Filter interviews by
I applied via Referral and was interviewed in May 2019. There were 3 interview rounds.
RTD stands for Resistance Temperature Detector.
RTD is a type of temperature sensor that measures temperature by correlating the resistance of the RTD element with temperature.
It is commonly used in industrial applications where accuracy and stability are important.
RTDs are made of pure metals or alloys with a known temperature-resistance relationship, such as platinum.
They provide accurate and reliable temperature meas...
RTDs and thermocouples are both temperature sensors, but they differ in terms of principle, accuracy, range, and cost.
RTD stands for Resistance Temperature Detector, while thermocouple is a temperature sensor based on the Seebeck effect.
RTDs are more accurate and have a higher temperature range compared to thermocouples.
RTDs are more expensive than thermocouples.
RTDs have a linear relationship between resistance and te...
An analyser is a device that measures and analyzes the properties of a substance or sample.
Analyzers are used in various industries such as chemical, pharmaceutical, and food processing.
They can measure properties such as pH, temperature, pressure, and concentration of various substances.
Examples of analyzers include gas chromatographs, mass spectrometers, and spectrophotometers.
I applied via Internshala and was interviewed in Jun 2024. There was 1 interview round.
I applied via Walk-in and was interviewed in Jul 2024. There were 2 interview rounds.
Good interaction focus on logical thinking and numerical then grammer
Group discussion on artificial intelligence
N.C.L. Industries interview questions for popular designations
Get interview-ready with Top N.C.L. Industries Interview Questions
Time to remove formwork varies for different types of structural members.
Time to remove formwork for columns is typically 1-2 days
Time to remove formwork for beams is usually 7 days
Time to remove formwork for slabs can range from 7-28 days depending on the type of concrete used
Time to remove formwork for walls is generally around 24 hours
Different grades of cement refer to the varying strengths and compositions of cement used in construction.
Different grades of cement are classified based on their compressive strength, such as 33 grade, 43 grade, and 53 grade.
The higher the grade number, the higher the compressive strength of the cement.
Each grade of cement is suitable for different types of construction projects, with 53 grade cement being commonly us
I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.
I would analyze the reasons for not reaching the targets, adjust my strategies, seek feedback from colleagues, and work harder to meet the goals.
Analyze the reasons for not reaching the targets
Adjust sales strategies based on the analysis
Seek feedback from colleagues or supervisors for insights
Work harder and smarter to meet the sales targets
Set smaller achievable goals to track progress
I applied via Campus Placement and was interviewed in Mar 2024. There was 1 interview round.
REASONING VERBAL MATHEMATICAL ENGLISH
ARTHEMETIC
Top trending discussions
The duration of N.C.L. Industries interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 28 interviews
Interview experience
based on 410 reviews
Rating in categories
Senior Sales Officer
66
salaries
| ₹0 L/yr - ₹0 L/yr |
Sales Officer
62
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
52
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
42
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
26
salaries
| ₹0 L/yr - ₹0 L/yr |
UltraTech Cement
Ambuja Cements
ACC
Shree Cement