i
Dixon Technologies
Filter interviews by
Clear (1)
I live in a cozy apartment in downtown Seattle.
I live in downtown Seattle
My apartment is cozy
I enjoy the urban lifestyle
My fevriout colur Red
My grandmother's name is Mary.
Her full name is Mary Smith.
She was born in 1935.
She loves gardening and baking.
She lives in a small town in Ohio.
My favorite hero is Elon Musk.
Entrepreneur and CEO of SpaceX, Tesla, Neuralink, and The Boring Company
Visionary leader in the fields of space exploration, electric vehicles, and renewable energy
Known for his innovative ideas and ambitious goals
Inspires others to think big and work towards a better future
My favorite subject is Mechanical Engineering.
I enjoy studying thermodynamics and fluid mechanics.
I have a passion for designing and analyzing mechanical systems.
I find joy in learning about materials science and manufacturing processes.
I applied via Approached by Company and was interviewed in Nov 2024. There was 1 interview round.
The operator control link system of out of production refers to the interface between operators and outdated production systems.
The operator control link system allows operators to interact with and control production equipment.
Out of production systems may have outdated technology or interfaces that require specialized knowledge to operate.
Operators may need training or documentation to effectively use the operator co...
Dixon Technologies interview questions for designations
I applied via Referral and was interviewed in Jul 2021. There were 4 interview rounds.
Matrix and package are different in terms of structure and purpose.
Matrix is a two-dimensional array of elements, while package is a collection of related classes and interfaces.
Matrix is used for mathematical operations and data manipulation, while package is used for organizing and managing code.
Matrix can be accessed using row and column indices, while package can be imported and used in other code files.
Example of ...
Resistance and capacitance values can be calculated using various formulas and tools.
Resistance can be calculated using Ohm's law: R = V/I
Capacitance can be calculated using the formula: C = Q/V
The values can also be determined using multimeters or online calculators
The color code on resistors can be used to determine their resistance value
The capacitance value can be determined by reading the markings on the capacitor
...
Reflow oven profile can be taken by measuring temperature and time during the heating and cooling process.
Use a thermocouple to measure temperature at different points in the oven
Record the temperature and time data during the heating and cooling process
Analyze the data to determine if the oven is heating and cooling at the correct rate
Adjust the oven settings if necessary to achieve the desired profile
Get interview-ready with Top Dixon Technologies Interview Questions
I applied via Naukri.com and was interviewed in Jul 2021. There was 1 interview round.
PQC stands for Process Quality Control.
PQC is a set of activities performed to ensure the quality of a production process.
It involves monitoring and controlling various parameters to maintain consistent quality.
Examples of PQC activities include statistical process control, quality inspections, and process optimization.
Top trending discussions
I applied via Naukri.com and was interviewed in Jan 2020. There were 3 interview rounds.
NPI involves several steps including design, testing, validation, and production.
Designing the product and creating a prototype
Testing the prototype to ensure it meets specifications
Validating the product through various tests and certifications
Preparing for production by creating a manufacturing plan and sourcing materials
Producing the product and conducting quality control checks
BOM stands for Bill of Materials, which is a comprehensive list of all the materials, components, and sub-assemblies required to manufacture a product.
BOM is used in manufacturing to ensure that all necessary components are available for production.
It includes information such as part numbers, quantities, and descriptions.
BOM can be used to estimate the cost of production and to plan for inventory management.
BOM can al...
I applied via Company Website and was interviewed before Jan 2023. There was 1 interview round.
I applied via Walk-in and was interviewed before May 2022. There were 3 interview rounds.
I have experience in optimizing production processes and improving efficiency.
Implemented lean manufacturing principles to reduce waste and increase productivity
Developed and implemented standard operating procedures to ensure consistent quality
Identified and resolved bottlenecks in production line to improve throughput
Collaborated with cross-functional teams to implement process improvements
Utilized data analysis to i...
posted on 13 Aug 2024
I was interviewed before Aug 2023.
I worked at XYZ Company as a Production Engineer for 3 years.
Worked at XYZ Company for 3 years
Managed production processes and equipment
Implemented lean manufacturing principles to improve efficiency
based on 9 interviews
1 Interview rounds
based on 44 reviews
Rating in categories
Quality Engineer
256
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
253
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
220
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
186
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
177
salaries
| ₹0 L/yr - ₹0 L/yr |
Amber Enterprises India
Optiemus Infracom
Jabil Circuit India
Flex