The water cement ratio for M-25 grade concrete is typically around 0.45.
The water cement ratio for M-25 grade concrete is usually in the range of 0.45 to 0.5
It is important to maintain the correct water cement ratio to ensure the strength and durability of the concrete
Excess water can weaken the concrete and lead to cracking and other issues
The maximum cement usage in RCC is typically around 450 kg/m3.
Maximum cement content is usually limited to around 450 kg/m3 in order to prevent excessive heat generation and cracking.
Higher cement content can lead to increased shrinkage and reduced workability of the concrete mix.
Excessive cement usage can also result in higher costs and environmental impact.
It is important to carefully balance the cement content with ...
Agg maximum water absorption refers to the maximum amount of water a material can absorb.
Agg maximum water absorption is an important factor in determining the quality of aggregates used in construction.
It is typically measured by soaking the aggregate in water for a specific period of time and then determining the increase in weight.
Higher water absorption can indicate the presence of pores or cracks in the aggregate,...
Acceptance criteria are the conditions that a product or service must meet to be accepted by the customer or stakeholders.
Acceptance criteria are defined in collaboration with stakeholders to ensure that the product meets their expectations.
They are specific, measurable, achievable, relevant, and time-bound (SMART).
Examples of acceptance criteria include performance benchmarks, functionality requirements, and quality s...
The formula for concrete cube testing involves calculating the compressive strength of the concrete sample.
The formula for calculating compressive strength is F = P/A, where F is the compressive strength, P is the maximum load applied to the cube, and A is the cross-sectional area of the cube.
The compressive strength is usually reported in megapascals (MPa).
The formula is used to determine the quality and strength of t...
Batching plant RMC moisture correction involves testing moisture content of raw materials, adjusting water-cement ratio, and monitoring throughout production process.
Test moisture content of raw materials before batching
Adjust water-cement ratio based on moisture content to achieve desired consistency
Monitor moisture levels throughout production process and make corrections as needed
Use moisture probes or meters to acc
I applied via AmbitionBox and was interviewed in Dec 2022. There were 2 interview rounds.
I don't have the available data
I applied via Walk-in and was interviewed before Jul 2020. There were 3 interview rounds.
posted on 28 Oct 2022
I applied via Recruitment Consulltant and was interviewed before Oct 2021. There were 3 interview rounds.
Not applicable , this was final round
I applied via Naukri.com and was interviewed in Jun 2021. There was 1 interview round.
I applied via Referral and was interviewed before Jul 2021. There was 1 interview round.
I applied via Referral and was interviewed in Feb 2020. There were 6 interview rounds.
posted on 7 Jun 2024
Absolute xpath specifies the complete path from the root element to the desired element, while relative xpath specifies the path relative to the current element.
Absolute xpath starts with a single forward slash (/) and is more specific.
Relative xpath starts with a double forward slash (//) and is more flexible.
Absolute xpath is more prone to breaking if the structure of the page changes.
Relative xpath is easier to main...
based on 2 interviews
Interview experience
based on 1 review
Rating in categories
Executive Accountant
10
salaries
| ₹3.3 L/yr - ₹5.1 L/yr |
Engineer
5
salaries
| ₹3.6 L/yr - ₹4.2 L/yr |
Liaison Officer
5
salaries
| ₹3.5 L/yr - ₹7.8 L/yr |
Mechanical Engineer
5
salaries
| ₹4 L/yr - ₹10.3 L/yr |
Assistant Store Keeper
5
salaries
| ₹2.4 L/yr - ₹3.3 L/yr |
Amazon Sellers Services
Primus Global Technologies
GAMMON INDIA
Practo