I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
I am a recent graduate with a degree in Production Engineering, passionate about manufacturing processes and eager to learn and grow in the field.
Graduated with a degree in Production Engineering
Passionate about manufacturing processes
Eager to learn and grow in the field
Yes, I am comfortable with shift timings and understand the importance of flexibility in a production environment.
I am willing to work different shifts as required by the job
I understand the need for flexibility in a production setting
I am prepared to adjust my schedule to meet the needs of the team and company
I applied via Campus Placement and was interviewed in Sep 2023. There was 1 interview round.
I applied via Walk-in and was interviewed before Sep 2021. There were 2 interview rounds.
posted on 15 Dec 2024
I applied via Campus Placement and was interviewed in Jun 2024. There were 3 interview rounds.
Some question was related to number, time and work
Transistors are three-terminal semiconductor devices used for amplification and switching, while diodes are two-terminal semiconductor devices used for rectification.
Transistors have three terminals: base, emitter, and collector, while diodes have two terminals: anode and cathode.
Transistors can amplify signals and act as switches, while diodes allow current to flow in one direction only.
Examples of transistors include...
posted on 13 Oct 2023
I applied via campus placement at Loyola College, Chennai and was interviewed in Apr 2023. There were 4 interview rounds.
Logical reasoning , problem solving
posted on 17 Mar 2024
I applied via Approached by Company and was interviewed before Mar 2023. There was 1 interview round.
posted on 6 Jan 2025
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
I applied via campus placement at Sri Ramakrishna Engineering College, Coimbatore and was interviewed in Sep 2023. There were 2 interview rounds.
Basic aptitude which comprises of all topics and few technical mcq
posted on 20 Jul 2022
Cycle time is the time it takes to complete one cycle of a process, while takt time is the rate at which a product must be produced to meet customer demand.
Cycle time is the total time it takes to complete a process, from start to finish.
Takt time is the maximum amount of time allowed to produce one unit of a product in order to meet customer demand.
Cycle time can be used to identify bottlenecks and inefficiencies in a...
Productivity refers to the efficiency and effectiveness of completing tasks and achieving goals.
Productivity is a measure of output per unit of input.
It involves maximizing the use of resources to achieve desired outcomes.
Examples of productivity measures include revenue per employee, units produced per hour, and customer satisfaction ratings.
Improving productivity can lead to increased profitability, competitiveness,
based on 2 interviews
Interview experience
based on 2 reviews
Rating in categories
Junior Engineer
251
salaries
| ₹1.6 L/yr - ₹3.6 L/yr |
Engineer
172
salaries
| ₹2 L/yr - ₹5 L/yr |
Quality Engineer
142
salaries
| ₹1.8 L/yr - ₹4.2 L/yr |
Process Engineer
71
salaries
| ₹2.1 L/yr - ₹4.8 L/yr |
Production Engineer
48
salaries
| ₹1.9 L/yr - ₹5 L/yr |
TCS
Infosys
Wipro
HCLTech