Filter interviews by
I appeared for an interview in Feb 2025.
ERP processes with the VP of Accounts streamline financial operations and enhance decision-making through integrated data management.
Collaboration: The VP of Accounts works with IT to ensure ERP aligns with financial goals.
Data Integration: ERP systems consolidate financial data from various departments for accurate reporting.
Real-time Reporting: Enables the VP to access up-to-date financial metrics for informed decisi...
I appeared for an interview in Feb 2025, where I was asked the following questions.
ASTM/ASME material codes define standards for materials used in engineering and construction, ensuring quality and safety.
ASTM stands for American Society for Testing and Materials, focusing on material specifications.
ASME stands for American Society of Mechanical Engineers, emphasizing design and construction standards.
Examples of ASTM codes include ASTM A36 for carbon structural steel and ASTM A992 for steel wide-fla...
Implementing cost-effective strategies in piping engineering can significantly reduce project expenses while maintaining quality and safety.
Conduct thorough project planning to identify potential cost-saving opportunities early.
Utilize advanced software for design and simulation to optimize material usage and reduce waste.
Select cost-effective materials that meet project specifications without compromising quality.
Impl...
I prioritize tasks, set clear goals, and use tools to manage my time effectively for optimal project delivery.
Use project management software (e.g., MS Project) to outline tasks and deadlines.
Break down larger projects into weekly and daily goals for better focus.
Schedule regular check-ins with the team to assess progress and adjust plans.
Allocate time for unexpected issues, ensuring flexibility in the schedule.
Review ...
I approach problems systematically, using analysis, collaboration, and proactive solutions to ensure effective resolution.
Identify the root cause: For example, if a pipe is leaking, I investigate the material and installation methods used.
Gather a team: I consult with colleagues from different disciplines to gain diverse perspectives on the issue.
Develop a plan: I create a step-by-step approach to address the problem, ...
I applied via Walk-in and was interviewed in Jan 2024. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Nov 2022. There were 3 interview rounds.
Heat exchanger and pressure vessel are mechanical equipment used in various industries for heat transfer and pressure containment.
Heat exchanger is a device used to transfer heat between two or more fluids of different temperatures.
Pressure vessel is a container designed to hold gases or liquids at a pressure substantially different from the ambient pressure.
The function of heat exchanger is to transfer heat from one f...
Oswal Infrastructure interview questions for popular designations
I applied via Recruitment Consulltant and was interviewed in Apr 2023. There were 2 interview rounds.
I applied via Indeed and was interviewed in Sep 2022. There were 3 interview rounds.
All types dc related questions
I applied via Approached by Company and was interviewed before Aug 2021. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Nov 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Oct 2021. There were 3 interview rounds.
They do it by testing, controlling, and auditing the production process as well as training staff on quality procedures & inspection of quality.Can you describe how you investigate production flaws? ...
Can you describe a recent project in which you successfully implemented quality control procedures?
GD is described a situation an where you want to handle it encourages production planning an take action confidential .
I applied via Naukri.com and was interviewed before Jun 2021. There were 2 interview rounds.
Top trending discussions
Some of the top questions asked at the Oswal Infrastructure interview for experienced candidates -
The duration of Oswal Infrastructure interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 4 interviews
Interview experience
based on 98 reviews
Rating in categories
Piping Engineer
10
salaries
| ₹4.1 L/yr - ₹7.6 L/yr |
QA QC Engineer
8
salaries
| ₹3 L/yr - ₹6.7 L/yr |
Graduate Engineer Trainee (Get)
8
salaries
| ₹2 L/yr - ₹3 L/yr |
Production Engineer
7
salaries
| ₹3.2 L/yr - ₹6.6 L/yr |
Senior Planning Engineer
7
salaries
| ₹5.3 L/yr - ₹8 L/yr |
JLL
CBRE
NoBroker
Sobha