Upload Button Icon Add office photos

Filter interviews by

Nirmaan Projects Site Engineer Interview Questions and Answers

Updated 27 Mar 2022

Nirmaan Projects Site Engineer Interview Experiences

1 interview found

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 27 Mar 2022

I applied via Company Website and was interviewed in Feb 2022. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. What are your salary expectations?

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil Site Engeneer
* Building work & other all site work

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Under and over reinf of beam and column
  • Ans. 

    Under and over reinforcement in beams and columns refers to the amount of reinforcement provided in relation to the required strength of the structure.

    • Under reinforcement occurs when the amount of reinforcement provided is less than what is required for the structure to carry the design loads.

    • Over reinforcement occurs when the amount of reinforcement provided is more than what is required for the structure, leading to ...

  • Answered by AI
  • Q2. Ndt tests of members of why it’s been done
  • Ans. 

    NDT tests of members are done to ensure structural integrity and safety.

    • NDT tests are non-destructive tests used to evaluate the properties of a material, component, or system without causing damage.

    • These tests help in detecting defects such as cracks, voids, and discontinuities that may compromise the structural integrity of the members.

    • By conducting NDT tests, engineers can ensure the safety and reliability of struct...

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Salary negotiations
  • Q2. Previous employment

Interview Preparation Tips

Interview preparation tips for other job seekers - Good interview
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Your previous work experiences
  • Q2. About construction of high rise buildings

Interview Preparation Tips

Interview preparation tips for other job seekers - Approach with confidence
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Working experience
  • Q2. Present location of work
  • Ans. 

    I am currently working at a construction site in downtown city.

    • Construction site in downtown city

    • Working on a high-rise building project

    • Coordinating with architects, contractors, and workers

    • Ensuring adherence to safety regulations and project timelines

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Worth technical round interview

I applied via Company Website and was interviewed in Jun 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(4 Questions)

  • Q1. Why do you want to join in this company?
  • Q2. What is your long term goal?
  • Q3. Tell me about yourself
  • Q4. What are your strengths

Interview Preparation Tips

Interview preparation tips for other job seekers - Research about the company?
Understand job description?
Know your interview?
Common interview questions?
Tell me about yourself
What are your strengths
Your goals
Leadership skills

I applied via Recruitment Consulltant

Round 1 - Technical 

(1 Question)

  • Q1. What is SI unit of inductance
  • Ans. 

    The SI unit of inductance is Henry (H).

    • Inductance is the property of an electrical circuit that opposes a change in current.

    • It is measured in Henry (H) and is named after American scientist Joseph Henry.

    • Inductance is used in various electrical components such as transformers, inductors, and motors.

    • The symbol for inductance is L and it is measured in units of Henry per meter squared (H/m^2).

  • Answered by AI
Round 2 - Assignment 

Highmast and street lights , Towers , Control panel trouble shoot

Interview Preparation Tips

Topics to prepare for Rohan Builders Site Engineer interview:
  • Electrical Maintenance
  • Building Construction
  • Electrical Machines
  • Switch gears
  • Business development
  • Safety Management System
  • Operating Systems
Interview preparation tips for other job seekers - Good environment work and top management company
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Aptitude Test 

Round was quite easy, for mechanical they had turbo machinery and heat transfer questions and basic SOM,TOM,MD,MF

Round 3 - One-on-one 

(2 Questions)

  • Q1. 1. Tell me about yourself
  • Q2. 2. How lift works and how ACs work and different types of ACs
  • Ans. 

    Lifts work on the principle of pulleys and counterweights while ACs work on the principle of refrigeration.

    • Lifts use a motor to move a counterweight that balances the weight of the lift car and its occupants.

    • ACs use a compressor to compress and expand refrigerant gas to absorb and release heat.

    • Types of ACs include window ACs, split ACs, central ACs, and portable ACs.

    • Window ACs are mounted on windows and cool a single r...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Brush up your skills regarding refrigerations and airconditioning

Site Engineer Interview Questions & Answers

JLL user image Prathmesh Kalan

posted on 9 Feb 2022

Round 1 - Aptitude Test 

Aptitude test like mathematics question ,reasoning & our department like mechanical engineer

Round 2 - Technical 

(2 Questions)

  • Q1. Tell me about ur self What should we hire you
  • Q2. Job timing location & salary fix
Round 3 - HR 

(3 Questions)

  • Q1. What are your salary expectations?
  • Q2. Joining letter ,job timing
  • Q3. Salary f
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Referral and was interviewed in Sep 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Tell me about yourself and previous experience
  • Q2. Water proofing details

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview was an average

I applied via Walk-in and was interviewed in Feb 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Why bricks are wet during brick work
  • Ans. 

    Bricks are wet during brick work to prevent them from absorbing water from the mortar too quickly.

    • Wet bricks prevent the mortar from drying out too quickly, which can weaken the bond between the bricks and the mortar.

    • Wet bricks also help to prevent efflorescence, a white powdery substance that can form on the surface of bricks due to the migration of salts.

    • Bricks should be dampened, not soaked, before use.

    • The amount of...

  • Answered by AI
  • Q2. Thickness of cement motar in brick work horizontal and vertical
  • Ans. 

    The thickness of cement mortar in brickwork varies depending on the type of brick and the purpose of the wall.

    • For load-bearing walls, the thickness of the mortar should be 10mm for horizontal joints and 8mm for vertical joints.

    • For non-load-bearing walls, the thickness of the mortar can be reduced to 6mm for horizontal joints and 4mm for vertical joints.

    • The type of brick used can also affect the thickness of the mortar....

  • Answered by AI
  • Q3. Chemical names of water proofing
  • Ans. 

    Chemical names of water proofing

    • Acrylic polymers

    • Bituminous coatings

    • Silicones

    • Polyurethane

    • Epoxy resins

  • Answered by AI
  • Q4. Type of tiles used in toilet
  • Ans. 

    Ceramic or porcelain tiles are commonly used in toilets due to their durability and water resistance.

    • Ceramic or porcelain tiles are commonly used in toilets

    • These tiles are durable and water-resistant

    • Other options include natural stone tiles and vinyl tiles

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. What are your salary expectations?
  • Ans. 

    I expect a competitive salary based on my qualifications and experience.

    • Research the average salary range for Site Engineers in your area

    • Consider your level of experience and expertise

    • Factor in any additional certifications or specialized skills you possess

    • Be prepared to negotiate and discuss benefits package

    • Example: Based on my research, the average salary range for Site Engineers in this area is $60,000 to $80,000. C...

  • Answered by AI
  • Q2. Share details of your previous job.
  • Ans. 

    I worked as a Site Engineer at XYZ Construction Company.

    • Managed and supervised construction projects on-site.

    • Ensured compliance with building codes and regulations.

    • Collaborated with architects, contractors, and subcontractors.

    • Monitored project progress and resolved any issues that arose.

    • Prepared and maintained project documentation, including reports and drawings.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't be panicked while going to interview

Nirmaan Projects Interview FAQs

How many rounds are there in Nirmaan Projects Site Engineer interview?
Nirmaan Projects interview process usually has 1 rounds. The most common rounds in the Nirmaan Projects interview process are HR.
How to prepare for Nirmaan Projects Site Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Nirmaan Projects. The most common topics and skills that interviewers at Nirmaan Projects expect are Site Execution, Billing, Civil Engineering, Construction Management and Site Supervision.

Tell us how to improve this page.

People are getting interviews through

based on 1 Nirmaan Projects interview
Company Website
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.
Nirmaan Projects Site Engineer Salary
based on 4 salaries
₹3 L/yr - ₹3.4 L/yr
16% less than the average Site Engineer Salary in India
View more details
Civil Site Engineer
10 salaries
unlock blur

₹1.8 L/yr - ₹2.7 L/yr

Civil Engineer
8 salaries
unlock blur

₹2.2 L/yr - ₹4.3 L/yr

Safety Officer
7 salaries
unlock blur

₹2.2 L/yr - ₹3.6 L/yr

Site Engineer
4 salaries
unlock blur

₹3 L/yr - ₹3.4 L/yr

Project Coordinator
4 salaries
unlock blur

₹1.9 L/yr - ₹4 L/yr

Explore more salaries
Compare Nirmaan Projects with

JLL

4.1
Compare

CBRE

4.2
Compare

Square Yards

4.1
Compare

NoBroker

3.1
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview