Upload Button Icon Add office photos

Filter interviews by

Paranjape Autocast Interview Questions, Process, and Tips

Updated 4 Apr 2021

Top Paranjape Autocast Interview Questions and Answers

View all 6 questions

Paranjape Autocast Interview Experiences

Popular Designations

3 interviews found

I applied via Recruitment Consultant and was interviewed in Dec 2020. There were 4 interview rounds.

Interview Questionnaire 

8 Questions

  • Q1. About my past company work & my responsibilities
  • Q2. How to manage people for good output
  • Ans. 

    Managing people for good output requires effective communication, clear expectations, and recognition of achievements.

    • Establish clear goals and expectations

    • Provide regular feedback and constructive criticism

    • Encourage open communication and collaboration

    • Recognize and reward achievements

    • Provide opportunities for growth and development

    • Lead by example and maintain a positive attitude

  • Answered by AI
  • Q3. How induction furnace work
  • Ans. 

    Induction furnace uses electromagnetic induction to heat and melt metal.

    • A coil of copper wire is wrapped around the furnace chamber.

    • An alternating current is passed through the coil, creating a magnetic field.

    • The magnetic field induces eddy currents in the metal, causing it to heat up and melt.

    • Induction furnaces are commonly used in foundries for melting and casting metals.

    • They are more energy-efficient and faster than

  • Answered by AI
  • Q4. About sand parameters
  • Q5. Including moulding & pouring process
  • Q6. Good metal output per shift
  • Ans. 

    Good metal output per shift depends on efficient production processes, skilled workers, and proper maintenance of equipment.

    • Efficient production processes can increase metal output per shift

    • Skilled workers can identify and resolve production issues quickly

    • Proper maintenance of equipment can prevent breakdowns and downtime

    • Regular monitoring of production metrics can help identify areas for improvement

    • Investing in new te...

  • Answered by AI
  • Q7. Monthly average KWH / ton?
  • Ans. 

    Monthly average KWH per ton is a measure of energy efficiency in production.

    • Monthly average KWH per ton is calculated by dividing the total KWH consumed in a month by the total production output in tons.

    • It is a measure of energy efficiency in production and can be used to identify areas for improvement.

    • For example, if the monthly average KWH per ton is higher than the industry standard, it may indicate that the product...

  • Answered by AI
  • Q8. Also about my communication skill

Production Engineer Interview Questions asked at other Companies

Q1. How to solve the problem in robot means how to detect fault?
View answer (9)

I applied via Recruitment Consultant and was interviewed in Mar 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. How to handel shift...?
  • Ans. 

    Handling shift requires effective time management, communication, and adaptability.

    • Create a schedule to ensure smooth transition between shifts

    • Communicate important information to the incoming shift

    • Delegate tasks and responsibilities clearly

    • Stay organized and prioritize tasks

    • Be adaptable and flexible to handle unexpected situations

    • Maintain good work-life balance to avoid burnout

  • Answered by AI
  • Q2. Adjust manpower with communication...
  • Ans. 

    Adjusting manpower with effective communication is crucial for Sr. production Engineers.

    • Regularly communicate with team members to understand their workload and availability

    • Identify areas where additional manpower is needed and communicate this to management

    • Ensure clear and concise communication of tasks and responsibilities to avoid confusion

    • Encourage open communication and feedback to address any manpower issues

    • Utili...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Knowledge is power....

Senior Production Engineer Interview Questions asked at other Companies

Q1. What are different IS codes follow to fabricate open web girders?
View answer (1)

I applied via Walk-in and was interviewed in Jan 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Allen key number?
  • Q2. Spanner number?

Interview Preparation Tips

Interview preparation tips for other job seekers - Study your field thoroughly

Maintenance Engineer Interview Questions asked at other Companies

Q1. 1)which refrigeration cycle used in chilling plant?
View answer (9)

Interview questions from similar companies

I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. What's process engineering works
  • Ans. 

    Process engineering involves designing, optimizing, and managing industrial processes to improve efficiency and productivity.

    • Process engineering focuses on analyzing and improving processes in various industries such as manufacturing, chemical, and pharmaceutical.

    • It involves identifying bottlenecks, reducing waste, and implementing process improvements to enhance productivity.

    • Process engineers use tools like process fl...

  • Answered by AI
  • Q2. What's the difference between cp and pp
  • Ans. 

    cp and pp are both commands in Unix-like operating systems, but they have different functionalities.

    • cp stands for 'copy' and is used to copy files or directories from one location to another.

    • pp stands for 'print and pause' and is used to print files with pagination, pausing after each page.

    • cp can be used to create a duplicate of a file or directory, while pp is used for printing files in a controlled manner.

    • Example: cp...

  • Answered by AI
  • Q3. What's control plan
  • Ans. 

    A control plan is a documented procedure that outlines the steps and measures taken to ensure quality and consistency in a manufacturing process.

    • Control plans are commonly used in industries such as automotive, aerospace, and electronics.

    • They include details on the process steps, key characteristics, measurement methods, and acceptable tolerances.

    • Control plans help identify potential risks, prevent defects, and ensure ...

  • Answered by AI
  • Q4. What's smed
  • Ans. 

    SMED stands for Single Minute Exchange of Die. It is a lean manufacturing technique used to reduce the time it takes to change over a production process.

    • SMED is used to minimize downtime during changeovers

    • It focuses on separating internal and external setup tasks

    • The goal is to convert as many internal setup tasks to external setup tasks

    • By reducing setup time, production flexibility and efficiency are improved

  • Answered by AI
  • Q5. What's capex
  • Ans. 

    Capex stands for capital expenditure, which refers to the funds used by a company to acquire, upgrade, or maintain physical assets.

    • Capex is an investment made by a company to purchase or improve long-term assets such as buildings, equipment, or technology.

    • It is different from operational expenses (opex) which are ongoing costs to run the business.

    • Capex is typically planned and budgeted for in advance.

    • Examples of capex ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared as per your resume shared.

Skills evaluated in this interview

I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. General questions from my experince Background.

I applied via Recruitment Consulltant and was interviewed before Apr 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(7 Questions)

  • Q1. What are your salary expectations?
  • Q2. What is your family background?
  • Q3. Share details of your previous job.
  • Q4. Why should we hire you?
  • Q5. Why are you looking for a change?
  • Q6. What are your strengths and weaknesses?
  • Q7. Tell me about yourself.
Round 3 - Technical 

(2 Questions)

  • Q1. As per your current profile
  • Q2. Japanise Methodology like 4 M change, 5 S, IATF, OSASH, Safety, TPM, etc.

Interview Preparation Tips

Interview preparation tips for other job seekers - know about FCC clutch india pvt. ltd, study about your resume well,
salary no bar for good condidate,
answer all questions honesty because they are collect all information from your given details.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jun 2023. There were 7 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Group Discussion 

Share knowledge about past experience

Round 3 - Aptitude Test 

Written test, reasoning, mathematics and coding test

Round 4 - Technical 

(2 Questions)

  • Q1. Technical questions about motor , electrical knowledge and electrical circuit basic or knowledge about course
  • Q2. Different type motor and definition or electrical power knowledge
Round 5 - Programmable logic controller 

(1 Question)

  • Q1. PLC logic create and discuss knowledge about PLC only
Round 6 - Plant hard discussion 

(1 Question)

  • Q1. Discussed about self and i share my past experience
Round 7 - HR 

(1 Question)

  • Q1. Salary discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - Before interview, prepare and read the concept about your field.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - Aptitude Test 

There are vav based questions and answers

Interview Preparation Tips

Interview preparation tips for other job seekers - Focus on JD.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. 1)HPDC process calculation. 2)What is 5S . 3)Kaizen implementation 4) How to reduce process Rejection 5) Plan Vs Actual 6)
  • Ans. 

    The question includes topics such as HPDC process calculation, 5S, Kaizen implementation, reducing process rejection, and plan vs actual.

    • HPDC process calculation involves determining the parameters for high-pressure die casting.

    • 5S is a methodology for workplace organization and standardization.

    • Kaizen is a continuous improvement approach that focuses on small incremental changes.

    • To reduce process rejection, one can impl...

  • Answered by AI
  • Q2. 1)Non fill check water leakage 2) metal temp
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview in Sep 2024, where I was asked the following questions.

  • Q1. Related logistics
  • Q2. Production planning
  • Q3. Import export related

Paranjape Autocast Interview FAQs

How to prepare for Paranjape Autocast interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Paranjape Autocast. The most common topics and skills that interviewers at Paranjape Autocast expect are Apqp, Manufacturing, OEM, PPAP and Projects Management.
What are the top questions asked in Paranjape Autocast interview?

Some of the top questions asked at the Paranjape Autocast interview -

  1. How to manage people for good outp...read more
  2. How induction furnace wo...read more
  3. How to handel shift....read more

Tell us how to improve this page.

Paranjape Autocast Interview Process

based on 4 interviews

Interview experience

2.8
  
Poor
View more

Interview Questions from Similar Companies

Knorr-Bremse Interview Questions
3.9
 • 56 Interviews
Goodyear Interview Questions
3.6
 • 55 Interviews
Sanden Vikas Interview Questions
4.0
 • 45 Interviews
FCC Clutch Interview Questions
4.0
 • 36 Interviews
Shivam Autotech Interview Questions
3.6
 • 30 Interviews
View all

Paranjape Autocast Reviews and Ratings

based on 95 reviews

3.8/5

Rating in categories

3.8

Skill development

3.6

Work-life balance

3.2

Salary

3.5

Job security

3.5

Company culture

3.3

Promotions

3.4

Work satisfaction

Explore 95 Reviews and Ratings
Senior Engineer
42 salaries
unlock blur

₹2.8 L/yr - ₹5.7 L/yr

Quality Engineer
22 salaries
unlock blur

₹1.6 L/yr - ₹4.5 L/yr

Assistant Manager
19 salaries
unlock blur

₹4.2 L/yr - ₹7.2 L/yr

Production Supervisor
16 salaries
unlock blur

₹1.8 L/yr - ₹4.1 L/yr

Maintenance Engineer
9 salaries
unlock blur

₹3 L/yr - ₹5.1 L/yr

Explore more salaries
Compare Paranjape Autocast with

Knorr-Bremse

3.9
Compare

Greaves Cotton

4.1
Compare

Sanden Vikas

4.0
Compare

Victora Auto Private Limited

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview