Modbus settings are a set of parameters used to configure and control Modbus communication between devices.
Modbus settings include parameters such as baud rate, parity, data bits, and stop bits.
Baud rate determines the speed at which data is transmitted over the Modbus network.
Parity is used for error checking and can be set to none, even, or odd.
Data bits specify the number of bits used to represent each character.
Sto...
SCADA is a system for monitoring and controlling industrial processes, while HMI is a user interface that allows operators to interact with the SCADA system.
SCADA stands for Supervisory Control and Data Acquisition.
SCADA systems are used to monitor and control processes in industries such as manufacturing, power generation, and oil and gas.
HMI, or Human-Machine Interface, is the graphical user interface that allows ope...
Sink and source are terms used in electronics to describe the flow of current in a circuit.
A sink is a component that absorbs current flowing through a circuit.
A source is a component that provides current to a circuit.
In digital circuits, a sink is often used to pull a signal to a low state, while a source is used to drive a signal to a high state.
Examples of sink components include transistors, diodes, and resistors.
...
To diagnose a problem on site, one must follow a systematic approach and use various tools and techniques.
Start by gathering information about the problem and its symptoms
Use diagnostic tools such as multimeters, oscilloscopes, and thermal imaging cameras
Check for any error codes or fault messages
Inspect the physical components and connections for any damage or wear
Consult technical manuals and documentation for troubl...
Top trending discussions
posted on 30 Nov 2024
Basics aptitude likes time speed distance
I applied via Recruitment Consulltant and was interviewed in Nov 2024. There was 1 interview round.
I never imagined such kind of environment in EY that simply reschedule the interview without any reason probably interviewer was in mood of Friday finally she ready to schedule the interview on Tuesday, which she joined late and didn't start the camera, seems she is just doing formality on name of interview process.
Interviewer hardly any proper knowledge about project management, data center migration process, risk mitigation plans etc, once she failed to evaluate all these she asked me to stop and started asking directly from PMP book based question which is more into from some book or online source.
Capacity can be calculated by determining the maximum amount of work that can be completed in a given time period.
Calculate the total number of hours available for work in a specific time period
Determine the average amount of work that can be completed in one hour
Multiply the total hours available by the average amount of work per hour to get the capacity
Capacity = Total hours available * Average work completed per hou
Psychometric test. It was filled with confusing questions.
To complete the task in one week, prioritize tasks, allocate resources efficiently, set clear milestones, and communicate effectively with the client.
Prioritize tasks based on importance and urgency
Allocate resources effectively to ensure timely completion
Set clear milestones and deadlines to track progress
Communicate regularly with the client to provide updates and address any issues
Consider using project management t
I am an experienced Project Manager with a background in leading cross-functional teams to successful project completion.
Led multiple projects from initiation to closure, ensuring deliverables are met on time and within budget
Managed stakeholder expectations and communication throughout project lifecycle
Utilized project management tools such as Gantt charts, risk registers, and status reports
Facilitated team meetings a...
Project phases are distinct stages in a project's lifecycle, each with specific goals and deliverables.
Initiation: Define project scope, objectives, and stakeholders.
Planning: Develop project plan, schedule, and budget.
Execution: Implement project plan and deliver project deliverables.
Monitoring and Controlling: Track project progress and make necessary adjustments.
Closing: Finalize project deliverables and hand off to...
There were questions on Sql and python
1. Return the tuple set where sum is 25
2. Writebto a program to return 3rd highest salaried employee
1. Questions were on window functions
2. Python string operation questions
I handle estimations by thoroughly analyzing project requirements and creating detailed budgets in alignment with client expectations.
Conduct a comprehensive analysis of project requirements to determine resources needed
Create a detailed budget outlining costs for materials, labor, and any other expenses
Regularly communicate with the client to ensure budget alignment and address any changes or concerns
Utilize project m...
I was interviewed in May 2024.
Two parts first part technical second part logical maths and relation ques 1 hour
I applied via Referral and was interviewed in Apr 2024. There were 2 interview rounds.
It was a standard Aptitude for logical Reasoning.
I applied via Company Website and was interviewed in Mar 2024. There was 1 interview round.
Different engagement models/ contract types include fixed price, time and materials, and milestone-based contracts.
Fixed Price: Project cost is predetermined and does not change regardless of actual effort or time spent.
Time and Materials: Payment is based on actual time and materials used for the project.
Milestone-based: Payments are made upon completion of specific project milestones.
Cost Plus Fee: Project cost inclu...
Different delivery methodologies in project management include Agile, Waterfall, Scrum, Kanban, and Lean.
Agile: Iterative approach with frequent feedback and adaptability.
Waterfall: Sequential approach with distinct phases like planning, design, development, testing, and deployment.
Scrum: Framework with roles, events, and artifacts for iterative development.
Kanban: Visual management method to track work and limit work ...
based on 1 review
Rating in categories
Applications Engineer
9
salaries
| ₹2.4 L/yr - ₹6 L/yr |
Project Engineer
4
salaries
| ₹2.6 L/yr - ₹4.1 L/yr |
Automation Engineer
4
salaries
| ₹2.2 L/yr - ₹4.2 L/yr |
Electrical Engineer
3
salaries
| ₹2.4 L/yr - ₹3.5 L/yr |
Scada Engineer
3
salaries
| ₹1.5 L/yr - ₹2.7 L/yr |
Siemens
ABB
BHEL
Larsen & Toubro Limited