Filter interviews by
I applied via Naukri.com and was interviewed before Jan 2021. There were 4 interview rounds.
Regarding companies product and material required for product.
Top trending discussions
I was interviewed in Jan 2025.
Basic questions on electronic switches and electronics. Basic questions on coding
I was interviewed in Jan 2025.
I applied via Walk-in and was interviewed in Nov 2024. There were 6 interview rounds.
Experienced engineer with a background in mechanical and electrical engineering, specializing in project management and problem-solving.
Bachelor's degree in Mechanical Engineering from XYZ University
5+ years of experience working in the automotive industry
Proficient in CAD software such as SolidWorks and AutoCAD
Led a team of engineers to successfully launch a new product line
The toolroom is typically organized in a hierarchical structure with a manager overseeing toolmakers and machinists.
Typically led by a Toolroom Manager who oversees the operations
Toolmakers and machinists report to the Toolroom Manager
May have specialized teams for different types of tools or machinery
Collaborates closely with engineering and production departments
Mold maintenance involves regular cleaning, inspection, and repair of molds used in manufacturing processes.
Regularly clean molds to prevent buildup of residue or contaminants
Inspect molds for wear and tear, cracks, or other damage
Repair any issues found during inspection to ensure molds function properly
Store molds properly when not in use to prevent damage or contamination
Encourage a positive culture that fosters the development of new ideas and activities for improvement.
Corrective action is taken to address an existing issue, while preventive action is taken to avoid potential issues in the future.
Corrective action is reactive, addressing problems that have already occurred.
Preventive action is proactive, aiming to prevent problems from happening in the first place.
Corrective action focuses on fixing the root cause of a problem.
Preventive action focuses on identifying and eliminating ...
Preventive maintenance is scheduled maintenance performed on a regular basis to prevent breakdowns, while predictive maintenance uses data and analytics to predict when equipment will fail.
Preventive maintenance is scheduled at regular intervals to prevent breakdowns.
Predictive maintenance uses data and analytics to predict when equipment will fail.
Preventive maintenance is time-based, while predictive maintenance is c...
Breakdown maintenance is a type of maintenance where equipment is only repaired after it has broken down.
Breakdown maintenance is reactive in nature, as repairs are only done after a breakdown occurs.
It can lead to increased downtime and production losses.
This type of maintenance is usually more costly compared to preventive maintenance.
Examples include fixing a machine only when it stops working or repairing a vehicle
The frequency of preventive maintenance varies depending on the equipment and industry standards.
Frequency of preventive maintenance is typically determined by equipment manufacturer recommendations.
Some industries may have specific regulations or standards that dictate the frequency of preventive maintenance.
Factors such as usage, environmental conditions, and criticality of the equipment can also influence the freque...
Lifter pad and lifter are different components used in mechanical systems.
Lifter pad is a component used to support and lift heavy objects, while lifter is a device used to lift and move objects vertically.
Lifter pads are often made of rubber or other materials to provide cushioning and grip, while lifters can be hydraulic, pneumatic, or mechanical.
Lifter pads are stationary and provide a stable base for lifting, while...
The frequency of tool life refers to how often a tool needs to be replaced or maintained.
Frequency of tool life is determined by factors such as material being worked on, cutting speed, and tool material.
Higher cutting speeds or harder materials may require more frequent tool changes.
Regular maintenance and monitoring can help extend tool life and reduce frequency of replacements.
posted on 2 Oct 2024
I applied via Campus Placement and was interviewed in Sep 2024. There were 5 interview rounds.
Round 1 was aptitude round, it consisted of java and c++ snippets and we had to guess the output. Apart from that there were problems on speed, velocity, distance and time. Problems on word-letter patterns were also asked. The aptitude round had 30 questions and time given was 30 minutes.
Aptitude round was the only elimination round. The next following 4 rounds were non-elimination rounds. Coding test included 3 questions - 1 and half hour was given to solve the same. It is fine if you don't perform well here, since it is a non-elimination round. But try to solve 1 and half or 2 questions atleast. The questions were mainly based on 1d arrays, 2D arrays, strings and string arrays.
I am a recent graduate with a degree in engineering, eager to learn and grow in the field.
Recent graduate with a degree in engineering
Passionate about learning and growing in the field
Eager to apply theoretical knowledge to practical projects
Structure languages focus on procedures and functions, while object-oriented languages focus on objects and classes.
Structure languages use functions and procedures to manipulate data
Object-oriented languages use objects and classes to encapsulate data and behavior
Structure languages are more procedural in nature, while object-oriented languages are more modular and reusable
Examples of structure languages include C and...
OOPS concepts are fundamental to object-oriented programming and include inheritance, encapsulation, polymorphism, and abstraction.
Inheritance: A child class inherits properties and behaviors from a parent class. Example: Animal class can be a parent class with child classes like Dog and Cat inheriting its attributes.
Encapsulation: Bundling data and methods that operate on the data into a single unit. Example: A car ob...
The static keyword in programming is used to declare variables, functions, or classes that retain their values or state throughout the program's execution.
Static variables retain their values between function calls
Static functions can only be accessed within the same file
Static classes cannot be instantiated and have limited visibility
Static keyword can also be used in C++ to declare class members shared among all inst
The system architecture diagram for a web application project visually represents the components and their interactions.
Include components like client-side interface, server-side application, database, and external services
Show how these components communicate with each other
Consider scalability, security, and performance in the design
Use standard symbols and notations for clarity
Access modifiers in Java control the visibility of classes, methods, and variables.
There are four types of access modifiers in Java: public, private, protected, and default.
Public: accessible from any other class.
Private: only accessible within the same class.
Protected: accessible within the same package and subclasses.
Default: accessible only within the same package.
Example: public class MyClass { private int myVar; p
Encapsulation, Inheritance, Polymorphism, Abstraction
Encapsulation: Data hiding and bundling of data with methods. Example: Using private variables and public methods.
Inheritance: Reusing code and creating a hierarchy of classes. Example: Subclass inheriting properties and methods from a superclass.
Polymorphism: Ability to present the same interface for different data types. Example: Method overloading and overriding.
A...
A project is assigned to a group of students and we need to come up with an idea on how to implement that project as a team.
I am a recent graduate with a degree in engineering, eager to learn and grow in the field.
Recent graduate with a degree in engineering
Passionate about learning and growing in the field
Eager to apply theoretical knowledge to practical projects
posted on 13 Jan 2025
I applied via Job Portal and was interviewed in Dec 2024. There were 3 interview rounds.
posted on 5 Feb 2025
posted on 7 Jan 2025
I applied via Naukri.com and was interviewed in Dec 2024. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Oct 2024. There were 5 interview rounds.
Developing a successful project management strategy involves setting clear goals, creating a detailed plan, assigning tasks effectively, monitoring progress, and adapting to changes.
Set clear and achievable goals for the project
Create a detailed project plan outlining tasks, timelines, and resources
Assign tasks to team members based on their strengths and expertise
Monitor progress regularly and make adjustments as need...
The reason for change could be due to seeking new challenges, career advancement, better work-life balance, or personal growth.
Seeking new challenges in a different industry or role
Desire for career advancement and growth opportunities
Need for better work-life balance or reduced commute
Personal growth and development goals
The reason for change could be due to seeking new challenges, career advancement, better opportunities, or personal growth.
Seeking new challenges in a different environment
Desire for career advancement and growth
Better opportunities for professional development
Personal reasons such as relocation or lifestyle changes
Salary will be competitive and based on experience and qualifications.
Salary is competitive and based on experience
Negotiable based on qualifications
Benefits package may also be included
I applied via Walk-in and was interviewed in Oct 2024. There was 1 interview round.
To verify if a car is major accidental, check for signs of extensive damage and repair work.
Look for mismatched paint or panels indicating repair work
Check for signs of frame damage or structural issues
Inspect for any airbag deployment or replacement
Review the vehicle history report for any past accidents
Consult with a professional mechanic or body shop for a thorough inspection
To check apron replace, inspect for wear and tear, measure thickness, check for cracks or damage, and ensure proper alignment.
Inspect apron for wear and tear
Measure thickness of apron material
Check for cracks or damage on the apron
Ensure proper alignment of the apron
based on 1 interview
Interview experience
based on 9 reviews
Rating in categories
Sales Executive
7
salaries
| ₹1.8 L/yr - ₹3.8 L/yr |
Area Sales Manager
4
salaries
| ₹6.8 L/yr - ₹7.2 L/yr |
Sales & Service Engineer
4
salaries
| ₹1.1 L/yr - ₹2 L/yr |
HR Executive
3
salaries
| ₹3 L/yr - ₹3.2 L/yr |
Service Engineer
3
salaries
| ₹2.8 L/yr - ₹5 L/yr |
Siemens Healthineers
GE Healthcare
Philips
Dräger