Upload Button Icon Add office photos

Filter interviews by

NKG Infrastructure Fire & Safety Officer Interview Questions and Answers

Updated 14 Oct 2022

NKG Infrastructure Fire & Safety Officer Interview Experiences

1 interview found

I applied via Naukri.com and was interviewed in Oct 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About fire
  • Q2. About safety
  • Q3. About first aid

Interview Preparation Tips

Interview preparation tips for other job seekers - First impression

Interview questions from similar companies

I applied via Naukri.com

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Contraction site related to be questions. Steel, concrete, shuttering, plaster, lay out and drawing Topic.
  • Q2. Site related and very good performance lelated.
  • Q3. How will we increase the performance of the company?
  • Ans. 

    We can increase the performance of the company by implementing efficient project management techniques and investing in employee training and development.

    • Implement efficient project management techniques

    • Invest in employee training and development

    • Encourage innovation and creativity

    • Streamline processes and procedures

    • Regularly review and evaluate performance metrics

  • Answered by AI
  • Q4. How to make steel strong
  • Ans. 

    Steel can be made strong by controlling its composition and heat treatment.

    • Increasing the carbon content and adding other alloying elements like manganese, chromium, and nickel can improve strength.

    • Heat treatment processes like quenching and tempering can also increase strength.

    • Proper quality control during manufacturing and testing can ensure the steel meets strength requirements.

    • Examples of high-strength steels inclu...

  • Answered by AI
  • Q5. Very good finishing how to make

Interview Preparation Tips

Interview preparation tips for other job seekers - Teams work.
Nice performance.
Deal to contractor.
Chalange to the Uther contraction limited company.
Good salary in this per month.
very much gourment project work to all indian level work .
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
More than 8 weeks
Result
Selected Selected

I appeared for an interview in Dec 2024.

Round 1 - HR 

(3 Questions)

  • Q1. What was your experience during the interview process?
  • Ans. 

    The interview process was thorough and challenging, but overall a positive experience.

    • The interview consisted of multiple rounds, including technical, behavioral, and possibly a site visit.

    • I was asked to discuss my previous projects and experiences in detail.

    • There were questions about problem-solving skills and how I handle challenging situations on site.

    • Overall, the interviewers were professional and provided a clear

  • Answered by AI
  • Q2. What are your salary expectations?
  • Ans. 

    My salary expectations are in line with industry standards and based on my experience and qualifications.

    • Research industry standards for Civil Site Engineers in the specific location

    • Consider years of experience and level of qualifications

    • Be prepared to negotiate based on job responsibilities and benefits package

  • Answered by AI
  • Q3. Why you last company leave
  • Ans. 

    Seeking new challenges and opportunities for growth.

    • Desire for career advancement

    • Looking for new challenges

    • Opportunity for professional growth

    • Company restructuring or downsizing

    • Relocation to a new city

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jun 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

Any civil engineer work 12 year experience

Round 2 - Technical 

(2 Questions)

  • Q1. What is your company name
  • Ans. 

    Our company name is XYZ Engineering Solutions, specializing in civil engineering projects.

    • XYZ Engineering Solutions is a reputable firm in the civil engineering industry

    • We have successfully completed projects such as bridge construction, road infrastructure development, and building design

    • Our team of experienced engineers and architects ensure high-quality and innovative solutions

  • Answered by AI
  • Q2. Location in my nearest home town

Interview Preparation Tips

Interview preparation tips for other job seekers - Hard work and clear attitude
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. From civil IS CODES
  • Q2. About steel reinforcements, bbs,various tests
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Referral and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. How to find grades of concrete which is already mixed
  • Ans. 

    Grades of concrete in a mixed batch can be estimated by performing a slump test and conducting compressive strength tests on samples.

    • Perform a slump test to determine the workability of the concrete mix.

    • Take samples from the mixed batch and cast test specimens for compressive strength testing.

    • Conduct compressive strength tests on the specimens to determine the grade of concrete.

    • Compare the test results with the standar

  • Answered by AI
  • Q2. What are the site and laboratory test on bricks and cement
  • Ans. 

    Site and laboratory tests on bricks and cement are essential for ensuring quality and durability of construction materials.

    • Site tests for bricks include visual inspection, water absorption test, compressive strength test, and efflorescence test.

    • Laboratory tests for bricks involve water absorption test, compressive strength test, efflorescence test, and soundness test.

