP related questions...✔️
posted on 2 Apr 2023
I applied via Campus Placement and was interviewed in May 2023. There were 3 interview rounds.
posted on 21 Feb 2023
I applied via Naukri.com
Technical interview panel of min 3 conducts interview.
I have 5 years of experience as an Assistant Manager - Production in a manufacturing company.
Managed a team of 20 production workers and ensured smooth operations
Developed and implemented production schedules to meet customer demands
Monitored and optimized production processes to improve efficiency
Collaborated with other departments to resolve any production-related issues
Conducted regular quality checks to maintain pr...
The critical thing in my last company was implementing a new production system.
The challenge was to transition from the old manual production process to an automated system.
I led a team of technicians and engineers to evaluate different systems and select the most suitable one.
We faced resistance from some employees who were hesitant about the change.
To address this, I organized training sessions to familiarize them wi...
I applied via LinkedIn and was interviewed in Mar 2022. There was 1 interview round.
posted on 12 Nov 2021
I applied via Walk-in and was interviewed before Jul 2021. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Dec 2019. There were 5 interview rounds.
Territory Sales Manager
224
salaries
| ₹10 L/yr - ₹23 L/yr |
Sales Executive
206
salaries
| ₹1.8 L/yr - ₹6 L/yr |
Assistant Manager
151
salaries
| ₹8 L/yr - ₹22.4 L/yr |
Regional Sales Executive
115
salaries
| ₹8 L/yr - ₹15 L/yr |
Executive Production
104
salaries
| ₹5 L/yr - ₹11.6 L/yr |
Diageo
United Spirits
Bacardi
Suntory Global Spirits