Modern Road Makers
Robustrade DMCC Interview Questions and Answers
Q1. How do you do batching plant RMC moisture correction and manage correction?
Batching plant RMC moisture correction involves testing moisture content of raw materials, adjusting water-cement ratio, and monitoring throughout production process.
Test moisture content of raw materials before batching
Adjust water-cement ratio based on moisture content to achieve desired consistency
Monitor moisture levels throughout production process and make corrections as needed
Use moisture probes or meters to accurately measure moisture content
Q2. For M-25 grade water cement ratio?
The water cement ratio for M-25 grade concrete is typically around 0.45.
The water cement ratio for M-25 grade concrete is usually in the range of 0.45 to 0.5
It is important to maintain the correct water cement ratio to ensure the strength and durability of the concrete
Excess water can weaken the concrete and lead to cracking and other issues
Q3. Maximum cement uses in RCC?
The maximum cement usage in RCC is typically around 450 kg/m3.
Maximum cement content is usually limited to around 450 kg/m3 in order to prevent excessive heat generation and cracking.
Higher cement content can lead to increased shrinkage and reduced workability of the concrete mix.
Excessive cement usage can also result in higher costs and environmental impact.
It is important to carefully balance the cement content with other materials like aggregates and water to achieve the d...read more
Q4. Agg maximum water absorption?
Agg maximum water absorption refers to the maximum amount of water a material can absorb.
Agg maximum water absorption is an important factor in determining the quality of aggregates used in construction.
It is typically measured by soaking the aggregate in water for a specific period of time and then determining the increase in weight.
Higher water absorption can indicate the presence of pores or cracks in the aggregate, which can affect the strength and durability of the concr...read more
Q5. Concrete cube testing formula?
The formula for concrete cube testing involves calculating the compressive strength of the concrete sample.
The formula for calculating compressive strength is F = P/A, where F is the compressive strength, P is the maximum load applied to the cube, and A is the cross-sectional area of the cube.
The compressive strength is usually reported in megapascals (MPa).
The formula is used to determine the quality and strength of the concrete mix.
Concrete cube testing is essential for ens...read more
Q6. How to resolve IP conflict issue
IP conflict can be resolved by releasing and renewing IP address, checking for duplicate IP addresses, and configuring DHCP.
Release and renew IP address using command prompt or network settings
Check for duplicate IP addresses in the network
Configure DHCP to assign unique IP addresses to devices
Use static IP addresses for devices that require a fixed IP address
Restart the router or switch if necessary
Q7. What is the work AVC
AVC stands for Audio Video Coding. It is a process of compressing digital audio and video signals for transmission and storage.
AVC is used in various applications such as Blu-ray discs, digital television, and streaming services like Netflix and YouTube.
It uses various compression techniques such as intra-frame and inter-frame compression to reduce the size of audio and video files.
AVC is also known as H.264, which is a widely used video compression standard.
It allows for hig...read more
Interview Process at Robustrade DMCC
Top Interview Questions from Similar Companies
Reviews
Interviews
Salaries
Users/Month