Filter interviews by
I applied via Recruitment Consultant and was interviewed in Dec 2020. There were 4 interview rounds.
Managing people for good output requires effective communication, clear expectations, and recognition of achievements.
Establish clear goals and expectations
Provide regular feedback and constructive criticism
Encourage open communication and collaboration
Recognize and reward achievements
Provide opportunities for growth and development
Lead by example and maintain a positive attitude
Induction furnace uses electromagnetic induction to heat and melt metal.
A coil of copper wire is wrapped around the furnace chamber.
An alternating current is passed through the coil, creating a magnetic field.
The magnetic field induces eddy currents in the metal, causing it to heat up and melt.
Induction furnaces are commonly used in foundries for melting and casting metals.
They are more energy-efficient and faster than...
Good metal output per shift depends on efficient production processes, skilled workers, and proper maintenance of equipment.
Efficient production processes can increase metal output per shift
Skilled workers can identify and resolve production issues quickly
Proper maintenance of equipment can prevent breakdowns and downtime
Regular monitoring of production metrics can help identify areas for improvement
Investing in new te...
Monthly average KWH per ton is a measure of energy efficiency in production.
Monthly average KWH per ton is calculated by dividing the total KWH consumed in a month by the total production output in tons.
It is a measure of energy efficiency in production and can be used to identify areas for improvement.
For example, if the monthly average KWH per ton is higher than the industry standard, it may indicate that the product...
I applied via Recruitment Consultant and was interviewed in Mar 2021. There was 1 interview round.
Handling shift requires effective time management, communication, and adaptability.
Create a schedule to ensure smooth transition between shifts
Communicate important information to the incoming shift
Delegate tasks and responsibilities clearly
Stay organized and prioritize tasks
Be adaptable and flexible to handle unexpected situations
Maintain good work-life balance to avoid burnout
Adjusting manpower with effective communication is crucial for Sr. production Engineers.
Regularly communicate with team members to understand their workload and availability
Identify areas where additional manpower is needed and communicate this to management
Ensure clear and concise communication of tasks and responsibilities to avoid confusion
Encourage open communication and feedback to address any manpower issues
Utili...
I applied via Walk-in and was interviewed in Jan 2021. There was 1 interview round.
Top trending discussions
I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.
Process engineering involves designing, optimizing, and managing industrial processes to improve efficiency and productivity.
Process engineering focuses on analyzing and improving processes in various industries such as manufacturing, chemical, and pharmaceutical.
It involves identifying bottlenecks, reducing waste, and implementing process improvements to enhance productivity.
Process engineers use tools like process fl...
cp and pp are both commands in Unix-like operating systems, but they have different functionalities.
cp stands for 'copy' and is used to copy files or directories from one location to another.
pp stands for 'print and pause' and is used to print files with pagination, pausing after each page.
cp can be used to create a duplicate of a file or directory, while pp is used for printing files in a controlled manner.
Example: cp...
A control plan is a documented procedure that outlines the steps and measures taken to ensure quality and consistency in a manufacturing process.
Control plans are commonly used in industries such as automotive, aerospace, and electronics.
They include details on the process steps, key characteristics, measurement methods, and acceptable tolerances.
Control plans help identify potential risks, prevent defects, and ensure ...
SMED stands for Single Minute Exchange of Die. It is a lean manufacturing technique used to reduce the time it takes to change over a production process.
SMED is used to minimize downtime during changeovers
It focuses on separating internal and external setup tasks
The goal is to convert as many internal setup tasks to external setup tasks
By reducing setup time, production flexibility and efficiency are improved
Capex stands for capital expenditure, which refers to the funds used by a company to acquire, upgrade, or maintain physical assets.
Capex is an investment made by a company to purchase or improve long-term assets such as buildings, equipment, or technology.
It is different from operational expenses (opex) which are ongoing costs to run the business.
Capex is typically planned and budgeted for in advance.
Examples of capex ...
I applied via Recruitment Consultant and was interviewed in Mar 2021. There were 3 interview rounds.
SAP is an enterprise resource planning software used for managing business operations and customer relations.
SAP stands for Systems, Applications, and Products in Data Processing
It is used by companies to manage their business operations such as finance, sales, procurement, and inventory management
SAP also offers customer relationship management (CRM) software to manage interactions with customers
It is widely used in i...
I use various Tcodes depending on the task at hand.
For material master data maintenance, I use MM01, MM02, and MM03.
For purchase order creation and maintenance, I use ME21N and ME22N.
For inventory management, I use MIGO and MB51.
For production planning, I use MD61 and MD04.
For quality management, I use QA32 and QE51.
For sales and distribution, I use VA01, VA02, and VA03.
To punch production in SAP, follow these steps:
Create a production order in SAP
Release the production order
Confirm the production order
Perform goods receipt for the production order
Perform goods issue for the production order
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
I applied via Referral and was interviewed in Apr 2021. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed before Apr 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Aug 2023. There was 1 interview round.
The question includes topics such as HPDC process calculation, 5S, Kaizen implementation, reducing process rejection, and plan vs actual.
HPDC process calculation involves determining the parameters for high-pressure die casting.
5S is a methodology for workplace organization and standardization.
Kaizen is a continuous improvement approach that focuses on small incremental changes.
To reduce process rejection, one can impl...
based on 4 interview experiences
based on 102 reviews
Rating in categories
Senior Engineer
43
salaries
| ₹2.8 L/yr - ₹5.7 L/yr |
Assistant Manager
22
salaries
| ₹4.2 L/yr - ₹7.6 L/yr |
Quality Engineer
21
salaries
| ₹1.6 L/yr - ₹4.5 L/yr |
Production Supervisor
16
salaries
| ₹1.8 L/yr - ₹4.1 L/yr |
Production Engineer
9
salaries
| ₹2.3 L/yr - ₹3.4 L/yr |
Knorr-Bremse
Sanden Vikas
Greaves Cotton
Victora Auto Private Limited