Filter interviews by
Be the first one to contribute and help others!
I applied via Approached by Company and was interviewed before May 2021. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Jan 2021. There were 5 interview rounds.
posted on 8 Sep 2021
I applied via Campus Placement and was interviewed before Sep 2020. There were 3 interview rounds.
Steel is a metal alloy made primarily of iron and carbon.
Steel is known for its strength, durability, and versatility.
It is used in construction, manufacturing, transportation, and many other industries.
Different types of steel can be created by varying the amount of carbon and other elements added to the alloy.
Stainless steel, for example, contains chromium and nickel to resist corrosion.
Steel can also be recycled, ma
The Steel Making Process and Prerequisites for Making a Steel Water Bottle
The steel making process involves converting iron ore into steel through various stages such as smelting, refining, and casting
Prerequisites for making a steel water bottle include obtaining high-quality steel, designing the bottle, and manufacturing it through processes such as stamping and welding
The Hall Herault process is a method for produci...
posted on 3 Oct 2022
I applied via LinkedIn and was interviewed before Oct 2021. There were 3 interview rounds.
posted on 18 May 2020
I applied via Naukri.com and was interviewed in Nov 2019. There were 3 interview rounds.
Control valve calibration involves adjusting the valve to ensure it operates within specified parameters.
Determine the valve's operating range and desired set points
Use a calibration bench or in-line calibration equipment to adjust the valve's position and response time
Verify the valve's performance using a flow meter or pressure gauge
Document the calibration process and results for future reference
posted on 1 Dec 2020
posted on 12 Aug 2024
I applied via Referral and was interviewed before Aug 2023. There were 2 interview rounds.
IBR stage wise inspection procedures involve thorough examination at different stages of a project to ensure quality and compliance.
IBR stands for In-Process Inspection, Testing, and Review
Inspection procedures are carried out at various stages of a project to check for quality and compliance
Each stage of inspection involves specific criteria and checks to be performed
Documentation of inspection results is crucial for
I applied via Approached by Company and was interviewed in Oct 2023. There were 3 interview rounds.
General discussion about my job
I applied via Naukri.com and was interviewed in Aug 2024. There was 1 interview round.
I have 5 years of welding experience in a manufacturing company where I was responsible for welding various metal components.
Worked as a welder for 5 years in a manufacturing company
Responsible for welding metal components
Experience with different welding techniques such as MIG, TIG, and stick welding
based on 6 reviews
Rating in categories
Store Incharge
5
salaries
| ₹2.7 L/yr - ₹4.2 L/yr |
Executive Accountant
5
salaries
| ₹2.4 L/yr - ₹3.6 L/yr |
Assistant Project Manager
4
salaries
| ₹4.3 L/yr - ₹7.8 L/yr |
Site Engineer
4
salaries
| ₹3.3 L/yr - ₹8 L/yr |
Senior Engineer
3
salaries
| ₹5.4 L/yr - ₹5.8 L/yr |
Everest Industries
Tata BlueScope Steel
Jindal Steel and Power
Pennar Industries