    • Site tests for cement include checking the color, sm...

  • Answered by AI
  • Q3. Plastering work calculation for different size of wall
  • Ans. 

    Plastering work calculation involves determining the surface area of the wall and the thickness of the plaster.

    • Calculate the surface area of the wall by multiplying the height and length of each wall segment.

    • Determine the total surface area to be plastered by adding up the surface areas of all wall segments.

    • Multiply the total surface area by the desired thickness of the plaster to get the volume of plaster needed.

    • Consi...

  • Answered by AI

I applied via Naukri.com and was interviewed in Apr 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. What is M30 concrete
  • Ans. 

    M30 concrete is a type of high-strength concrete with a compressive strength of 30 MPa.

    • M30 concrete is commonly used in construction projects that require high strength and durability.

    • It is made by mixing cement, sand, and coarse aggregates in a specific ratio.

    • The ratio of cement, sand, and aggregates in M30 concrete is 1:1:2.

    • M30 concrete is suitable for building structures like bridges, dams, and high-rise buildings.

    • I...

  • Answered by AI
  • Q2. 1 cum rcc weight
  • Q3. What should be the rebar grade
  • Ans. 

    The rebar grade should be selected based on the design requirements and the structural load capacity.

    • The rebar grade is determined by the design engineer based on the structural requirements.

    • The grade of rebar is usually specified in the structural drawings and specifications.

    • The most commonly used rebar grades are 40, 60, and 75.

    • The higher the grade of rebar, the stronger it is and the more load it can bear.

    • The rebar ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Always time follow technical specification .
Interview experience
2
Poor
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Sep 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What is the branding sedule and explain
  • Ans. 

    Branding schedule is a plan outlining the timeline and activities for promoting a brand.

    • Branding schedule includes tasks such as creating a brand strategy, designing a logo, developing marketing materials, and planning advertising campaigns.

    • It helps ensure consistency in brand messaging and image across different platforms and channels.

    • Example: A branding schedule for a new product launch may include market research, l...

  • Answered by AI
  • Q2. Tel me concrete grade and mixing ratio
  • Ans. 

    Concrete grade and mixing ratio are crucial factors in determining the strength and durability of a structure.

    • Concrete grade refers to the strength of the concrete mix, typically denoted by a number like M20, M30, etc.

    • Mixing ratio is the proportion of cement, sand, and aggregate in the concrete mix, usually expressed as 1:x:y.

    • For example, a common mixing ratio for M20 grade concrete is 1:1.5:3, which means 1 part cemen

  • Answered by AI
  • Q3. How to do LABER maintenance in site
  • Ans. 

    Regularly inspect and maintain all equipment and tools used on site to ensure they are in good working condition.

    • Create a maintenance schedule for all equipment and tools used on site.

    • Check for any signs of wear and tear on equipment and tools.

    • Clean and lubricate equipment regularly to prevent rust and corrosion.

    • Replace any damaged or worn out parts immediately.

    • Train site workers on proper handling and maintenance of e...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for URC Construction Civil Site Engineer interview:
  • Civil Engineering

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions

I applied via Company Website and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. They asked for previous company work management, work culture, work timing & some technical questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Its not so difficult
Just share your work experience

NKG Infrastructure Interview FAQs

What are the top questions asked in NKG Infrastructure Fire & Safety Officer interview?

Some of the top questions asked at the NKG Infrastructure Fire & Safety Officer interview -

  1. About saf...read more
  2. About first ...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 117 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
Bechtel Interview Questions
3.9
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 61 Interviews
Wood Group Interview Questions
3.8
 • 59 Interviews
Psp Projects Interview Questions
3.9
 • 51 Interviews
View all
Civil Site Engineer
68 salaries
unlock blur

₹2 L/yr - ₹7.2 L/yr

Site Engineer
59 salaries
unlock blur

₹2 L/yr - ₹5.2 L/yr

Billing Engineer
42 salaries
unlock blur

₹2.4 L/yr - ₹6.6 L/yr

Senior Engineer
36 salaries
unlock blur

₹3.6 L/yr - ₹9 L/yr

Civil Engineer
36 salaries
unlock blur

₹1.8 L/yr - ₹5.5 L/yr

Explore more salaries
Compare NKG Infrastructure with

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.9
Compare

Apco Infratech

3.7
Compare

Saipem

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview