Filter interviews by
Clear (1)
I applied via LinkedIn and was interviewed before Nov 2022. There were 2 interview rounds.
Shrink is the reduction in size of a plastic part during cooling, while shrinkage refers to the percentage of size reduction. 2plate and 3plate molds are types of injection molds used in plastic part manufacturing.
Shrink is caused by the cooling and solidification of the plastic material.
Shrinkage is expressed as a percentage and is calculated by comparing the dimensions of the molded part to the dimensions of the mold...
Injection molding is a manufacturing process used to produce parts by injecting molten material into a mold.
It is a widely used manufacturing process in various industries.
The molten material is typically a thermoplastic or thermosetting polymer.
The material is injected into a mold cavity under high pressure.
Once cooled and solidified, the mold is opened, and the part is ejected.
Injection molding allows for the product...
Mold temp refers to the temperature of the mold used in the injection molding process.
Mold temp is a critical factor in determining the quality and properties of the final product.
It affects the cooling rate of the molten material inside the mold.
Maintaining proper mold temp helps in achieving consistent part dimensions and minimizing defects.
Examples: High mold temp can lead to longer cooling times but better surface ...
Shrinkage value of a material refers to the amount by which the material contracts or shrinks during the cooling process after being molded or formed.
Shrinkage value is typically expressed as a percentage of the original size of the material.
It is an important factor to consider in manufacturing processes, especially in injection molding and casting.
Different materials have different shrinkage values, so it is crucial ...
Top trending discussions
posted on 6 Apr 2024
I applied via Referral and was interviewed in Mar 2024. There was 1 interview round.
posted on 24 Aug 2023
I applied via Naukri.com and was interviewed in Feb 2023. There were 3 interview rounds.
The current company follows a systematic process for production to ensure efficiency and quality.
The production process starts with planning and scheduling of orders.
Raw materials are sourced and inspected for quality before being used in production.
Machinery and equipment are maintained regularly to ensure smooth operations.
Quality control checks are conducted at various stages of production to maintain high standards...
Problem during production requires quick identification, analysis, and resolution to minimize downtime and ensure quality output.
Quickly identify the root cause of the problem
Analyze the impact on production schedule and quality
Implement immediate corrective actions to resolve the issue
Communicate with relevant stakeholders to keep them informed
Document the problem and solution for future reference
posted on 22 Jan 2025
I was interviewed before Jan 2024.
Mathematics for basic classes 8 to 10.
I have 5 years of experience in physical metallurgy, including conducting research on alloy development and analyzing microstructures.
Conducted research on alloy development to improve material properties
Analyzed microstructures using microscopy techniques
Worked on heat treatment processes to optimize material performance
I am motivated to seek employment with your company because of your reputation for innovation and commitment to employee development.
I am impressed by the company's track record of success and growth.
I am excited about the opportunity to work with cutting-edge technology and contribute to impactful projects.
I value a company that invests in its employees' professional growth and development.
I am drawn to the company's
Mathamatics resoning
I applied via Company Website and was interviewed before Dec 2021. There were 2 interview rounds.
Maintain production quantity and quality output by optimizing processes, training employees, and monitoring performance.
Regularly review and optimize production processes to eliminate inefficiencies and reduce waste.
Provide ongoing training and development opportunities for employees to improve their skills and knowledge.
Implement quality control measures to ensure that products meet or exceed customer expectations.
Mon...
posted on 5 May 2024
I applied via Walk-in and was interviewed before May 2023. There was 1 interview round.
I applied via Referral and was interviewed in May 2021. There were 3 interview rounds.
Productivity is the measure of efficiency in completing a task or achieving a goal.
It is the ratio of output to input.
It can be improved by optimizing processes and utilizing resources effectively.
Examples include completing tasks in less time, producing more output with the same resources, and reducing waste.
Productivity is important for businesses to remain competitive and profitable.
I applied via Referral and was interviewed before Sep 2021. There was 1 interview round.
OEE stands for Overall Equipment Effectiveness. It is a measure of how effectively a manufacturing operation is utilized.
OEE is calculated by multiplying Availability, Performance, and Quality.
Availability measures the percentage of time the equipment is available for production.
Performance measures the speed at which the equipment runs compared to its maximum speed.
Quality measures the percentage of good quality produ...
Just in time line refers to a production strategy where materials are delivered just in time for production.
It is a lean manufacturing approach
It aims to reduce inventory costs and waste
It requires close coordination between suppliers and manufacturers
Examples include Toyota's production system and Dell's supply chain management
posted on 19 Oct 2021
I applied via Naukri.com and was interviewed before Oct 2020. There was 1 interview round.
based on 2 interviews
Interview experience
based on 2 reviews
Rating in categories
Engineer
307
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
281
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
259
salaries
| ₹0 L/yr - ₹0 L/yr |
Trainee Technician
239
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
236
salaries
| ₹0 L/yr - ₹0 L/yr |
Bharat Forge
Sundaram Clayton
Rane Group
UNO Minda