The minimum bitumen content of BC-1, BC-2, and DBM varies depending on the specifications of the project.
The minimum bitumen content is determined by the mix design of the project.
BC-1 typically has a minimum bitumen content of 4.5% by weight of total mix.
BC-2 typically has a minimum bitumen content of 5.0% by weight of total mix.
DBM typically has a minimum bitumen content of 5.5% by weight of total mix.
The minimum bit...
Core tests should be conducted at regular intervals depending on the project requirements.
Frequency of core tests depends on the type of material being tested and the project requirements.
For example, in construction projects, core tests may be conducted every 50 feet of concrete poured.
In manufacturing, core tests may be conducted daily or weekly to ensure consistent quality.
Regular core testing helps identify any iss...
based on 1 review
Rating in categories
Highway Maintenance Engineer
7
salaries
| ₹4.5 L/yr - ₹8.6 L/yr |
System Engineer
6
salaries
| ₹4.8 L/yr - ₹6 L/yr |
Manager
5
salaries
| ₹9 L/yr - ₹13 L/yr |
Associate Manager
4
salaries
| ₹6.5 L/yr - ₹12.6 L/yr |
Senior Manager
4
salaries
| ₹12 L/yr - ₹35 L/yr |
Lulu International Shopping Mall
Signature Global
HM Group
Sunteck Realty