Nikhil Construction Site Execution Engineer Interview Questions and Answers

Updated 30 Mar 2024

Nikhil Construction Site Execution Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - HR 

(3 Questions)

  • Q1. How many projects do you handled and project details
  • Q2. Family background
  • Q3. Why you left old company
Round 2 - Technical 

(2 Questions)

  • Q1. Procedure of finishing work
  • Ans. 

    Finishing work involves following a set procedure to ensure completion of tasks and quality standards.

    • Inspect work area for completion and quality

    • Address any deficiencies or issues

    • Clean up work area

    • Document completion of work

    • Obtain client approval if necessary

  • Answered by AI
  • Q2. RCC details in brief
  • Ans. 

    RCC stands for Reinforced Cement Concrete, a composite material where concrete is reinforced with steel bars or mesh.

    • RCC is commonly used in construction for beams, columns, slabs, and foundations.

    • The steel reinforcement helps to increase the tensile strength of the concrete.

    • RCC structures are designed to resist bending and shear forces.

    • Proper curing of RCC is essential to achieve maximum strength and durability.

    • RCC st...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Salary negotiation is asking

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Mivan formwork process?
  • Ans. 

    Mivan formwork is a construction technique that uses aluminum formwork system for casting concrete structures.

    • Mivan formwork involves setting up aluminum formwork panels, fixing reinforcement bars, pouring concrete, and removing the formwork after the concrete has set.

    • It is a fast and efficient construction method commonly used for high-rise buildings and large residential projects.

    • The system allows for smooth finishes...

  • Answered by AI
  • Q2. Finishing process
  • Q3. Reinforcement related

I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Some basic questions about Ofc work and personal information
  • Q2. Ofc cable blowing how to start
  • Ans. 

    To start OFC cable blowing, follow these steps

    • Ensure that the ducts are clean and free of any obstruction

    • Attach the cable blowing machine to the duct

    • Connect the cable to the machine and start the blowing process

    • Monitor the cable's progress and adjust the machine's speed as needed

    • Once the cable has been blown through the entire length of the duct, detach the machine and cable

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Bondada Engineering Site Engineer interview:
  • Nld
  • Lm
Interview preparation tips for other job seekers - No fear in answering questions be strong
Just one interview it's enough to get job in bepl
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before May 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. How do you make RMC reconciliation?
  • Ans. 

    RMC reconciliation involves comparing the quantity of materials ordered with the quantity used in construction to ensure accuracy.

    • Collect all the data related to RMC (Ready Mix Concrete) orders and deliveries.

    • Compare the quantity of RMC ordered with the quantity actually used in construction.

    • Identify any discrepancies and investigate the reasons behind them.

    • Adjust the records accordingly to ensure accurate billing and

  • Answered by AI
  • Q2. How to calculate bbs ?
  • Ans. 

    BBS (Bar Bending Schedule) is calculated by determining the quantity of steel reinforcement required for a particular concrete structure.

    • Calculate the total length of bars required for each diameter and type of reinforcement.

    • Determine the number of bars required for each diameter and type of reinforcement.

    • Calculate the total weight of bars required for each diameter and type of reinforcement.

    • Prepare a detailed schedule...

  • Answered by AI
  • Q3. How to check paint measurements?
  • Ans. 

    Paint measurements can be checked using a paint thickness gauge to ensure compliance with specifications.

    • Use a paint thickness gauge to measure the thickness of the paint layer.

    • Compare the measured thickness with the specified thickness in the project specifications.

    • Ensure that the paint thickness is uniform across the surface.

    • Repeat the measurements at multiple points to ensure accuracy.

    • Adjust the paint application if...

  • Answered by AI
  • Q4. How do you find extra items for WO amendment?
  • Ans. 

    Extra items for WO amendment can be found by reviewing project specifications, consulting with stakeholders, conducting site visits, and analyzing previous change orders.

    • Review project specifications for any missed items or changes

    • Consult with stakeholders such as architects, engineers, and contractors for input

    • Conduct site visits to identify any additional work required

    • Analyze previous change orders to see if any item

  • Answered by AI
  • Q5. How do you ConsiderJMR is right or wrong?
  • Ans. 

    Consider JMR based on project specifications, quantities, rates, and market conditions.

    • Review project specifications to ensure accurate billing

    • Verify quantities of materials and work done

    • Check rates for labor, materials, and equipment

    • Consider market conditions for pricing accuracy

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - For billing engineer interview you should practice of bbs and procedures of billing and backup required for billing process!
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in May 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

Question & Discussion about previous project, working methods,hindreces, management and other policies of previous companies.

Round 3 - HR 

(2 Questions)

  • Q1. Last & least salary released discussion.
  • Q2. Last company package.
  • Ans. 

    The last company package was competitive and included various benefits.

    • Competitive salary

    • Health insurance

    • Retirement plan

    • Paid time off

    • Performance bonuses

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't lose confidence at the time of interview.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jun 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. What is the basics concept used for construction of Substation from start to Finish
  • Ans. 

    The basic concept for construction of a substation involves site selection, design, equipment installation, and commissioning.

    • Site selection involves identifying a suitable location for the substation based on factors such as proximity to power sources and load centers.

    • Design involves creating a plan for the substation layout, including the placement of equipment such as transformers, switchgear, and control systems.

    • Eq...

  • Answered by AI
  • Q2. What is Single Line Diagram of Substation
  • Ans. 

    Single Line Diagram of Substation is a graphical representation of electrical distribution system in a substation.

    • It shows the electrical components and their connections in a simplified manner

    • It helps in understanding the flow of power and voltage levels in the system

    • It is used for planning, designing, and maintenance of the substation

    • It includes information about transformers, circuit breakers, busbars, and other equ...

  • Answered by AI
  • Q3. What is your strength
  • Q4. If the company not provide the payment timely to the contractor, then you will conveyance the contractor for the work

Interview Preparation Tips

Interview preparation tips for other job seekers - Just keep the confidence & positive attitude. Mostly technically & management questions are asked
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Nov 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Self introduction
Round 3 - HR 

(1 Question)

  • Q1. Salary negotiation
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. How to execution of ms line , DI line ,HDPE line etc
  • Ans. 

    Execution of MS line, DI line, HDPE line involves proper planning, material selection, installation, and testing.

    • Plan the layout and route of the lines based on project requirements and specifications.

    • Select appropriate materials such as MS, DI, or HDPE based on factors like pressure rating, corrosion resistance, and cost.

    • Ensure proper installation of the lines including welding, jointing, and fittings.

    • Conduct pressure...

  • Answered by AI
  • Q2. Which types of your good skills
  • Q3. Your will work in all location in India
  • Ans. My answer in only mp in india
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - We are advice given that only add cv that points,you do work in job .
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Aug 2024.

Round 1 - HR 

(3 Questions)

  • Q1. Current working organization?
  • Ans. 

    I am currently working at XYZ Engineering Firm as a Senior Civil Engineer.

    • XYZ Engineering Firm

    • Senior Civil Engineer position

    • Responsibilities include project management and design work

    • Collaborating with team members and clients

  • Answered by AI
  • Q2. Current ctc?
  • Ans. 

    Current CTC is confidential and can be discussed during negotiation.

    • Current CTC is subject to company policies and confidentiality agreements.

    • It is common practice to discuss salary expectations during the interview process.

    • Candidates should be prepared to provide their current CTC if requested by the employer.

  • Answered by AI
  • Q3. Expected CTC?
Round 2 - Technical 

(3 Questions)

  • Q1. What is plastering thickness and specifications?
  • Ans. 

    Plastering thickness and specifications refer to the recommended thickness and quality standards for applying plaster on walls or ceilings.

    • Plastering thickness is typically around 12-15mm for internal walls and 15-20mm for external walls.

    • Specifications include using the right mix of plaster, ensuring a smooth finish, and allowing for proper curing time.

    • Plastering should be done in multiple layers to achieve the desired...

  • Answered by AI
  • Q2. Current work location building Footings, and column sizes?
  • Ans. 

    Currently working on building footings and column sizes at various construction sites.

    • Designing footings based on soil conditions and structural requirements

    • Calculating column sizes based on load-bearing capacity and architectural design

    • Coordinating with structural engineers and architects to ensure proper sizing and placement

    • Inspecting construction sites to verify footing and column dimensions

    • Utilizing software such a

  • Answered by AI
  • Q3. Tiles specifications?

I applied via Walk-in and was interviewed in May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Case Study 

Construction material and techniques
Construction labour management
Site work

Interview Preparation Tips

Topics to prepare for Construction Group Site Engineer interview:
  • Autocad
  • REVIT Architecture
Interview preparation tips for other job seekers - I am very happy to construction work related jobs and design course are completed

Nikhil Construction Interview FAQs

How many rounds are there in Nikhil Construction Site Execution Engineer interview?
Nikhil Construction interview process usually has 2 rounds. The most common rounds in the Nikhil Construction interview process are HR and Technical.
What are the top questions asked in Nikhil Construction Site Execution Engineer interview?

Some of the top questions asked at the Nikhil Construction Site Execution Engineer interview -

  1. Procedure of finishing w...read more
  2. RCC details in br...read more

Tell us how to improve this page.

Nikhil Construction Site Execution Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more
Senior Engineer
7 salaries
unlock blur

₹4 L/yr - ₹5.9 L/yr

Accountant
6 salaries
unlock blur

₹1 L/yr - ₹4.2 L/yr

Civil Site Engineer
5 salaries
unlock blur

₹2 L/yr - ₹2.4 L/yr

Account Assistant
5 salaries
unlock blur

₹2 L/yr - ₹5 L/yr

Junior Engineer Civil
5 salaries
unlock blur

₹2.4 L/yr - ₹3.2 L/yr

Explore more salaries
Compare Nikhil Construction with

Lea Associates South Asia

4.3
Compare

McNally Bharat Engineering

4.0
Compare

R.V.R. PROJECTS

4.0
Compare

ABCI Infrastructures

3.4
Compare