Filter interviews by
I applied via Walk-in and was interviewed before Jan 2022. There were 2 interview rounds.
The noted point refers to a specific point or detail that has been highlighted or emphasized.
The noted point is usually mentioned or marked for easy reference.
It can be a key piece of information or a significant aspect that requires attention.
For example, in a construction project, the noted point could be a safety guideline that must be strictly followed.
In a meeting, the noted point could be a critical decision or a...
To increase the capacity of hanging scaffolding, additional support systems can be used.
Use outriggers or counterweights to provide stability and balance.
Install diagonal braces to enhance the structural integrity.
Ensure proper anchoring and tie-backs to prevent movement.
Use stronger and thicker materials for the scaffold components.
Regularly inspect and maintain the scaffolding to identify any weaknesses or defects.
The number of degree ladder fixed depends on the specific requirements of the scaffolding project.
The number of degree ladder fixed can vary depending on the height and configuration of the scaffolding.
It is important to follow safety regulations and guidelines when determining the number of degree ladder fixed.
The scaffolding supervisor should assess the project requirements and consult with engineers or safety expert...
The number of degree bracings depends on the specific scaffolding design and requirements.
The number of degree bracings can vary based on the height and width of the scaffolding structure.
Degree bracings are used to provide stability and support to the scaffolding system.
The specific number of degree bracings needed will be determined by a qualified scaffolding engineer or supervisor.
Examples of degree bracings include...
I applied via Recruitment Consulltant and was interviewed before Jul 2021. There was 1 interview round.
There are several types of scaffolding used in construction projects.
Supported scaffolding: Most common type, supported by poles, frames, or outriggers.
Suspended scaffolding: Hangs from the roof or other overhead structure.
Rolling scaffolding: Equipped with wheels for easy movement.
Cantilever scaffolding: Supported by a series of needles and cantilevers.
Trestle scaffolding: Supported by movable tripods or ladders.
Steel...
Scaffolding in construction work refers to a temporary structure used to support workers and materials during building or maintenance projects.
Scaffolding provides a safe and stable platform for workers to perform tasks at heights.
It is typically made of metal pipes or tubes and is erected around the perimeter of a building or structure.
Scaffolding allows workers to access hard-to-reach areas and facilitates the moveme...
Top trending discussions
I applied via LinkedIn and was interviewed in Mar 2024. There was 1 interview round.
Hazards of work at height include falls, falling objects, unstable surfaces, and weather conditions.
Falls from height can result in serious injuries or fatalities
Objects falling from height can cause harm to workers below
Unstable surfaces such as ladders or scaffolding can lead to slips or falls
Weather conditions like wind or rain can increase the risk of accidents
Improper use of safety equipment can also contribute to
Hazard Control Hierarchy is a system used to prioritize and implement control measures to reduce or eliminate workplace hazards.
Hierarchy of controls ranks control measures from most effective to least effective: Elimination, Substitution, Engineering Controls, Administrative Controls, Personal Protective Equipment (PPE)
The goal is to eliminate or reduce hazards at the source rather than relying on PPE
Example: Instead ...
I applied via Referral and was interviewed before Jan 2021. There were 5 interview rounds.
Glass is a solid, transparent material made by heating a mixture of silica and other materials.
Glass is a non-crystalline, amorphous solid
It is made by heating a mixture of silica, soda ash, and lime
It can be molded into various shapes and sizes
It is used in windows, mirrors, lenses, and containers
Different types of glass include tempered, laminated, and stained glass
Graphene is a thin layer of pure carbon arranged in a hexagonal lattice.
It is the thinnest material known to man
It is a good conductor of electricity and heat
It is incredibly strong and flexible
It has potential applications in electronics, energy, and medicine
I applied via Approached by Company and was interviewed in Feb 2023. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.
BMD for sway frame is a diagram showing the variation of bending moment along the length of the frame.
BMD for sway frame will have a shape similar to a zigzag pattern due to the presence of sway in the frame.
The bending moment will be maximum at the points where the frame experiences maximum sway.
The BMD can be drawn by analyzing the internal forces and moments acting on the frame.
Drawing piperack elevations involves creating detailed drawings of the structure from different viewpoints.
Start by determining the dimensions and layout of the piperack
Use software like AutoCAD to create accurate and detailed drawings
Include all necessary details such as pipe sizes, supports, and connections
Label all components clearly for easy understanding
Review and revise the drawings as needed for accuracy
I appeared for an interview in Apr 2024.
I shifted to pursue new opportunities for growth and development in my career.
Seeking new challenges and responsibilities
Exploring different industries or technologies
Relocation for personal reasons or family commitments
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Minimum gap between two structures for seismic point of view is typically around 1.5 times the height of the taller structure.
Minimum gap is usually 1.5 times the height of the taller structure to reduce seismic interaction.
This gap helps prevent collision or structural damage during an earthquake.
Building codes and regulations may specify minimum gaps for seismic safety.
Example: If one building is 100 feet tall, the m...
based on 1 interview
Interview experience
based on 9 reviews
Rating in categories
Piping Engineer
71
salaries
| ₹4.4 L/yr - ₹16 L/yr |
Piping Supervisor
65
salaries
| ₹3.9 L/yr - ₹16 L/yr |
Planning Engineer
43
salaries
| ₹4 L/yr - ₹16.9 L/yr |
Safety Officer
43
salaries
| ₹4.8 L/yr - ₹14.1 L/yr |
HSE Officer
39
salaries
| ₹4.9 L/yr - ₹16.1 L/yr |
Alstom Transportation
Saint-Gobain
AECOM
AtkinsRealis