Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Nyati Group Team. If you also belong to the team, you can get access from here

Nyati Group Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Nyati Group Senior Project Manager Interview Questions and Answers for Experienced

Updated 27 Jan 2023

Nyati Group Senior Project Manager Interview Experiences for Experienced

1 interview found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. What is FDD field dry density test
  • Ans. 

    FDD field dry density test is a method to determine the density of soil in the field.

    • FDD stands for Field Dry Density.

    • It is a test conducted on soil to measure its density.

    • The test involves extracting a soil sample from the field and determining its dry weight and volume.

    • The dry density is calculated by dividing the dry weight of the soil sample by its volume.

    • This test helps in assessing the compaction and quality of s

  • Answered by AI
  • Q2. FDD is field dry density test of soil
  • Q3. How much slump in column concreting
  • Ans. 

    The slump in column concreting should be between 150-175 mm.

    • The slump should be measured before pouring the concrete.

    • The slump should be consistent throughout the column.

    • The slump should not exceed 175 mm to avoid segregation.

    • The slump should not be less than 150 mm to ensure proper compaction.

    • The slump can be adjusted by adding water or admixtures.

    • The slump test should be performed according to ASTM standards.

  • Answered by AI
  • Q4. Slump in column concreting 90 to 100 mm
  • Ans. 

    Slump in column concreting 90 to 100 mm

    • Slump refers to the consistency of the concrete mix

    • A slump of 90 to 100 mm indicates a very wet and unstable mix

    • This can lead to issues with the structural integrity of the column

    • Possible causes include incorrect water-cement ratio or improper mixing

    • Solutions may include adjusting the mix proportions or using additives to improve stability

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Fast track work challenging projects our mission sussesfully complete project whith in safety, quality, cost, time parameters

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Referral and was interviewed in Oct 2023. There was 1 interview round.

Round 1 - Group Discussion 

Development of infrastructure

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. DDUGJY Project;- 33/11 KV New PSS ,33 KV Line ,11 KV Line and LT Line
  • Ans. Rerea of New PSS 60*40 mtr control room 1700 sqft road 60 mtr width 3.75 mtr footpath 15 mtr , fencing 40 mtr cable trench 130 mtr , 2 no 5 MVA PTR, 800Amp VCB and 800 Amp rating isolator in switch yards area. cost of civil work by sub cotractor 1.15 cr and electrical work 9.85 lac.
  • Answered Anonymously
  • Q2. RGGVY 12th Plan , HVDS Project, and Segrigation
  • Q3. ADB Project 33/11 KV New PSS R&M 33&11 KV line LT Line
Round 3 - HR 

(1 Question)

  • Q1. Final negotiation of salary

Interview Preparation Tips

Interview preparation tips for other job seekers - Please consider as per work profile in electrical feild
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Selected Selected

I applied via Recruitment Consulltant

Round 1 - Assignment 

Project Management , Production Management and HSE

Round 2 - HR 

(1 Question)

  • Q1. Very understanding and initiate. Motivated HR Department
Round 3 - Case Study 

Deeply interested in RR PACKAGE

Round 4 - Group Discussion 

Well. We used to do everyday

Interview Preparation Tips

Interview preparation tips for other job seekers - Thakur Sir, ♥️ has recommended for this job. I did my best to GREPL. If he allows will do more in this regard.

I applied via Approached by Company and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - One-on-one 

(1 Question)

  • Q1. Walk through of my daily work
Round 2 - HR 

(1 Question)

  • Q1. Compensation discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - Stay true to what you know and focus displaying your process accumen

I applied via Naukri.com and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(4 Questions)

  • Q1. What are your salary expectations?
  • Q2. Share details of your previous job.
  • Q3. Why are you looking for a change?
  • Q4. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - JUST BE CONFIDENT THEY ARE LOOKING FOR CANDIDATE WHO HAVE GOOD DECISION MAKING POWER.

I was interviewed before May 2021.

Round 1 - Aptitude Test 

Basic engineering questions

Round 2 - One-on-one 

(1 Question)

  • Q1. Automobile engineering ,practical questions on automobile products of tata

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview starts from basic introduction and then automobile concepts about alignment ,transmission ,differential ,company product knowledge

Interview Questionnaire 

2 Questions

Online test was conducted by third party

  • Q1. General Questions about work proflie
  • Q2. Notice period, reason for change

Interview Preparation Tips

Interview preparation tips for other job seekers - Be calm while giving answers, only the first few minutes are important to make an impression.

I applied via Referral and was interviewed before Oct 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What are the steps you’d consider for planning physical security of a premise in general and data Center in particular?
  • Ans. 

    Steps for planning physical security of a premise and data center

    • Conduct a risk assessment to identify potential threats and vulnerabilities

    • Develop a security plan based on the assessment

    • Implement access controls, such as biometric scanners and security cameras

    • Ensure proper environmental controls, such as fire suppression systems and temperature monitoring

    • Train employees on security protocols and conduct regular drills

    • ...

  • Answered by AI
  • Q2. Given an option to choose between process and people, which one would you choose and why?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be honest and sincere. Give genuine answers. Think out of the box.

Senior Manager Interview Questions & Answers

Adani Group user image Abheejit Vishwasrao Khabale-Patil

posted on 31 Jul 2023

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jan 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Person info, working job info, and discussion about interest as per their requirements
Round 3 - Technical 

(1 Question)

  • Q1. Completed projects and nature of duties up-to date. Engineering knowledge check, case study discussion, interest about their requirements, knowledge sharing about colleagues worked in any past project.
Round 4 - HR 

(1 Question)

  • Q1. CTC and formalities

Interview Preparation Tips

Interview preparation tips for other job seekers - Be well prepared about your past projects, engineering, knowledge, coordination and interpersonal skill, professionalism must

Nyati Group Interview FAQs

How many rounds are there in Nyati Group Senior Project Manager interview for experienced candidates?
Nyati Group interview process for experienced candidates usually has 2 rounds. The most common rounds in the Nyati Group interview process for experienced candidates are Resume Shortlist and Technical.
What are the top questions asked in Nyati Group Senior Project Manager interview for experienced candidates?

Some of the top questions asked at the Nyati Group Senior Project Manager interview for experienced candidates -

  1. What is FDD field dry density t...read more
  2. How much slump in column concret...read more
  3. Slump in column concreting 90 to 100...read more

Tell us how to improve this page.

Nyati Group Senior Project Manager Interview Process for Experienced

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Tata Group Interview Questions
4.2
 • 358 Interviews
Adani Group Interview Questions
3.9
 • 187 Interviews
Knight Frank Interview Questions
4.0
 • 44 Interviews
Smartworks Interview Questions
3.5
 • 31 Interviews
Aliens Group Interview Questions
3.2
 • 30 Interviews
View all
Junior Engineer
166 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
93 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Junior Engineer Civil
81 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Engineer
34 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Safety Officer
34 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Nyati Group with

Godrej Industries Group

3.9
Compare

Tata Group

4.2
Compare

Adani Group

3.9
Compare

Reliance Industries

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview