I appeared for an interview before Apr 2023.
BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars in a structural element.
BBS stands for Bar Bending Schedule
It is a detailed list of reinforcement bars in a structural element
It includes information like bar size, number of bars, length, shape, and placement
Concrete cube size refers to the dimensions of the cubes used for testing the compressive strength of concrete.
Standard concrete cube sizes are 150mm x 150mm x 150mm or 100mm x 100mm x 100mm.
These cubes are cast and cured for a specified period before being tested in a compression machine.
The compressive strength of concrete is determined by testing these cubes.
Different cube sizes may be used for specific projects or
Top trending discussions
posted on 3 May 2019
I feel confident and well-prepared for this interview.
I have thoroughly researched the company and the role
I have practiced common interview questions and my responses
I am showcasing my technical skills and experiences effectively
I would report the incident to the appropriate authority and follow the company's policy on reporting unethical behavior.
Confront the colleague and ask for an explanation
Check the company's policy on reporting unethical behavior
Report the incident to the appropriate authority
Maintain confidentiality and avoid gossiping about the incident
I handle stress by prioritizing tasks, taking breaks, and seeking support from colleagues.
Prioritize tasks to focus on what needs to be done first
Take short breaks to relax and recharge
Seek support from colleagues or mentors for guidance and advice
I handle stress in colleagues by maintaining open communication, offering support, and promoting a positive work environment.
Maintain open communication to address any issues or concerns
Offer support and assistance when needed
Promote a positive work environment through teamwork and collaboration
posted on 22 Feb 2022
I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.
posted on 26 Jun 2021
posted on 12 Jun 2021
I applied via Naukri.com and was interviewed in Dec 2020. There were 3 interview rounds.
I applied via Company Website and was interviewed in Jan 2022. There were 2 interview rounds.
The minimum diameter of a circular column depends on various factors such as load, height, and material.
The minimum diameter of a circular column is determined by the maximum load it needs to support.
The height of the column also influences the minimum diameter as taller columns require larger diameters for stability.
The material used for construction affects the minimum diameter as different materials have different s...
There are several tests conducted on concrete to ensure its quality and strength.
Some common tests for concrete include compressive strength test, slump test, and water absorption test.
Compressive strength test measures the maximum load a concrete sample can bear before failure.
Slump test measures the consistency and workability of fresh concrete.
Water absorption test determines the amount of water absorbed by concrete...
posted on 14 Feb 2024
posted on 25 Mar 2024
I applied via Naukri.com and was interviewed before Mar 2023. There was 1 interview round.
posted on 4 Apr 2025
I appeared for an interview before Apr 2024, where I was asked the following questions.
posted on 14 May 2022
I applied via Approached by Company and was interviewed in Apr 2022. There was 1 interview round.
Yes, I have 1 year of experience working with U-Girders in civil engineering projects.
I have worked on projects where U-Girders were used as a bridge deck support system.
I am familiar with the design and installation of U-Girders.
I have experience in conducting quality control checks on U-Girders during construction.
I am knowledgeable about the safety protocols that need to be followed while working with U-Girders.
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Civil Site Engineer
5
salaries
| ₹1.2 L/yr - ₹5 L/yr |
Project Manager
4
salaries
| ₹18.6 L/yr - ₹24 L/yr |
Structural Engineer
4
salaries
| ₹1.7 L/yr - ₹5 L/yr |
Accounts Manager
4
salaries
| ₹5.6 L/yr - ₹7.2 L/yr |
Store Keeper
4
salaries
| ₹1.8 L/yr - ₹3.6 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures