Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. 1.cable tery type. 2. Test perfom at C.T 3. HT and LT bracker 4.SeF Ref protection
  • Q2. Type of cable tray and their saport
  • Ans. 

    Different types of cable trays include ladder, perforated, solid bottom, wire mesh, and trough.

    • Ladder cable trays have horizontal cross members resembling a ladder.

    • Perforated cable trays have small holes for ventilation and drainage.

    • Solid bottom cable trays have a solid base for supporting cables.

    • Wire mesh cable trays have a grid-like structure for easy cable installation.

    • Trough cable trays have a U-shaped design for c

  • Answered by AI
  • Q3. Rule of cable laying.
  • Ans. 

    The rule of cable laying involves proper planning, routing, securing, and labeling of cables to ensure safety and efficiency.

    • Plan the cable routes to avoid interference with other systems or equipment.

    • Secure cables properly to prevent damage or accidents.

    • Label cables clearly for easy identification and maintenance.

    • Follow local regulations and standards for cable laying practices.

    • Consider factors like cable length, bend...

  • Answered by AI
  • Q4. What is anty carosan pest
  • Ans. 

    Anticarsia gemmatalis, also known as the velvetbean caterpillar, is a common pest in agriculture.

    • Anticarsia gemmatalis is a species of moth in the family Erebidae.

    • It is a major pest of soybean crops, feeding on the leaves and causing significant damage.

    • Control measures for velvetbean caterpillars include biological control agents, insecticides, and crop rotation.

    • Monitoring for early signs of infestation can help preven

  • Answered by AI
  • Q5. Tell about GA drawings
  • Ans. 

    General Arrangement drawings show the overall layout of electrical systems in a building or structure.

    • GA drawings provide an overview of the entire electrical system layout

    • They include details such as equipment locations, cable routing, and connection points

    • These drawings are essential for understanding the overall design and installation of electrical systems

    • Examples of GA drawings include floor plans with electrical ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - If learn power plant, than join UPL .
Joint venture

I applied via Approached by Company and was interviewed before Jun 2020. There were 2 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Power factor corection methods Load flow analysis Different type of transformer test
  • Ans. 

    Power factor correction methods, load flow analysis, and different types of transformer tests are important topics in operations management.

    • Power factor correction methods are used to improve the power factor of electrical systems, which helps in reducing energy losses and improving efficiency.

    • Load flow analysis is a technique used to study the flow of power in an electrical network, helping in determining voltage leve...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Tata Power Delhi Distribution Operations Manager interview:
  • Electeical
  • Cyme
Interview preparation tips for other job seekers - Read power system analysis

I applied via Approached by Company and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Asked about the Solar O&M briefly
  • Q2. Related to job responsibilities

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep update the resume daily in Naukri portal and chances to get more calls from the companies
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is the process de-ashing the from esp to silo.
  • Ans. 

    De-ashing process from ESP to silo involves several steps.

    • The ash is collected in hoppers located at the bottom of the ESP.

    • The ash is then transported to the silo using a pneumatic conveying system.

    • The ash is stored in the silo until it can be disposed of properly.

    • Regular maintenance of the ESP and pneumatic conveying system is necessary to ensure efficient de-ashing.

    • Proper safety measures must be taken during the de-a

  • Answered by AI
  • Q2. What is the capacity of esp hoppers.
  • Ans. 

    The capacity of ESP hoppers varies depending on the size and model of the equipment.

    • ESP hoppers can range from a few hundred cubic feet to several thousand cubic feet in capacity.

    • The capacity can also depend on the type of material being collected in the hopper.

    • It is important to regularly monitor and maintain the hopper to prevent overfilling and potential equipment damage.

  • Answered by AI
Round 3 - One-on-one 

(1 Question)

  • Q1. I will pay you only this.

Interview Preparation Tips

Interview preparation tips for other job seekers - Worst things going inside the company they just making everyone life & growth in danger.

I applied via Campus Placement and was interviewed in Jul 2022. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Tell me about yourself , and why did you choose civil engineering
Round 2 - Technical 

(1 Question)

  • Q1. Some questions related to my internships, reinforcement details , and some related to rebars

Interview Preparation Tips

Topics to prepare for Assystem Graduate Engineer Trainee (Get) interview:
  • Reinforcement
  • Water Treatment Plant
Interview preparation tips for other job seekers - Be thorough with your internship works , and be strong with your basics, and the other thing is you must be very confident while answering

I applied via Company Website and was interviewed in Jan 2022. There were 5 interview rounds.

