Filter interviews by
I applied via Walk-in
Cycle time is the time it takes to complete one cycle of a process. Lead time is the time it takes to fulfill a customer order. Downtime is the time when a machine or process is not operational. Upph stands for Units Per Production Hour.
Cycle time is the time it takes to complete one cycle of a process.
Lead time is the time it takes to fulfill a customer order.
Downtime is the time when a machine or process is not opera...
UPH is calculated by dividing the total number of units produced by the total number of hours worked.
Determine the total number of units produced
Determine the total number of hours worked
Divide the total number of units produced by the total number of hours worked
UPH = Total Units Produced / Total Hours Worked
I applied via Walk-in and was interviewed in Sep 2020. There were 3 interview rounds.
UPPH stands for Units Per Person Hour, a measure of productivity in manufacturing.
UPPH is calculated by dividing the number of units produced by the number of workers and the number of hours worked.
It is commonly used in manufacturing industries to measure productivity and efficiency.
For example, if a factory produces 1000 units in 8 hours with 10 workers, the UPPH would be 12.5 (1000/8/10).
I applied via Other and was interviewed before Oct 2019. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Jun 2024. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed before May 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Sep 2021. There were 3 interview rounds.
Understand cultural differences, build relationships, communicate clearly and respectfully.
Research and learn about Chinese culture and customs.
Be patient and build relationships before discussing business.
Communicate clearly and respectfully, avoiding direct confrontation.
Be aware of nonverbal communication and body language.
Use a translator if necessary.
Be prepared for negotiations and understand the importance of sa...
posted on 21 Feb 2025
Industrial engineers are responsible for designing efficient systems that integrate people, materials, equipment, and energy to optimize productivity.
Analyze production processes to identify areas for improvement
Develop and implement systems to increase efficiency and reduce waste
Collaborate with management and production teams to streamline operations
Conduct time studies and work measurement to establish standards
Util...
My specialization in work is in process optimization and lean manufacturing.
Specialize in identifying inefficiencies in production processes
Implementing strategies to streamline operations and reduce waste
Experience with tools such as Six Sigma and Kaizen
Examples: reducing cycle times, improving quality control measures
Implemented a kaizen event to optimize the layout of the production line, reducing waste and improving efficiency.
Conducted time studies to identify bottlenecks in the production process
Implemented 5S methodology to organize workstations and improve workflow
Introduced visual management tools to track progress and identify areas for improvement
I have saved over $500,000 in cost savings as an industrial engineer.
Implemented lean manufacturing techniques to reduce waste and improve efficiency
Negotiated better supplier contracts to lower material costs
Optimized production processes to increase output without increasing costs
Introduced automation to streamline operations and reduce labor costs
I applied via Referral and was interviewed in Jun 2023. There were 3 interview rounds.
based on 8 reviews
Rating in categories
Junior Engineer
584
salaries
| ₹0 L/yr - ₹0 L/yr |
Operator
383
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer Trainee
333
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
197
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
136
salaries
| ₹0 L/yr - ₹0 L/yr |
Foxconn
Flex
PEGATRON
Jabil