PWI stands for Process Window Index in a reflow profile, indicating the process window's capability to produce acceptable solder joints.
PWI is a metric used to evaluate the quality of a reflow profile in soldering processes.
It is calculated by comparing the peak temperature, time above liquidus, and cooling rate of the reflow profile to the specified limits.
A higher PWI value indicates a wider process window and better...
To control SMT defects, implement proper quality control measures, train staff on best practices, maintain equipment regularly, and analyze root causes of defects.
Implement proper quality control measures to catch defects early on
Train staff on best practices for handling components and operating machinery
Regularly maintain and calibrate equipment to ensure accurate placement of components
Analyze root causes of defects...
To make an analysis report, gather data, identify key metrics, analyze data, create visualizations, and draw conclusions.
Gather relevant data from various sources
Identify key metrics to focus on
Analyze the data using statistical methods
Create visualizations such as charts or graphs to present the findings
Draw conclusions and make recommendations based on the analysis
5W1H is a method used for gathering information by asking Who, What, When, Where, Why, and How.
Who - refers to the person or group involved
What - refers to the action or event
When - refers to the time or date
Where - refers to the location
Why - refers to the reason or purpose
How - refers to the method or process
Top trending discussions
I applied via Naukri.com and was interviewed in Jul 2024. There were 2 interview rounds.
Production development and zero deficit protect manufacturing process
I applied via LinkedIn and was interviewed in Apr 2024. There were 2 interview rounds.
posted on 30 Oct 2024
Rejection control find the 95%control
I applied via Job Fair and was interviewed in Feb 2024. There was 1 interview round.
I applied via Walk-in and was interviewed before Mar 2023. There were 3 interview rounds.
Total 40 Questions in the test
LCO2 plant specification refers to the detailed requirements and characteristics of a plant that produces liquid carbon dioxide.
LCO2 plants are designed to produce and store liquid carbon dioxide.
The plant typically consists of several key components such as compressors, condensers, and storage tanks.
The specification includes details about the plant's capacity, efficiency, and safety features.
It may also cover aspects...
posted on 4 Nov 2023
The hand production area currently has 25 employees.
There are 25 people working in the hand production area.
The number of employees may vary depending on the production needs.
Supervising a team of 25 individuals requires strong leadership skills.
based on 2 interviews
Interview experience
Assistant Engineer
216
salaries
| ₹1.9 L/yr - ₹5.6 L/yr |
Diploma Trainee Engineer
156
salaries
| ₹1.5 L/yr - ₹2.5 L/yr |
Junior Assistant Trainee
153
salaries
| ₹1.8 L/yr - ₹2.5 L/yr |
Assistant Junior Engineer
90
salaries
| ₹1.9 L/yr - ₹3.5 L/yr |
Production Engineer
73
salaries
| ₹1.1 L/yr - ₹7 L/yr |
TCS
Infosys
Wipro
HCLTech