Round 1 - Technical 

(10 Questions)

  • Q1. As for drawing work and excavation work
  • Q2. Excavation proper level and drawing work
  • Q3. Level and coordinate proper work
  • Q4. Drawing for BBS and shuttering work
  • Q5. Management rebar and shuttering
  • Q6. As for drawing work and drawing proper seen
  • Q7. Work in experience 3 years
  • Q8. DPR and work timely and work Target
  • Q9. Dailly duty and emergency work holidays
  • Q10. Concrete work level and finishing work fine
  • Ans. 

    My concrete work level is excellent and I have experience in various finishing techniques.

    • I have experience in pouring and leveling concrete for foundations, walls, and slabs.

    • I am skilled in using various finishing techniques such as troweling, stamping, and staining.

    • I pay close attention to detail to ensure a smooth and even finish.

    • I am knowledgeable in the proper curing and sealing of concrete to ensure its longevity...

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. Rebar and shuttering work
Round 3 - Technical 

(1 Question)

  • Q1. BBS for drwaing work
  • Ans. 

    BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars in a structure.

    • BBS is used in drawing work to ensure the correct amount of reinforcement is used in a structure.

    • It includes details such as bar diameter, length, shape, and placement.

    • BBS helps in estimating the amount of steel required for a project and also helps in cost estimation.

    • It is an important part of the construction process an...

  • Answered by AI
Round 4 - Technical 

(1 Question)

  • Q1. Rebar and shuttering work
Round 5 - Technical 

(2 Questions)

  • Q1. Drawing for level and Finnish
  • Q2. Coordinate proper and management

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil engineer work Reinforcement and shuttering and concrete work

I applied via Company Website and was interviewed in Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Which method following in store
  • Ans. Material received & issue in system, documents verification,mis report, inventory management,
  • Answered Anonymously
  • Q2. Which system use in previous company?
  • Ans. 

    We used an ERP system called SAP in my previous company.

    • Previous company used SAP as the primary system.

    • SAP helped in streamlining business processes and improving efficiency.

    • It integrated various departments like finance, HR, and supply chain.

    • SAP provided real-time data and analytics for informed decision-making.

    • Employees were trained to use SAP for their respective roles.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Best policy & rools regulations,
Vision and mission are Great,
Work sop best policy
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. How do you manage channel marketing?
  • Ans. 

    I manage channel marketing by developing strategies, analyzing data, and collaborating with cross-functional teams.

    • Developing and executing channel marketing strategies

    • Analyzing data to measure effectiveness and optimize campaigns

    • Collaborating with cross-functional teams to ensure alignment and maximize impact

    • Managing budgets and resources to achieve goals

    • Staying up-to-date with industry trends and best practices

    • Exampl...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared with subject knowledge. Company is open to hire good people.

I applied via Company Website and was interviewed in Oct 2021. There were 5 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. Why you are leaving your previous company ?
  • Ans. 

    Seeking new challenges and growth opportunities.

    • Looking for a company that aligns better with my career goals.

    • Desire to work on more complex projects.

    • Seeking a better work-life balance.

    • Company downsizing or restructuring.

    • Limited opportunities for advancement or professional development.

    • Relocation or personal reasons.

  • Answered by AI
  • Q2. Technical skill questions?
  • Ans. Need to know all testing about electrical equipment
  • Answered Anonymously
  • Q3. Testing about all electrical equipment ?
  • Q4. Relay testing questions?
  • Q5. Drwaing related questions?
  • Q6. CT knee point voltage

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be positive and confident own yourself and need to know all testing and erection related answers.
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. On resume related, GD & T, compressor basics

Interview Preparation Tips

Interview preparation tips for other job seekers - Study your own resume. Gd &T, compressor basics

Tell us how to improve this page.

Interview Questions from Similar Companies

Vestas Interview Questions
4.3
 • 81 Interviews
ReNew Interview Questions
4.2
 • 80 Interviews
Jakson Group Interview Questions
4.3
 • 74 Interviews
Wind World Interview Questions
3.9
 • 70 Interviews
Siemens Energy Interview Questions
4.2
 • 67 Interviews
Waaree Energies Interview Questions
3.9
 • 54 Interviews
Greenko Group Interview Questions
3.8
 • 44 Interviews
View all

Monarch Energy Reviews and Ratings

based on 1 review

1.0/5

Rating in categories

1.0

Skill development

1.0

Work-Life balance

1.0

Salary & Benefits

1.0

Job Security

1.0

Company culture

1.0

Promotions/Appraisal

1.0

Work Satisfaction

Explore 1 Review and Rating
HR Executive
3 salaries
unlock blur

₹2 L/yr - ₹3 L/yr

Sales Manager
3 salaries
unlock blur

₹9.5 L/yr - ₹10 L/yr

Explore more salaries
Compare Monarch Energy with

Jakson Group

4.3
Compare

ReNew

4.2
Compare

Vestas

4.3
Compare

Wind World

3.9
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview