Upload Button Icon Add office photos

Filter interviews by

Modern Road Makers Interview Questions, Process, and Tips

Updated 2 Jul 2024

Top Modern Road Makers Interview Questions and Answers

View all 7 questions

Modern Road Makers Interview Experiences

Popular Designations

2 interviews found

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jun 2024.

Round 1 - HR 

(6 Questions)

  • Q1. For M-25 grade water cement ratio?
  • Ans. 

    The water cement ratio for M-25 grade concrete is typically around 0.45.

    • The water cement ratio for M-25 grade concrete is usually in the range of 0.45 to 0.5

    • It is important to maintain the correct water cement ratio to ensure the strength and durability of the concrete

    • Excess water can weaken the concrete and lead to cracking and other issues

  • Answered by AI
  • Q2. Maximum cement uses in RCC?
  • Ans. 

    The maximum cement usage in RCC is typically around 450 kg/m3.

    • Maximum cement content is usually limited to around 450 kg/m3 in order to prevent excessive heat generation and cracking.

    • Higher cement content can lead to increased shrinkage and reduced workability of the concrete mix.

    • Excessive cement usage can also result in higher costs and environmental impact.

    • It is important to carefully balance the cement content with ...

  • Answered by AI
  • Q3. Agg maximum water absorption?
  • Ans. 

    Agg maximum water absorption refers to the maximum amount of water a material can absorb.

    • Agg maximum water absorption is an important factor in determining the quality of aggregates used in construction.

    • It is typically measured by soaking the aggregate in water for a specific period of time and then determining the increase in weight.

    • Higher water absorption can indicate the presence of pores or cracks in the aggregate,...

  • Answered by AI
  • Q4. What do you understand by acceptance criteria?
  • Ans. 

    Acceptance criteria are the conditions that a product or service must meet to be accepted by the customer or stakeholders.

    • Acceptance criteria are defined in collaboration with stakeholders to ensure that the product meets their expectations.

    • They are specific, measurable, achievable, relevant, and time-bound (SMART).

    • Examples of acceptance criteria include performance benchmarks, functionality requirements, and quality s...

  • Answered by AI
  • Q5. Concrete cube testing formula?
  • Ans. 

    The formula for concrete cube testing involves calculating the compressive strength of the concrete sample.

    • The formula for calculating compressive strength is F = P/A, where F is the compressive strength, P is the maximum load applied to the cube, and A is the cross-sectional area of the cube.

    • The compressive strength is usually reported in megapascals (MPa).

    • The formula is used to determine the quality and strength of t...

  • Answered by AI
  • Q6. How do you do batching plant RMC moisture correction and manage correction?
  • Ans. 

    Batching plant RMC moisture correction involves testing moisture content of raw materials, adjusting water-cement ratio, and monitoring throughout production process.

    • Test moisture content of raw materials before batching

    • Adjust water-cement ratio based on moisture content to achieve desired consistency

    • Monitor moisture levels throughout production process and make corrections as needed

    • Use moisture probes or meters to acc

  • Answered by AI

Laboratory Supervisor Interview Questions asked at other Companies

Q1. How do you do batching plant RMC moisture correction and manage correction?
View answer (1)

I applied via Company Website and was interviewed before Dec 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. How to resolve IP conflict issue
  • Ans. 

    IP conflict can be resolved by releasing and renewing IP address, checking for duplicate IP addresses, and configuring DHCP.

    • Release and renew IP address using command prompt or network settings

    • Check for duplicate IP addresses in the network

    • Configure DHCP to assign unique IP addresses to devices

    • Use static IP addresses for devices that require a fixed IP address

    • Restart the router or switch if necessary

  • Answered by AI
  • Q2. What is the work AVC
  • Ans. 

    AVC stands for Audio Video Coding. It is a process of compressing digital audio and video signals for transmission and storage.

    • AVC is used in various applications such as Blu-ray discs, digital television, and streaming services like Netflix and YouTube.

    • It uses various compression techniques such as intra-frame and inter-frame compression to reduce the size of audio and video files.

    • AVC is also known as H.264, which is ...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Salary discuss and location
  • Q2. Leave company policy

Interview Preparation Tips

Interview preparation tips for other job seekers - IRB is a to much big group I am very happy to I have and will my skill provide to IRB group

Skills evaluated in this interview

Senior Hardware Engineer Interview Questions asked at other Companies

Q1. What is prelayout signal integrity? How will you do that
View answer (1)

Jobs at Modern Road Makers

View all

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. System implementation process
  • Ans. 

    System implementation process involves planning, designing, testing, and deploying new software or hardware systems.

    • Planning phase involves defining project scope, setting goals, and creating a timeline.

    • Design phase includes creating system architecture, database design, and user interface.

    • Testing phase involves conducting various tests to ensure system functionality and performance.

    • Deployment phase includes installing...

  • Answered by AI
  • Q2. Role and responsibilities to monitor performance.
  • Ans. 

    Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.

    • Set clear performance expectations for team members

    • Provide regular feedback on performance

    • Track progress towards goals and objectives

    • Address any performance issues promptly and constructively

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Civil engineering
  • Q2. Civil engineering responsibility timely site work .
Round 3 - Technical 

(2 Questions)

  • Q1. Civil engineering
  • Q2. Site relative question
Round 4 - Technical 

(2 Questions)

  • Q1. Site Execution qution
  • Q2. Highway Road Project qution

Interview Preparation Tips

Interview preparation tips for other job seekers - Bridges ,Highway Road Project and Railway Project flyovers
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jan 2025.

