Upload Button Icon Add office photos

Parekh Integrated Services

Compare button icon Compare button icon Compare

Filter interviews by

Parekh Integrated Services Project Management Officer Interview Questions and Answers

Updated 5 Aug 2024

6 Interview questions

A Project Management Officer was asked 10mo ago
Q. Draw a power triangle.
Ans. 

The Power triangle is a diagram used in project management to illustrate the relationship between scope, time, and cost.

  • The three sides of the triangle represent scope, time, and cost.

  • The triangle shows that changes in one aspect will affect the other two.

  • For example, increasing the scope of a project will likely lead to an increase in time and cost.

  • Conversely, reducing the time allocated to a project may require ...

A Project Management Officer was asked 10mo ago
Q. What are SP, TPN, and VTPN?
Ans. 

SP stands for Schedule Performance, TPN stands for Total Planned Value, VTPN stands for Value of Total Planned Value

  • SP is a measure of how well the project is adhering to the schedule

  • TPN is the total budgeted cost of the work scheduled to be done

  • VTPN is the earned value of the work actually completed

Project Management Officer Interview Questions Asked at Other Companies

asked in GMR Group
Q1. What score would you give yourself for different software in the ... read more
asked in Amdocs
Q2. What is a VBA program that can filter Excel data based on two col ... read more
asked in Amdocs
Q3. Can you provide examples that illustrate the use of DAX in Power ... read more
asked in Olympiados
Q4. A project has a 60% chance of INR PHONE_NUMBER profit and 40% cha ... read more
Q5. Describe your experience leading a team and effectively dealing w ... read more
A Project Management Officer was asked 10mo ago
Q. Can you draw a Single Line Diagram (SLD) from a substation to a room light?
Ans. 

SLD (Single Line Diagram) shows the electrical connections from substation to room light.

  • Start with the substation as the power source

  • Draw a line representing the main distribution line

  • Include transformers, panels, switches, and cables

  • End with the room light as the final destination

A Project Management Officer was asked 10mo ago
Q. Are you able to create BOQ sheets?
Ans. 

Yes, I can create Bill of Quantities (BOQ) sheets for project management, ensuring accuracy and clarity.

  • BOQ sheets detail quantities and costs of materials needed for a project.

  • I use software like Excel or specialized BOQ tools for efficiency.

  • For example, in a construction project, I would list items like concrete, steel, and labor with their respective quantities and costs.

  • I ensure that the BOQ aligns with projec...

A Project Management Officer was asked 10mo ago
Q. Type of transformer oil, type of efficient transformer
Ans. 

Transformer oil is typically mineral oil, and efficient transformers are usually dry-type transformers.

  • Transformer oil is usually mineral oil, which acts as a coolant and insulator in transformers.

  • Efficient transformers are often dry-type transformers, which do not require oil for cooling.

  • Other types of transformer oils include silicone-based oils and bio-based oils.

  • Efficient transformers may also include amorphou...

A Project Management Officer was asked 10mo ago
Q. Type of Distribution Box
Ans. 

Distribution boxes are used to distribute electrical power to different circuits or devices within a building.

  • Distribution boxes can be categorized based on the number of ways or circuits they can accommodate (e.g. 4-way, 8-way, 12-way)

  • They can also be classified based on the type of protection they offer (e.g. MCB distribution box, RCCB distribution box)

  • Distribution boxes can be surface-mounted or flush-mounted d...

Parekh Integrated Services Project Management Officer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Naukri.com and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - One-on-one 

(13 Questions)

  • Q1. Type of transformer oil, type of efficient transformer
  • Ans. 

    Transformer oil is typically mineral oil, and efficient transformers are usually dry-type transformers.

    • Transformer oil is usually mineral oil, which acts as a coolant and insulator in transformers.

    • Efficient transformers are often dry-type transformers, which do not require oil for cooling.

    • Other types of transformer oils include silicone-based oils and bio-based oils.

    • Efficient transformers may also include amorphous cor...

  • Answered by AI
  • Q2. Draw SLD,from sub station to room light.
  • Ans. 

    SLD (Single Line Diagram) shows the electrical connections from substation to room light.

    • Start with the substation as the power source

    • Draw a line representing the main distribution line

    • Include transformers, panels, switches, and cables

    • End with the room light as the final destination

  • Answered by AI
  • Q3. Type of wireing
  • Ans. 

    The type of wiring used depends on the specific project requirements and regulations.

    • Consider the voltage requirements of the project

    • Choose between solid or stranded wire based on flexibility needs

    • Select the appropriate wire gauge for the current load

    • Follow local electrical codes and regulations

    • Examples: THHN wire for general wiring, Cat6 cable for networking projects

  • Answered by AI
  • Q4. Layers of cable
  • Ans. 

    Layers of cable refer to the different levels of insulation and protection surrounding the core conductor.

    • Layers of cable provide insulation and protection for the core conductor.

    • Common layers include conductor, insulation, shielding, and jacket.

    • Examples of cables with multiple layers include coaxial cables and Ethernet cables.

  • Answered by AI
  • Q5. Type of Distribution Box
  • Ans. 

    Distribution boxes are used to distribute electrical power to different circuits or devices within a building.

    • Distribution boxes can be categorized based on the number of ways or circuits they can accommodate (e.g. 4-way, 8-way, 12-way)

    • They can also be classified based on the type of protection they offer (e.g. MCB distribution box, RCCB distribution box)

    • Distribution boxes can be surface-mounted or flush-mounted depend...

  • Answered by AI
  • Q6. What is SP,TPN,VTPN
  • Ans. 

    SP stands for Schedule Performance, TPN stands for Total Planned Value, VTPN stands for Value of Total Planned Value

    • SP is a measure of how well the project is adhering to the schedule

    • TPN is the total budgeted cost of the work scheduled to be done

    • VTPN is the earned value of the work actually completed

  • Answered by AI
  • Q7. Type of wire flexible.....
  • Ans. 

    The type of wire flexible depends on the material used and the intended application.

    • Different types of flexible wires include silicone wire, PVC wire, and Teflon wire.

    • The flexibility of a wire can be determined by its strand count and gauge.

    • Flexible wires are commonly used in industries like electronics, automotive, and robotics.

  • Answered by AI
  • Q8. Draw Power triangle
  • Ans. 

    The Power triangle is a diagram used in project management to illustrate the relationship between scope, time, and cost.

    • The three sides of the triangle represent scope, time, and cost.

    • The triangle shows that changes in one aspect will affect the other two.

    • For example, increasing the scope of a project will likely lead to an increase in time and cost.

    • Conversely, reducing the time allocated to a project may require a red...

  • Answered by AI
  • Q9. Tell me about your self
  • Ans. 

    Experienced project management professional with a proven track record of successfully leading cross-functional teams to deliver projects on time and within budget.

    • Over 5 years of experience in project management

    • Strong leadership and communication skills

    • Proficient in project management tools such as Microsoft Project and Jira

    • Managed multiple projects simultaneously, including a recent software implementation project fo...

  • Answered by AI
  • Q10. Can make BOQ sheets
  • Ans. 

    Yes, I can create Bill of Quantities (BOQ) sheets for project management, ensuring accuracy and clarity.

    • BOQ sheets detail quantities and costs of materials needed for a project.

    • I use software like Excel or specialized BOQ tools for efficiency.

    • For example, in a construction project, I would list items like concrete, steel, and labor with their respective quantities and costs.

    • I ensure that the BOQ aligns with project spe...

  • Answered by AI
  • Q11. Material used in wire.
  • Ans. 

    Copper is the most commonly used material in wire due to its high conductivity and affordability.

    • Copper is the most common material used in wire due to its high conductivity and affordability

    • Other materials used in wire include aluminum, silver, and gold

    • The choice of material depends on the specific application and requirements

  • Answered by AI
  • Q12. Type of copper in wiring
  • Ans. 

    Copper wiring typically uses copper with high conductivity, such as copper with a purity of 99.9% or higher.

    • Copper wiring commonly uses high-conductivity copper, such as ETP (Electrolytic Tough Pitch) copper.

    • Copper wiring may also use OFHC (Oxygen-Free High Conductivity) copper for applications requiring high purity.

    • Copper wiring with a purity of 99.9% or higher is often preferred for electrical conductivity.

    • Different ...

  • Answered by AI
  • Q13. Salary expectation

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare basic of the field you belong.
Interviewer is good person gove you the answer you don't know.open minded.

Top trending discussions

View All
Interview Tips & Stories
2w
toobluntforu
·
works at
Cvent
Can speak English, can’t deliver in interviews
I feel like I can't speak fluently during interviews. I do know english well and use it daily to communicate, but the moment I'm in an interview, I just get stuck. since it's not my first language, I struggle to express what I actually feel. I know the answer in my head, but I just can’t deliver it properly at that moment. Please guide me
Got a question about Parekh Integrated Services?
Ask anonymously on communities.

Interview questions from similar companies

I applied via Referral and was interviewed before Nov 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. Previous experience and personal profile
  • Q2. What is team management skills
  • Q3. Location preference to handle team
  • Ans. 

    I am flexible with location, valuing team dynamics and productivity over specific geography.

    • I believe in the importance of team cohesion, whether remote or in-person.

    • For example, I have successfully managed teams across different time zones, ensuring effective communication.

    • I am open to relocating if it enhances team collaboration and project success.

    • In my previous role, I led a hybrid team, balancing remote work with ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to prepare mentally and physically to show candidate capability and capacity orally with strong convincing skills where he/ her self can create confidence to the interviewer.

Project Management Officer Interview Questions Asked at Other Companies

asked in GMR Group
Q1. What score would you give yourself for different software in the ... read more
asked in Amdocs
Q2. What is a VBA program that can filter Excel data based on two col ... read more
asked in Amdocs
Q3. Can you provide examples that illustrate the use of DAX in Power ... read more
asked in Olympiados
Q4. A project has a 60% chance of INR PHONE_NUMBER profit and 40% cha ... read more
Q5. Describe your experience leading a team and effectively dealing w ... read more
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Previous project experience
  • Q2. Scrum fundamentals and usage
  • Ans. 

    Scrum is an agile framework used for project management, emphasizing teamwork, accountability, and iterative progress.

    • Scrum involves breaking down projects into smaller tasks called sprints

    • It emphasizes regular communication and collaboration within a cross-functional team

    • Scrum ceremonies include daily stand-up meetings, sprint planning, sprint review, and sprint retrospective

    • Roles in Scrum include Product Owner, Scrum...

  • Answered by AI

Skills evaluated in this interview

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
No response

I applied via Approached by Company and was interviewed in Jun 2024. There were 4 interview rounds.

Round 1 - One-on-one 

(1 Question)

  • Q1. Management-related questions, past experience in detail
Round 2 - One-on-one 

(1 Question)

  • Q1. Agile methodologies, Team Leadership
Round 3 - HR 

(1 Question)

  • Q1. Are you available ? Can we process the offer?
Round 4 - One-on-one 

(1 Question)

  • Q1. General questions regarding my experience

Interview Preparation Tips

Interview preparation tips for other job seekers - After the 4th round, HR ghosted me. They did not respond to my communication further even when I mailed or called for feedback. But, the interviewers were nice and the interviews went great.
Round 1 - One-on-one 

(2 Questions)

  • Q1. Show me the PowerBi Data Relations
  • Ans. 

    PowerBI Data Relations show how tables are related to each other in a data model.

    • Data relations are created by linking columns between tables.

    • One table can have multiple relationships with other tables.

    • Data relations can be one-to-one, one-to-many, or many-to-many.

    • PowerBI automatically detects and creates relationships based on column names.

    • Data relations can be edited and managed in the Relationship view.

  • Answered by AI
  • Q2. Python code issue resolve

Interview Preparation Tips

Interview preparation tips for other job seekers - Strict Interviews. Be sure what you speak. Technically they seek every information. They see What you know ,how you look for problem solving.
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before May 2023. There were 2 interview rounds.

Round 1 - One-on-one 

(1 Question)

  • Q1. Screening round with HR
Round 2 - Case Study 

Digital platform launch

I applied via Approached by Company and was interviewed in Jan 2022. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Experience and expected salary

Interview Preparation Tips

Interview preparation tips for other job seekers - Company HR is not involved in any process
Are these interview questions helpful?
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Normal profile and industry related questions
  • Q2. Normal industry related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - DTDC introduces this kind of new profile every year and closes it in a year. Don't apply for these type of profiles in DTDC

Manager Interview Questions & Answers

DTDC Express user image GHANCHI MAHANMADZUBER

posted on 17 May 2025

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview in Nov 2024, where I was asked the following questions.

  • Q1. What is Your Daily Routine Job & Follow up
  • Ans. 

    My daily routine as a manager involves planning, team coordination, and performance monitoring to ensure project success.

    • Start the day with a team meeting to discuss priorities and address any challenges.

    • Review project timelines and adjust resources as needed to meet deadlines.

    • Conduct one-on-one check-ins with team members to provide support and feedback.

    • Monitor key performance indicators (KPIs) to assess team producti...

  • Answered by AI
  • Q2. What is the Operation challenges
  • Ans. 

    Operational challenges involve inefficiencies, resource management, and process optimization that hinder organizational performance.

    • Inefficient processes: For example, a manufacturing line with frequent breakdowns can delay production schedules.

    • Resource allocation: Mismanagement of staff or equipment can lead to overstaffing in one area while another is understaffed.

    • Supply chain disruptions: Natural disasters or geopol...

  • Answered by AI
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Detailed Product lifecycle
  • Ans. 

    Product lifecycle involves stages from ideation to retirement of a product.

    • Idea generation

    • Product development

    • Market launch

    • Growth phase

    • Maturity phase

    • Decline phase

    • Product retirement

  • Answered by AI
  • Q2. Overview of product management

Parekh Integrated Services Interview FAQs

How many rounds are there in Parekh Integrated Services Project Management Officer interview?
Parekh Integrated Services interview process usually has 1 rounds. The most common rounds in the Parekh Integrated Services interview process are One-on-one Round.
What are the top questions asked in Parekh Integrated Services Project Management Officer interview?

Some of the top questions asked at the Parekh Integrated Services Project Management Officer interview -

  1. Type of transformer oil, type of efficient transfor...read more
  2. Draw SLD,from sub station to room lig...read more
  3. What is SP,TPN,V...read more

Tell us how to improve this page.

Overall Interview Experience Rating

4/5

based on 1 interview experience

Difficulty level

Moderate 100%

Duration

Less than 2 weeks 100%
View more

Interview Questions from Similar Companies

ElasticRun Interview Questions
3.5
 • 259 Interviews
DTDC Express Interview Questions
3.7
 • 167 Interviews
Safexpress Interview Questions
4.0
 • 115 Interviews
FedEx Express Interview Questions
3.9
 • 101 Interviews
GATI-KWE Interview Questions
3.9
 • 92 Interviews
Ups Logistics Interview Questions
3.6
 • 77 Interviews
DHL Express Interview Questions
4.0
 • 73 Interviews
View all
Operations Executive
167 salaries
unlock blur

₹1.5 L/yr - ₹4 L/yr

Executive
96 salaries
unlock blur

₹1.7 L/yr - ₹4.2 L/yr

Executive Accountant
95 salaries
unlock blur

₹2 L/yr - ₹4.2 L/yr

Warehouse Executive
93 salaries
unlock blur

₹1.6 L/yr - ₹4.1 L/yr

Assistant Manager
90 salaries
unlock blur

₹3.6 L/yr - ₹9.6 L/yr

Explore more salaries
Compare Parekh Integrated Services with

DTDC Express

3.7
Compare

ElasticRun

3.5
Compare

GATI-KWE

3.9
Compare

Safexpress

4.0
Compare
write
Share an Interview