I applied via Recruitment Consultant and was interviewed in Dec 2020. There were 4 interview rounds.
Managing people for good output requires effective communication, clear expectations, and recognition of achievements.
Establish clear goals and expectations
Provide regular feedback and constructive criticism
Encourage open communication and collaboration
Recognize and reward achievements
Provide opportunities for growth and development
Lead by example and maintain a positive attitude
Induction furnace uses electromagnetic induction to heat and melt metal.
A coil of copper wire is wrapped around the furnace chamber.
An alternating current is passed through the coil, creating a magnetic field.
The magnetic field induces eddy currents in the metal, causing it to heat up and melt.
Induction furnaces are commonly used in foundries for melting and casting metals.
They are more energy-efficient and faster than
Good metal output per shift depends on efficient production processes, skilled workers, and proper maintenance of equipment.
Efficient production processes can increase metal output per shift
Skilled workers can identify and resolve production issues quickly
Proper maintenance of equipment can prevent breakdowns and downtime
Regular monitoring of production metrics can help identify areas for improvement
Investing in new te...
Monthly average KWH per ton is a measure of energy efficiency in production.
Monthly average KWH per ton is calculated by dividing the total KWH consumed in a month by the total production output in tons.
It is a measure of energy efficiency in production and can be used to identify areas for improvement.
For example, if the monthly average KWH per ton is higher than the industry standard, it may indicate that the product...
I applied via Recruitment Consultant and was interviewed in Mar 2021. There was 1 interview round.
Handling shift requires effective time management, communication, and adaptability.
Create a schedule to ensure smooth transition between shifts
Communicate important information to the incoming shift
Delegate tasks and responsibilities clearly
Stay organized and prioritize tasks
Be adaptable and flexible to handle unexpected situations
Maintain good work-life balance to avoid burnout
Adjusting manpower with effective communication is crucial for Sr. production Engineers.
Regularly communicate with team members to understand their workload and availability
Identify areas where additional manpower is needed and communicate this to management
Ensure clear and concise communication of tasks and responsibilities to avoid confusion
Encourage open communication and feedback to address any manpower issues
Utili...
I applied via Walk-in and was interviewed in Jan 2021. There was 1 interview round.
Top trending discussions
I applied via Recruitment Consulltant and was interviewed before Apr 2021. There were 3 interview rounds.
posted on 15 Oct 2023
I applied via Recruitment Consulltant and was interviewed in Jun 2023. There were 7 interview rounds.
Share knowledge about past experience
Written test, reasoning, mathematics and coding test
posted on 7 Aug 2024
I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.
There are vav based questions and answers
I applied via Naukri.com and was interviewed in Aug 2023. There was 1 interview round.
The question includes topics such as HPDC process calculation, 5S, Kaizen implementation, reducing process rejection, and plan vs actual.
HPDC process calculation involves determining the parameters for high-pressure die casting.
5S is a methodology for workplace organization and standardization.
Kaizen is a continuous improvement approach that focuses on small incremental changes.
To reduce process rejection, one can impl...
I applied via Company Website and was interviewed before Oct 2022. There were 4 interview rounds.
It was a easy round asked apti only
It was Easy-medium type round
posted on 8 May 2024
I applied via Walk-in and was interviewed in Nov 2023. There were 2 interview rounds.
VA is value analysis, while VE is value engineering. Both are cost-saving techniques used in product development.
VA is a systematic review of a product's components and functions to identify areas where cost can be reduced without affecting performance.
VE is a more comprehensive approach that involves rethinking the entire product design to achieve cost savings while improving performance.
VA is typically used in the ea...
The cost of plastic molding components can be calculated by considering factors such as material cost, tooling cost, labor cost, and overhead cost.
Determine the material cost per unit of the component
Calculate the tooling cost, which includes the cost of the mold and any necessary equipment
Factor in the labor cost, which includes the cost of operating the molding machine and any necessary labor for finishing and assemb...
Polymers are large molecules made up of repeating units called monomers. They have a wide range of applications in various fields.
Polyethylene
Polypropylene
Polyvinyl chloride
Polystyrene
Polyester
Polyurethane
Nylon
Teflon
Silicone
Rubber
based on 4 interviews
Interview experience
based on 95 reviews
Rating in categories
Senior Engineer
40
salaries
| ₹2.8 L/yr - ₹5.5 L/yr |
Quality Engineer
22
salaries
| ₹1.6 L/yr - ₹4.5 L/yr |
Assistant Manager
18
salaries
| ₹4 L/yr - ₹7.2 L/yr |
Production Supervisor
16
salaries
| ₹1.8 L/yr - ₹4.1 L/yr |
Maintenance Engineer
9
salaries
| ₹3 L/yr - ₹5.1 L/yr |
Knorr-Bremse
Greaves Cotton
Sanden Vikas
Victora Auto Private Limited