i
Navitasys India
Filter interviews by
I applied via Campus Placement and was interviewed in Jun 2024. There were 3 interview rounds.
Some question was related to number, time and work
Transistors are three-terminal semiconductor devices used for amplification and switching, while diodes are two-terminal semiconductor devices used for rectification.
Transistors have three terminals: base, emitter, and collector, while diodes have two terminals: anode and cathode.
Transistors can amplify signals and act as switches, while diodes allow current to flow in one direction only.
Examples of transistors include...
I applied via Campus Placement and was interviewed before Dec 2023. There were 3 interview rounds.
A multimeter is a device used to measure voltage, current, and resistance in electrical circuits.
A multimeter typically has settings for measuring voltage, current, and resistance.
To measure voltage, the multimeter is connected in parallel to the circuit being tested.
To measure current, the multimeter is connected in series to the circuit being tested.
To measure resistance, the multimeter sends a small known current th...
Power factor is a measure of how effectively electrical power is being used in a system.
Power factor is the ratio of real power (kW) to apparent power (kVA) in an electrical system.
It is a number between 0 and 1, with 1 indicating perfect efficiency.
Low power factor can result in increased energy costs and inefficient use of electrical equipment.
Power factor correction can be implemented to improve efficiency and reduc
Abbreviation of my resume includes key achievements, skills, and experiences in a concise format.
Include relevant job titles and companies
List key skills and certifications
Highlight academic achievements and projects
Mention any relevant volunteer work or extracurricular activities
Top trending discussions
posted on 30 Sep 2022
I applied via Walk-in and was interviewed before Sep 2021. There were 2 interview rounds.
posted on 17 Mar 2024
I applied via Approached by Company and was interviewed before Mar 2023. There was 1 interview round.
posted on 16 Mar 2024
I applied via Campus Placement and was interviewed in Sep 2023. There was 1 interview round.
posted on 4 Aug 2024
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
I am a recent graduate with a degree in Production Engineering, passionate about manufacturing processes and eager to learn and grow in the field.
Graduated with a degree in Production Engineering
Passionate about manufacturing processes
Eager to learn and grow in the field
Yes, I am comfortable with shift timings and understand the importance of flexibility in a production environment.
I am willing to work different shifts as required by the job
I understand the need for flexibility in a production setting
I am prepared to adjust my schedule to meet the needs of the team and company
I applied via Naukri.com and was interviewed before Sep 2019. There was 1 interview round.
5S quality is a workplace organization method that aims to improve efficiency and safety.
Sort - separate necessary items from unnecessary ones
Set in order - arrange necessary items in a logical and efficient manner
Shine - clean and maintain the workplace
Standardize - establish procedures and standards for maintaining the workplace
Sustain - ensure that the 5S system is continuously implemented and improved
Example: organ...
The 7 tools in production are used for quality control and process improvement.
Check sheets
Control charts
Histograms
Pareto charts
Scatter diagrams
Flowcharts
Cause-and-effect diagrams
Product inspection involves thorough examination of the product to ensure it meets quality standards.
Identify the specific quality standards for the product
Inspect the product visually for defects or irregularities
Use measuring tools to check dimensions and tolerances
Perform functional tests to ensure the product works as intended
Document any issues found and report to appropriate personnel
The root cause of product A's failure in the last stage can be due to various factors.
The failure could be due to a problem in the manufacturing process.
It could be due to a defect in the raw materials used.
The failure could also be due to a design flaw in the product.
Human error during the production process could also be a cause.
Environmental factors such as temperature or humidity could also play a role.
I applied via Campus Placement and was interviewed before Oct 2021. There were 4 interview rounds.
Basic Btech and quantitative aptitude question
GD topic was general , but advice is that all should be eager to participate.
posted on 18 May 2024
posted on 26 Nov 2024
The operator control link system of out of production refers to the interface between operators and outdated production systems.
The operator control link system allows operators to interact with and control production equipment.
Out of production systems may have outdated technology or interfaces that require specialized knowledge to operate.
Operators may need training or documentation to effectively use the operator co...
based on 2 interviews
Interview experience
based on 2 reviews
Rating in categories
Assistant Engineer
231
salaries
| ₹2 L/yr - ₹5.6 L/yr |
Diploma Trainee Engineer
158
salaries
| ₹1.5 L/yr - ₹2.5 L/yr |
Junior Assistant Trainee
156
salaries
| ₹1.8 L/yr - ₹2.5 L/yr |
Assistant Junior Engineer
87
salaries
| ₹1.9 L/yr - ₹3.5 L/yr |
Production Engineer
76
salaries
| ₹1.6 L/yr - ₹6.7 L/yr |
Bharat Electronics
Flex
Foxconn
Dixon Technologies