Round 1 - One-on-one 

(2 Questions)

  • Q1. What about last company working
  • Ans. 

    I worked at a software development company specializing in cloud solutions.

    • Developed and maintained cloud-based applications

    • Collaborated with cross-functional teams to troubleshoot and resolve technical issues

    • Participated in regular code reviews and testing processes

  • Answered by AI
  • Q2. How much experience you have in IT.
  • Ans. 

    I have 5 years of experience in IT, specializing in network infrastructure and system administration.

    • 5 years of experience in IT

    • Specializing in network infrastructure and system administration

    • Certifications in Cisco CCNA and Microsoft MCSA

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Why you are looking for job in IRB
  • Ans. 

    I am looking for a job in IRB because of the company's reputation for innovation and growth opportunities.

    • Interested in working for a company known for innovation

    • Seeking growth opportunities within the organization

    • Impressed by IRB's reputation in the industry

  • Answered by AI
  • Q2. How much salary do you want in IRB.
  • Ans. 

    I am looking for a competitive salary that reflects my skills and experience in the industry.

    • Research the average salary range for System Engineers in the industry and location

    • Consider your level of experience, certifications, and skills when determining your salary expectations

    • Be prepared to negotiate based on the benefits package offered by the company

    • Provide a salary range rather than a specific number to allow for

  • Answered by AI
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-

I was interviewed in Mar 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Sir, Can I got Company Details ?
  • Q2. Sir, Can I know Interview process?

Interview Preparation Tips

Interview preparation tips for other job seekers - Dear sir,
This is with reference to your job requirement the position of SME I am interested in this position and would appreciate your consideration as a candidate for this role. I believe that my skills. qualifications make me a suitable candidate for the job. I'm working @ SAKTHI ASSOCIATES from 2018 June till Know. Currently my project work @EPIL (Engineering Project India Limited) I have completed B.Tech in Civil from Bharath university. I have Experience in Site Engineering 4+ Years . I have Completed project
1.ETP (Effluent Treatment plant )
2.RO ( Reverse Osmosis)
3.Weaving Shead Textile Industry
4.TCL Chinese pvt Ltd
5. Residential building G+ 4
I am confident that my skills will be the right fit for the job Please find the attached CV in the email for further reference.

Thank you for your time and consideration

I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. NEUTRAL AXIS IN RCC STRUCTURE
  • Ans. 

    The neutral axis is the line where the stress is zero in a reinforced concrete structure.

    • The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.

    • The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.

    • The position of the neutral axis affects the amount of reinforcement required in the tension zone.

    • The n...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - GRT TO WORK WITH THIS COMPANY
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Monster and was interviewed before Apr 2023. There were 3 interview rounds.

Round 1 - Assignment 

Question are hard in panel

Round 2 - HR 

(3 Questions)

  • Q1. What is the current ctc
  • Ans. 

    I am currently earning a salary of $60,000 per year.

    • My current annual salary is $60,000

    • I am earning $5,000 per month

    • My total compensation package is $60,000

  • Answered by AI
  • Q2. What is the company name
  • Ans. 

    The company name is XYZ Corporation, a leading data analytics firm specializing in providing insights for businesses.

    • XYZ Corporation is a data analytics firm

    • Specializes in providing insights for businesses

  • Answered by AI
  • Q3. Gammon India Ltd
Round 3 - Case Study 

It is very good in study for
Further studies.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Nov 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Earth moving Equipment, crusher plant,hotmix plant concrete plant, operation and maintenance
  • Q2. Plant and equipment related

I applied via LinkedIn and was interviewed in May 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Details about your self.
Round 3 - Technical 

(1 Question)

  • Q1. Question from subject.

Interview Preparation Tips

Interview preparation tips for other job seekers - Face interview with confidence. Interview process is very simple.

Modern Road Makers Interview FAQs

How many rounds are there in Modern Road Makers interview?
Modern Road Makers interview process usually has 2 rounds. The most common rounds in the Modern Road Makers interview process are HR, Resume Shortlist and Technical.
How to prepare for Modern Road Makers interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Modern Road Makers. The most common topics and skills that interviewers at Modern Road Makers expect are Quantity Surveying, Direct Tax, Industrial Relations, Statutory Compliance and Training Need Analysis.
What are the top questions asked in Modern Road Makers interview?

Some of the top questions asked at the Modern Road Makers interview -

  1. How do you do batching plant RMC moisture correction and manage correcti...read more
  2. How to resolve IP conflict is...read more
  3. For M-25 grade water cement rat...read more

Tell us how to improve this page.

Modern Road Makers Interview Process

based on 6 interviews

Interview experience

4.2
  
Good
View more

Modern Road Makers Reviews and Ratings

based on 38 reviews

3.6/5

Rating in categories

3.0

Skill development

3.6

Work-life balance

3.2

Salary

3.4

Job security

3.5

Company culture

2.7

Promotions

3.4

Work satisfaction

Explore 38 Reviews and Ratings
Traffic Analyst

Mumbai

8-10 Yrs

Not Disclosed

Explore more jobs
Executive Accountant
10 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Engineer
5 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Liaison Officer
5 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Mechanical Engineer
5 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Store Keeper
5 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Modern Road Makers with

Larsen & Toubro Limited

4.0
Compare

Ashoka Buildcon

4.1
Compare

IRB Infrastructure

4.0
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview