I applied via Company Website and was interviewed in Aug 2024. There was 1 interview round.
A solar inverter is a device that converts the DC electricity generated by solar panels into AC electricity for use in homes and businesses.
Converts DC electricity from solar panels to AC electricity
Allows for use of solar energy in homes and businesses
Helps manage and optimize solar power production
Examples: SMA Solar Inverters, Enphase Microinverters
Maintenance ensures equipment, machinery, or systems are kept in good working condition to prevent breakdowns and ensure optimal performance.
Prevent breakdowns and extend equipment lifespan
Ensure optimal performance and efficiency
Reduce safety risks and downtime
Save costs in the long run by avoiding major repairs or replacements
Protection of power transformer involves implementing measures to prevent damage or failure of the transformer due to various factors.
Protection relays are used to detect abnormal conditions and isolate the transformer from the system.
Overcurrent protection is used to prevent damage from excessive current flow.
Differential protection compares the current entering and leaving the transformer to detect internal faults.
Te...
Relays are devices that act as switches to control electrical circuits. They come in various types with different functions.
Electromechanical relays: use electromagnets to mechanically operate the switch
Solid-state relays: use semiconductor devices to switch the circuit on and off
Time delay relays: introduce a time delay before switching the circuit
Overload relays: protect electrical circuits from overloads by disconne...
Transformer testing includes routine tests, type tests, and special tests to ensure proper functioning and safety.
Routine tests: include insulation resistance, turns ratio, winding resistance, and polarity tests.
Type tests: include temperature rise, short-circuit withstand, impulse voltage, and dielectric tests.
Special tests: include noise level, partial discharge, and harmonics tests.
Testing is crucial to ensure trans...
Top trending discussions
I applied via Company Website and was interviewed before May 2021. There was 1 interview round.
Impedance is the measure of opposition to the flow of electric current in a circuit. DGR fundamental refers to the Dielectric Withstand Voltage test.
Impedance is measured in ohms and is the combination of resistance, capacitance, and inductance in a circuit.
DGR fundamental is a test to determine the maximum voltage a material can withstand without breaking down.
Basics of impedance include understanding the relationship...
A substation in charge is responsible for the safe and efficient operation of an electrical substation.
Overseeing the maintenance and repair of equipment
Ensuring compliance with safety regulations
Managing a team of technicians and operators
Monitoring power flow and voltage levels
Troubleshooting and resolving issues
Coordinating with other departments and utilities
Preparing reports and documentation
I applied via Referral and was interviewed before Jul 2021. There was 1 interview round.
A transformer is an electrical device that transfers electrical energy from one circuit to another through electromagnetic induction.
Transformers work on the principle of electromagnetic induction
They have two coils, primary and secondary, wound around a common magnetic core
When an alternating current flows through the primary coil, it creates a magnetic field which induces a voltage in the secondary coil
The voltage in...
I applied via Walk-in and was interviewed in Jun 2022. There were 3 interview rounds.
CT and PT are electrical transformers used in power systems to measure current and voltage respectively.
CT stands for Current Transformer and is used to measure high currents in power systems.
PT stands for Potential Transformer and is used to measure high voltages in power systems.
CTs are connected in series with the load while PTs are connected in parallel with the load.
CTs are used to measure current for protection a...
I appeared for an interview in Sep 2024, where I was asked the following questions.
I applied via Walk-in and was interviewed before Jan 2022. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Oct 2021. There were 2 interview rounds.
The duration of Param Renewable Energy interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 1 interview
Interview experience
based on 149 reviews
Rating in categories
Engineer
67
salaries
| ₹2.3 L/yr - ₹5.1 L/yr |
Senior Engineer
44
salaries
| ₹3.6 L/yr - ₹7.9 L/yr |
Electrical Engineer
34
salaries
| ₹2.4 L/yr - ₹5 L/yr |
Junior Engineer
30
salaries
| ₹2.1 L/yr - ₹5.2 L/yr |
Technician
20
salaries
| ₹1.8 L/yr - ₹3.5 L/yr |
Suzlon Group
Adani Power
Adani Group
NTPC