Filter interviews by
I applied via India job and was interviewed in Jun 2024. There were 2 interview rounds.
MCV is a measure of the average size of red blood cells. To test a short in a wire, use a multimeter. Phase and neutral are different types of electrical connections.
MCV stands for Mean Corpuscular Volume and is a measure of the average size of red blood cells.
To test a short in a wire, use a multimeter to check for continuity or resistance.
Phase refers to the live wire that carries the electrical current, while neutra...
Top trending discussions
posted on 12 Jul 2016
I applied via Campus Placement
The question is about finding the minimum steps to reach from a source string to a destination string using three operations.
BFS and DFS are graph traversal techniques that can be used to solve this problem.
BFS is typically used when finding the shortest path or exploring all possible paths in a graph.
DFS is useful when searching for a specific path or exploring deeply into a graph.
In this case, BFS can be used to find...
posted on 14 Jul 2017
posted on 9 Feb 2023
They conduct a technical coding test
I applied via Instahyre and was interviewed before Oct 2021. There were 2 interview rounds.
I applied via LinkedIn and was interviewed in Oct 2023. There were 4 interview rounds.
Nirmal question asked in exam.
Basic topic of GD, sinariob base topic
I applied via Recruitment Consulltant and was interviewed before Jan 2024. There was 1 interview round.
I applied via LinkedIn and was interviewed in May 2024. There was 1 interview round.
Experienced business analyst with a background in data analysis and process improvement.
Over 5 years of experience in analyzing business processes and identifying areas for improvement
Skilled in data analysis tools such as Excel, SQL, and Tableau
Strong communication and problem-solving skills
Led a project to streamline inventory management processes, resulting in a 20% reduction in costs
I was interviewed before Feb 2024.
The seven quality control tools are essential for process improvement and problem-solving in engineering.
Check sheet: Used to collect and analyze data in a systematic way, such as tracking defects in a manufacturing process.
Pareto chart: Helps identify the most significant factors contributing to a problem by displaying them in descending order of frequency or impact.
Cause-and-effect diagram (Fishbone diagram): Visuali...
Autonomous maintenance is a key pillar of Total Productive Maintenance (TPM) and involves seven steps to empower operators to take care of their equipment.
Step 1: Initial Cleaning - Operators clean the equipment and surrounding area to identify abnormalities.
Step 2: Eliminate Sources of Contamination - Remove dirt, dust, and debris that can lead to breakdowns.
Step 3: General Inspection - Operators visually inspect the ...
OEE calculations involve Availability, Performance, and Quality factors to measure equipment efficiency.
Calculate Availability by dividing Operating Time by Planned Production Time.
Calculate Performance by dividing Actual Production by Maximum Possible Production.
Calculate Quality by dividing Good Units Produced by Total Units Started.
Implementing lean practices is mandatory for organizations to improve efficiency, reduce waste, and increase productivity.
Lean practices help organizations identify and eliminate waste in processes, leading to cost savings and improved efficiency.
By implementing lean practices, organizations can improve quality control and reduce defects in products or services.
Lean practices promote continuous improvement and empower ...
Downstream team members can be motivated through recognition, clear communication, opportunities for growth, and fostering a positive work environment.
Provide recognition for their hard work and achievements
Communicate clearly about goals, expectations, and feedback
Offer opportunities for growth and development, such as training or mentorship programs
Create a positive work environment through team-building activities a
Pareto analysis is a technique used to identify the most important factors contributing to a problem or situation.
Pareto analysis is based on the Pareto Principle, also known as the 80/20 rule, which states that roughly 80% of effects come from 20% of causes.
It involves identifying and prioritizing the factors that have the most significant impact on a particular outcome.
By focusing on addressing the most critical fact...
A Gemba walk is a Lean management technique where managers go to the actual workplace to observe operations and engage with employees.
Gemba walks involve observing processes, asking questions, and identifying opportunities for improvement.
Managers should focus on understanding the work being done and the challenges faced by employees.
Gemba walks help in building relationships with employees and fostering a culture of c...
Steps involved in performing safety risk assessments
Identify hazards and potential risks
Assess the likelihood and severity of each risk
Implement control measures to mitigate risks
Monitor and review the effectiveness of control measures
Document findings and recommendations
Communicate risks to relevant stakeholders
TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM focuses on preventing equipment breakdowns through regular maintenance and employee involvement.
It involves autonomous maintenance, planned maintenance, and focused improvement activities.
TPM aims to improve overall equipment effectiveness (OEE) by reducing downtime, improving quality, and ...
based on 1 interview
Interview experience
based on 9 reviews
Rating in categories
Electronics Engineer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Technician
3
salaries
| ₹0 L/yr - ₹0 L/yr |
Namaste India Foods
Bhagwati Products
Recipharm Pharmaservices
Patil Group