MRF Tyres Production Planning and Control Officer Interview Questions and Answers

Updated 9 Jun 2024

MRF Tyres Production Planning and Control Officer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Nov 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

60 mins from your past studies of core

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed in Jul 2024.

Round 1 - Assignment 

Subcontractors planning Store related

Round 2 - Aptitude Test 

Planning for subcontractors

Round 3 - Aptitude Test 

Grn machine planning

Interview Preparation Tips

Interview preparation tips for other job seekers - Job work planning subconscious
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Maths, science,genral knowledge, technical questions

Round 3 - One-on-one 

(1 Question)

  • Q1. Introduce yourself,&they gone through my resume and questions related to my profile

Interview Preparation Tips

Interview preparation tips for other job seekers - Pls cam and cool 😎

Interview Questionnaire 

7 Questions

  • Q1. Mold related
  • Q2. What are child part anad standard items
  • Ans. 

    Child parts are components that make up a larger item, while standard items are pre-designed parts used in multiple products.

    • Child parts are used to create a larger item, such as a car engine being made up of multiple components.

    • Standard items are pre-designed parts that are used in multiple products, such as screws or bolts.

    • Child parts can be customized or modified to fit specific needs, while standard items are typic

  • Answered by AI
  • Q3. How many cavities are there
  • Ans. 

    The question is unclear and lacks context. Please provide more information.

    • Please provide more context or specify what type of cavities you are referring to.

    • Are you asking about cavities in a building or in a human body?

    • Without more information, it is impossible to answer this question accurately.

  • Answered by AI
  • Q4. How many plastic material
  • Ans. 

    The question is unclear and lacks context. Please provide more information.

    • Please clarify the context of the question.

    • Are you asking about the types of plastic materials available?

    • Or are you asking about the quantity of plastic materials needed for a project?

    • Without more information, it is difficult to provide a specific answer.

  • Answered by AI
  • Q5. How many types of material are there
  • Ans. 

    There are countless types of materials, ranging from natural to synthetic, organic to inorganic, and metals to plastics.

    • Materials can be classified based on their composition, properties, and usage.

    • Some common types of materials include metals, ceramics, polymers, composites, and semiconductors.

    • Natural materials include wood, stone, and animal products, while synthetic materials include plastics and synthetic fibers.

    • Ma...

  • Answered by AI
  • Q6. How many types of gate
  • Ans. 

    There are several types of gates used in construction projects.

    • Swing gate

    • Sliding gate

    • Rolling gate

    • Barrier gate

    • Turnstile gate

    • Vertical pivot gate

    • Bi-folding gate

    • Cantilever gate

  • Answered by AI
  • Q7. How does the part come out

I applied via Naukri.com and was interviewed before Dec 2019. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. What is takt time?
  • Ans. 

    Takt time is the rate at which a product must be produced to meet customer demand.

    • Takt time is calculated by dividing the available production time by the customer demand.

    • It helps in determining the production rate needed to meet customer demand.

    • Takt time is used in lean manufacturing to eliminate waste and improve efficiency.

    • For example, if the customer demand is 100 units per day and the available production time is ...

  • Answered by AI
  • Q2. What is line balancing?
  • Ans. 

    Line balancing is the process of evenly distributing work tasks among production line workers.

    • Line balancing aims to minimize idle time and maximize productivity.

    • It involves analyzing the tasks required in a production process and assigning them to workers in a way that optimizes efficiency.

    • The goal is to ensure that each worker has a similar workload and that no worker becomes a bottleneck.

    • Line balancing can be achiev...

  • Answered by AI
  • Q3. What is lean and Kannan?
  • Q4. What is man management?
  • Ans. 

    Man management is the process of effectively leading and directing a team of individuals towards achieving a common goal.

    • It involves motivating and inspiring team members

    • It requires effective communication and delegation skills

    • It involves setting clear goals and expectations

    • It requires the ability to handle conflicts and resolve issues

    • It involves providing feedback and recognition to team members

    • Examples include managi...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - It's operations management oriented organization, hence prepare accordingly.

MRF Tyres Interview FAQs

How many rounds are there in MRF Tyres Production Planning and Control Officer interview?
MRF Tyres interview process usually has 2 rounds. The most common rounds in the MRF Tyres interview process are Aptitude Test and Resume Shortlist.

Tell us how to improve this page.

MRF Tyres Production Planning and Control Officer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Bosch Interview Questions
4.2
 • 328 Interviews
Exide Industries Interview Questions
3.5
 • 168 Interviews
UNO Minda Interview Questions
4.0
 • 168 Interviews
Ceat Tyres Interview Questions
4.0
 • 161 Interviews
Yazaki Interview Questions
3.8
 • 134 Interviews
Apollo Tyres Interview Questions
4.0
 • 129 Interviews
Hitachi Astemo Interview Questions
4.1
 • 103 Interviews
Aptiv Interview Questions
3.5
 • 94 Interviews
JK Tyres Interview Questions
3.7
 • 93 Interviews
View all
MRF Tyres Production Planning and Control Officer Salary
based on 7 salaries
₹4.4 L/yr - ₹7.5 L/yr
39% more than the average Production Planning and Control Officer Salary in India
View more details

MRF Tyres Production Planning and Control Officer Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Production Supervisor
531 salaries
unlock blur

₹1.8 L/yr - ₹5.5 L/yr

Junior Officer
378 salaries
unlock blur

₹2.8 L/yr - ₹6 L/yr

Territory Sales Supervisor
308 salaries
unlock blur

₹4.3 L/yr - ₹8 L/yr

Production Officer
240 salaries
unlock blur

₹3 L/yr - ₹6.6 L/yr

Operation Assistant
239 salaries
unlock blur

₹2.8 L/yr - ₹4.7 L/yr

Explore more salaries
Compare MRF Tyres with

Apollo Tyres

4.0
Compare

Ceat Tyres

4.0
Compare

Balkrishna Industries

4.0
Compare

JK Tyres

3.6
Compare
Did you find this page helpful?
Yes No
write
Share an Interview